The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Constellation Heating and Cooling Building Automation Systems.
Generation Business Line
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
M N P Onshore & Offshore SHIPBUILDING PROJECTS JSC "KRASNOE SORMOVO" SHIPYARD"
Croatian Government’s Priorities in the Regulatory Area UNECE-SIDA “South East Europe Regulatory Project” Ljubljana, 8 June 2004.
Establishment of a Training Dosimetry Laboratory in Cairo University Dr. Hassan Fathy for NSPA.
Efficient flexibility in room management with SAUTER EY-modulo.
DEVELOPMENT OF THE JINR ENGINEERING INFRASTRUCTURE AND INFORMATION TECHNOLOGIES DURING G.Shirkov, JINR Chief Engineer 106 th JINR Scientific.
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Public Utility for water supply and sewage „Naissus“ Niš City of Niš, Serbia Local governments: helping each other?
1 Professor Ioannis Rampias, TEI of Athens and Ismailova Gulchehra Aripdjanovna, TSTU International Scientific Conference on "Energy and Climate Change"
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Carbon Management Steering Board 7 th October 2011 Physics Laser – case study CARBON MANAGEMENT BOARD – October 2011.
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
Quality Assurance/Quality Control Policy
Structure and Responsibility
Introduction to Engineering. Engineering (defined) 1.The art of applying scientific and mathematical principles, experience, judgment, and common sense.
The Komi Republic (KR)is the subject of the Russian Federation, a part of the North-West Federal District. Area thousand sq. km. Population -
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
Protection Against Occupational Exposure
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
School of Engineering & Electronics Safety Presentation.
1 106 th Session of the JINR Scientific Council Joint Institute for Nuclear Research On the Financial Support for the Seven-Year Plan for the Development.
RAO “UES of Russia” Action Plan on Reliability Improvement of Unified Power System of Russia August 29, 2005.
ICT business statistics and ICT sector: Uzbekistan’s experience Prepared by Mukhsina Khusanova.
1 G.Shirkov, JINR Scientific Council, SUPPLEMENTS TO THE PROGRAMME OF JINR’s SCIENTIFIC RESEARCH AND DEVELOPMENT FOR 2004–2009 I. JINR Engineering.
1 US DOE Education and Training Initiatives Charlie Harmon Office of National Infrastructure and Sustainability September 18, 2003 “ Nonproliferation Education.
Introduction to Workplace Safety
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
ISO training courses Developed by DOE and IBRAE RAN and conducted at the Training Center “Emergency Response” of the Institute for Advanced Training.
OSU-CHS ALARA Statement The OSU-CHS radiation safety program will be conducted in such a manner so that exposure to faculty, staff, students, the public,
Alaska Municipal League 59th Annual Local Government Conference The Programs of the Alaska Energy Authority Energy and Empowerment for Your Communities.
Introductory to the English “NMS” Model The English National Measurement System (NMS) is –in short – described, as illustration of an efficient National.
Institutionalizing Drinking Water Security: Making the Issues Real for Small System Capacity Development Joy Barrett Rural Community Assistance Partnership.
The automated system of maintenance of reliability and quality of equipment ASONIKA
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 The experience of the Republic of Belarus in the field of safe and secure transport of radioactive material. R. Astashka, Z. Kronava, A.Prykhodzka, I.Tkachonak.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Croatian Government’s Priorities in the Regulatory Area UNECE Round Table on Regulatory Cooperation in South East Europe Geneva, 22 November 2004.
DOE ASSET MANAGEMENT PLAN
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
I & C.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
E.ON Russia Production management September 2013 Deputy General Director on production Igor Popov.
Personal details: ENG.Iqbal AL-tayyar Bachelor in Mechanical Engineering from Kuwait university. Director of Technical Supervision Department. Applied.
1 Transitioning TAC I/A Series ™ to SmartStruxure ™ solution 11 June 2016.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Corporate Learning Center The AES group of companies in Kazakhstan.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
National Food Control Systems
Start the program by pressing “enter”.
IEC Inter-Company Education Centre – Škofja Loka
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Safety of Radioactive Waste Management in Uzbekistan
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Legal and Regulatory Framework for Nuclear Installations in IRAN
Presented By: T.M Ramashidzha Metrology Scientist
Presentation transcript:

The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative properties of the entire system: operability assurance of the JINR basic facilities; supply of energy resources; safety protection of vitally important and potentially dangerous elements of the JINR infrastructure communication service; DEVELOPMENT OF THE JINR ENGINEERING INFRASTRUCTURE 7-Year Plan ( ) (First approach)

BASIC FACILITIES G.Shirkov, JINR Scientific Council, Development of the JINR engineering infrastructure is the necessary condition for the operation of basic facilities and the basement for new facility creation according to the 7-Year Plan ( ). The programme of basic facilities development and creation is the subject of the 7-Year scientific programmes of JINR Laboratories. NICA-MPD DRIBs IBR-2M IREN

G.Shirkov, JINR Scientific Council, ENGINEERING INFRASTRUCTURE Electric power Heat supply Liquid nitrogen production Water supply Cooling systems Communication service SAFETY POLICY Radiation and nuclear safety Physical protection Industrial safety Labour protection Fire safety

ELECTRIC POWER G.Shirkov, JINR Scientific Council, At presentPlansGoals Main step-down station 1 (GPP-1) P=19 MW 2 transformers + 15 MW + 1 transformer LHEP (NICA) Main step-down station 2 (GPP-2) P=25 MW 2 transformers + 19 MW + 2 transformers DRIBs, IBR-2, Phasotron Other independent sources of electric power + 4 MW (Moscow Channel Company); +12 MW (autonomic power station) To release the load of the main step-down stations 1 and 2 Approx. cost ( ): ~ 4.3 M$ including budget: ~ 0.1 M$ to increase the total power; to improve reliability; to provide independent power supply of the basic facilities. Objectives:

HEAT AND WATER SUPPLY G.Shirkov, JINR Scientific Council, Boiler-houses and heat network: Automation of boiler-houses. Replacement of the steam- boiler in the East boiler-house. Reconstruction and replacement of the heat network. Heat control and accounting systems. Plan: Replacement of the outdated equipment Goal: Reliability, modern equipment, economy Water supply: Enlargement and reconstruction of the pumping-filtering station. Automation of the drinking water preparation. Reconstruction and replacement of the water pipes. Water accounting. Approx. cost ( ): ~14.1 M$ including budget: ~ 2.5 M$ Activities to be continued:

RADIATION SAFETY G.Shirkov, JINR Scientific Council, Objectives: Purchasing of devices and the equipment for the radiation control. Purchasing of a mobile radiological laboratory. (*) Reconstruction and development of new systems of the radiation control (e.g. IBR-2M, NICA, IREN). (*) Disposal of the used radioactive sources. Handling with the radioactive wastes. Metrological maintenance of the radiation control. Accreditation of the radiation control laboratory. (*) - financial means of JINR Laboratories Approx. cost ( ): ~ 0.5 M$

LABOUR PROTECTION AND INDUSTRIAL SAFETY G.Shirkov, JINR Scientific Council, Main Goals: Providing safe and healthy working conditions for personnel. Ensuring prescribed benefits and compensation for appropriate category of workers. Realization of preventive actions to avoid traumatism, industrial- caused diseases, and also emergencies and failures. Activities to be continued: Certification of workplaces in regard to working conditions to validate, in particular, available benefits and compensation for work in harmful and/or dangerous working conditions. Scheduled replacement of morally and physically outdated equipment and technical devices. Re-equipment of the JINR Industrial and Sanitary Lab with modern instrumentation to take more precisely measurements and online processing of parameters and levels of the harmful and dangerous production factors. Technical upgrade of workplaces of the specialists on labour protection in the JINR departments. Advanced training in the fields of labour and industrial safety for the JINR experts and department heads. The JINR University Center can be involved in this activity.

FIRE SAFETY G.Shirkov, JINR Scientific Council, FIRE STATION control panel GOALS: Re-equipment of the fire station with fire engineering. Modern control panel (GSM, large covering area, etc.). Gradual replacement of the RID-1 annunciators Persistent activities to maintain the JINR infrastructure in accordance with the fire safety requirements. JINR annunciators including ~3500 RID-1 which have to be replaced 7 automatic gas fire-fighting systems Approx. cost ( ): ~ 2 M$

TELEPHONY G.Shirkov, JINR Scientific Council, At Present: Analog station ( ) users (~3800 at JINR). Old network (copper wires). High energy consumption. Space requirement is around 950 m 2. No additional services (IP-telephony, etc.). Does not meet the modern requirements of Russian Federal regulations. In the Future: Digital electronic station. Scalability. Optical connection. Low cost of international and long distance calls. Floor space and electricity saving. Approx. cost: ~ 0.5 M$

G.Shirkov, JINR Scientific Council, SUMMARY Preliminary estimate of the financing for the programme of JINR engineering infrastructure developement in Budget, M$Off-budget, M$TOTAL, M$ Electric power Heat and water supply Telephony0.5- Radiation and nuclear safety0.5- Industrial safety and labour protection 2.0- Fire safety2.0- TOTAL, M$

G.Shirkov, JINR Scientific Council, PROGRAMME OF DEVELOPMENT OF THE JINR ENGINEERING INFRASTRUCTURE 7-Year Plan ( ) (First approach) The development of the engineering infrastructure is the basis, which has to provide effective realization of the research programme to achieve significant scientific results.