3 June 2003U. Frankenfeld1 TPC Detector Control System Status.

Slides:



Advertisements
Similar presentations
22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.
Advertisements

ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
The Detector Control System – FERO related issues
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Creation Of Control Systems In PVSS For Devices In The ALICE Detector A Large Ion Collider Experiment A dedicated heavy-ion detector at LHC (Large Hadron.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
MDT PS DCS for ATLAS Eleni Mountricha
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
André Augustinus 21 June 2004 DCS Workshop Follow-up from last workshop.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
ATLAS MDT HV – LV Detector Control System (DCS)
Alice TPC DCS.
TPC Detector Control System
Presentation transcript:

3 June 2003U. Frankenfeld1 TPC Detector Control System Status

3 June 2003U. Frankenfeld2 TPC sub-detectors and sub-systems TPC ROCField cageTh. ScreenLaser High Voltage Low Voltage High Voltage Cooling I monitor Cooling Laser Alignment FEE Cooling Pulser Gas Sys. Drift URD Prototype Production

3 June 2003U. Frankenfeld3 ROC Low Voltage Wiener PL 500 –5 channel/crate –1 - 2 channels per voltage for FEE Prototype used for tests –OPC from IT/CO Interface: Wiener OPC still beta version (delay ~1.5 y) Hardware limitation: –No indication of status (mainly needed for prototype and test, no access in Alice) –No individual switching –Setting voltages only if crate is off

3 June 2003U. Frankenfeld4 ROC High Voltage ISEG Prototype for tests Interface: OPC beta release (with problems) Final (and last) in June (working to specs?) –Final version: no individual switching on/off per channel Limitation of proto OPC (temporary solution) –No individual switching of channels –Not nice (but ok?) –No Hardware limitation (ref. to user manual)

3 June 2003U. Frankenfeld5 ROC Cooling Wago μPLC Prototype tested –Ok –Not radiation hard –Study of thermal behavior of ROC/FEE 2 nd Prototype: –ELMB solution –Under test/development at thermal Lab (CERN) –Set point for cooling plant Highest requirements on temperature stability –Prototype for all systems

3 June 2003U. Frankenfeld6 TPC-FEE DCS -> Ralf Ethernet switches in the Magnet? –Otherwise 216 cables

3 June 2003U. Frankenfeld7 Pulser URD available Development has started

3 June 2003U. Frankenfeld8 Field cage High Voltage –Offers for Power supply –Interface to SCADA system I monitor –Design of circuit started –Interface to SCADA system

3 June 2003U. Frankenfeld9 Laser No URD (on the way) Discussions started Items: –Control of the two Lasers –Mechanical control –Control of camera

3 June 2003U. Frankenfeld10 Gas system System is build (almost ready) Control by gas working group Link to DCS to be defined –Reading of status –Reading of temperatures –…. –Only reading, no control Additional Sensors –Drift Monitor –Pressure

3 June 2003U. Frankenfeld11 Controls Hierarchy To Devices (HW or SW) Action Status & Alarms ECS DCS TPC TRD FCROC Crat e LHC... Device Units Control Units Abstract levels... HV Cool.LV Crat e DAQHLT...

3 June 2003U. Frankenfeld12 Controls Hierarchy Start simple for CERN test LV an HV connection to devices –Prototype OPC with limited functionality Complexity growing with time –Integration of additional subsystems Final system: –Number of FSM? –Grouping? –Discussion with HMPID

3 June 2003U. Frankenfeld13 Miscellaneous Power for ELMBs (Switches, RCU DCS board?) What Sensors when and where? –Archiving Temperature sensors Additional Sensors –Pressure –???

3 June 2003U. Frankenfeld14 Summary Prototypes HV, LV & Cooling by Sorina Status –Prototypes will be used in sector test –URDs –Laser URD on the way Limitations: ISEG (OPC) and Wiener (Hardware + OPC) Cooling and Gas system: Hans