F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting October 20, 2014.

Slides:



Advertisements
Similar presentations
Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
Advertisements

Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
3/1/05 Status of the SHBD for the NUMI OPERA exposure D. Autiero IPN Lyon  Reminder about the proposed setup for the SHBD  Status of the sub-detectors.
JINR plan for FCAL R&D JINR DLNP group status report and plans (Z. Krumstein, G. Shelkov)
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
The sPHENIX Barrel Upgrade: Jet Physics and Beyond John Haggerty Brookhaven National Laboratory on behalf of the PHENIX collaboration Quark Matter 2012.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Status and Future of Fermilab Test Beam Facility Erik Ramberg LCWS07 Performance of New Beamline Tracking, Cerenkov and TOF CALICE and MINERVA tests Potential.
Recent Activity at the Upgraded Test Beam Facility Erik Ramberg AEM 16 April, 2007 Open House and ILC Workshop New Test Beamline Layout and Performance.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.
F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 26, 2015.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
WG7: 2014 RD51 Test Beam Brief introduction to the RD51 semi-permanent test beam area H4 (mostly for our Indians colleagues) News & Reminder ( mostly for.
Preshower/Crack Upgrade Update Detector overview 2.W electron data 3.Simulation overview 4.Early tests of new simulation.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Fermilab Test Beam Facility Aria Meyhoefer (soon to be Soha) May 10, 2010.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
Asian Test Beam Facilities Satoru Uozumi Kyungpook National University Mar-29 th 2010 Beijing China IHEP Beijing TBF Russia.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
CMS Pixel upgrade test-beam summary (T992) Lorenzo Uplegger, Ryan Rivera for the CMS pixel upgrade collaboration 1.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 27, 2014.
Fermilab Test Beam Facility Aria Soha September 19, 2011.
M. Garcia-Sciveres July 2002 ATLAS A Proton Collider Detector M. Garcia-Sciveres Lawrence Berkeley National Laboratory.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
F Fermilab Vertex Effort From a Fermilab Detector R&D Perspective Marcel Demarteau For the Fermilab ILC Detector & Physics R&D Group ALCPG Vertex Detector.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Fermilab Test Beam Facilities David Christian Fermilab Science and Technology Review November 5, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Technology and R&D Summary and next steps Burkhard Schmidt.
Shutdown Update Switchyard - Neutrino Muon MTest - MCenter Michael Geelhoed 2/22/13.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Test beam results of MCz-Si detectors
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
ScECAL+AHCAL+TCMT Combined Beam FNAL
The Status of Fermilab’s Test Beam Facility
Presentation transcript:

F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting October 20, 2014

2014 Facility Upgrades MCenter Beamline! Area for High Rate Trackers (M03) New Instrumentation – Wire chamber tracking system – Si strip telescope Improved Infrastructure – Temperature control – Table control / new tables

2014 Statistics 18 Experiments 321 Collaborators 84 Institutions 20 Countries 9 New TSW’s

Beam Delivery 416,139 Total Fxd Trgt events 183,225 MTest beam pulses 16,496 MCntr beam pulses MTest Beam Sum: 7.9E15 MCntr Beam Sum: 2.4E16

Weekly Usage MTest – 48 available beam-weeks – 78 experiment-weeks – 6 weeks of beam studies/ commissioning – 177% Usage MCenter – 5 available beam-weeks – 0.5 experiment-weeks – 5 weeks of beam studies/ commissioning – 100% Usage

Experiments (18) 9 new TSW’s approved 11 new experiments started 7 returning experiments

Experiment Types T1015 DRO Calorimetry T1037 FLYSUB-Consortium T958 FP420 (CMS+ATLAS) Fast Timing Group T979 Fast Timing w/Cherenkov Counters T989 DAMIC T1058 Secondary Emission Calorimeter T1031 Atlas Tile Calorimeter Electronics T1036 CMS High Rate Pixel Detector T1041CMS Forward Calorimetry T1049 ATLAS large scale TGC T1056 ATLAS DBM Module Qualification T992 Radiation-hard Sensors for the SLHC T1042 Muon g-2 straw tracker T1018 Spacordion Tungsten Fiber Calorimeter T1044 sPHENIX T1048 PHENIX fast TOF T1054 sPHENIX Pre-Shower Calorimeter T994 JASMIN Two Large Neutrino experiments on schedule for FY15: MINERvA & LAriaT

Institutions (84)

Summary Facility is growing at an incredible rate, and is on track to continue 321 collaborators this year Will likely break 500 next year, with new beamline 1.4 FTE for facility management is not enough

ADDITIONAL SLIDES

Latest Experiments T Users T Users SY Water Proble m

So Far in FY Experiment Weeks 1 Installation week 6 weeks Facility beam studies

Current Status MTest T-1041 running now. (6 sub-experiments) Wednesday they will uninstall Thursday will be spent installing T-992, T-1058, T-1015, and T- 958 (until Sept Shutdown) MCenter LAriaT Commissioning Characterization of Tertiary Beam T- 979 will run parasitically with punch-through muons