Water System Planning Study

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
© 2013 O’Brien & Gere Volute Press Application on Water Treatment Residuals 2013 NYC Watershed / Tifft Science & Technical Symposium September 19, 2013.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Stave Lake Water Supply & Treatment Project. Existing Water Supply System Norrish Creek Cannell Lake 19 Groundwater Wells.
Durham – Where Great Things Happen City of Durham Jordan Lake Allocation Request Presentation to the Jordan Lake Partnership March 21, 2014.
1 Water and Wastewater System Information. 2 PWCSA Water Purchase Key Points From April 21, 2008 Meeting With PWCSA PWCSA is willing to re-open discussions.
Loudoun Water’s Potomac Water Supply Program RWI/PRWPS- Request for Qualifications Pre-submittal Conference– July 9, 2013.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
BCRUA Deep Water Intake Alternative Site Study November 15, 2007.
Colorado Springs’ ASR Program Presented by Cortney Brand Western Water Workshop, Gunnison, CO July 28, 2005.
Membrane Softening Water Treatment Plant completed in –Upper Floridan groundwater wells provide the source water for treatment. –Treatment process.
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Key Elements of a Safe Water Supply An Adequate and Protected Water Source A Secondary Supply A Quality Treatment System An Adequate Finished Water Storage.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
Interlocal Cooperation for a Sustainable and Secure Water Supply Don Greeley Regional Managers Meeting April 8 th, 2014.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Agenda August 5, Introduction – Natalie Robottom 2.Background and History – Rob Delaune 3.Present Conceptual Engineering Design Proposed Tasks -
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
What is St. Paul Regional Water Services? Supplies Public with Water Department of the City of St. Paul Public Employees Governed by Board of Water Commissioners.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Raw and Finished Water System Improvements April 22, 2014.
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Alabama Water Resources Conference Perdido Beach, Alabama Mac Underwood, General Manager BWWB BIRMINGHAM WATER WORKS BOARD Sustainability of Water Supply.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Update on RCR Permitting
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
“Is User Pays Possible for a Remote Town Water Supply – Case Study”
Electrical Distribution Design Services
Richland Creek Water Supply Program Briefing
RUSSELL - ROSSBURN WATER SUPPLY
Kings Bluff Raw Water System Parallel Raw Water Main Project
Normanton/Karumba WTP Upgrade
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Perris Water Filtration Plant Membrane Upgrade – Phase I
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Redundancy and Emergency Interconnectivity (REI) Plan
Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Future Water Supply Evaluation
Brackish Water Desalination Project
October 29, 2018 Terry Lauritsen, P.E.
Southwest Section AWWA 2018 – Baton Rouge, LA
Brackish Water Desalination Project Draft EIR
City of Sunrise Wastewater Reuse Program
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Richland Creek Water Supply Program Program Update
Sludge Dewatering Filter Press Controls Upgrade at SSWRF
MANILLA WATER SUPPLY UPGRADE
Presentation transcript:

Water System Planning Study December 3, 2009

Agenda Purpose and Need Scope of Work Raw Water System Existing WTP Regulatory Issues Site Selection Proposed WTP Finished Water Transmission Proposed Improvements Costs Next Steps / Schedule

Purpose and Need WTP near capacity (currently 75%; KDOW sanctions at 85%) Aging water infrastructure Increasing demand Regulatory changes

Purpose and Need (cont.) Reliable supply needed Bluegrass Water Supply Commission Other alternatives studied City decided to build new WTP 5/08 Keep existing WTP in service

Scope of Work Evaluate existing systems and future needs Assess new and future regulatory changes Identify best site for WTP Recommend necessary system improvements

Raw Water Sources Kentucky River intake OK Maximum permitted withdrawal OK Changes in next permit (no step down) Concerns – Dam #10 condition, spills

Raw Water Sources Reservoir as backup supply Significant current leaks Siltation – lower intake clogged Aesthetic water quality issues 9 months of the year

Raw Water Pump Station 2 existing pumps – 5.5 mgd firm capacity Originally designed for 4 pumps – 15 mgd firm capacity Recommend 1 new pump for 2 operating with 1 standby – could deliver 14+ mgd to new WTP

Raw Water Transmission Main Existing 18” line over 50 years old Limited existing capacity New 30” needed to new site (lifespan 50+ years) Existing 18” to continue serving existing WTP and reservoir

Existing Water Treatment Plant Initially constructed 1891 Last major upgrade 1974 Currently rated at 5.3 mgd Reliable, sustainable 3.2 mgd

Existing Water Treatment Plant Need interim improvements: Replace filter media Sludge removal equipment Potential expansion not feasible on current site, based on 1999 studies