P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R09710 - Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.

Slides:



Advertisements
Similar presentations
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
Advertisements

Matt Syska, Industrial & Systems Engineering Andreana Crance, Industrial & Systems Engineering.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees Faculty Guide: Professor Kaemmerlen 1R10002 Process Improvement.
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
P09233 Flight Parameter Measurements Michael Skube P09233
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees Faculty Guide: Professor Kaemmerlen.
INDUSTRIAL & SYSTEMS ENGINEERING
P09713 – FRESH BREAD AND ROLL SCALING ROOM Customer Needs and Product Specifications Senior Design I: Winter Cecilia Enestrom, Kate Gleason,
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Fresh Bread and Roll Scaling Room MSD II Final Presentation Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai May 15 th, 2009.
EDGE™ Project Status Update P09141 – Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
P09713 – FRESH BREAD AND ROLL SCALING ROOM Senior Design Winter
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Fresh Bread and Roll Scaling Room Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai March 20 th, 2009.
EDGE™ Project Overview P09503 – Electrophotographic Development and Transfer Station David Schwartz – ISE (Team Lead) Ruth Gay – ME Phillip Lopez – ME.
P09713 – FRESH BREAD AND ROLL SCALING ROOM Week 3 Presentation Senior Design I: Winter Cecilia Enestrom, Kate Gleason, Erik Webster, Grant Garbach,
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
1 Value Stream Mapping Sustainable Operations Professor Mellie Pullman.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Traditional Approaches to Facility Layout
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Industrial Engineering Roles In Industry
1PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV Dr. Forrest Shull, FCMD Kurt Woodham, L-3 Communications OSMA SAS 08 Infusion of Perspective-Based.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Wegmans: Flip-Label Project Team Members: Brandon Sbordone (ME), George Kilger (EE), Ben Bouffard (EE), Ian Baker (ME), Charlie Nicolosi (ME), Helen Jervey.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Electrical and Computer Engineering Senior Design John Peeples, Ph. D., P.E. Professor and Department Head.
Week 2 Seminar: Project Scope Management
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Copyright 2002 Prentice-Hall, Inc. 1.1 Modern Systems Analysis and Design Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 1 The Systems Development.
P10712 CHEESECAKE PROCESS IMPROVEMENT Andreana Crance, Kevin Rodas, Rob Santora, Jeremy Smith, Matt Syska.
Project Charters Module 3
Traditional Approaches to Facility Layout
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Copyright 2003 – Cedar Enterprise Solutions, Inc. All rights reserved. Business Process Redesign & Innovation University of Maryland, University College.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME), Chukwuma.
5S and Visual We consider 5S and Visual Controls to be the foundation of Lean Manufacturing systems. 5S and Visual Controls are workplace organizational.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Project Final Presentation Joe Featherall.
Industrial and Manufacturing Engineering JACLYN VANGILDER LAURA PAZ VINCENT ISOPI.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
INTRODUCTION. 1.1 Background of Study 1.2 Problem Statement; 1.3 Objectives 1.4 Scope 1.5 Significant/Important of study 1.6 Organization of the Report/Thesis.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees.
LEAN SIX SIGMA PROJECT TEMPLATE
Turbomachinery Flow Visualization P08453
Wegmans Projects Matt Syska, Industrial & Systems Engineering Andreana Crance, Industrial & Systems Engineering.
Project Integration Management
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Chapter 1 The Systems Development Environment
ISCOM 472 NERD Lessons in Excellence -- iscom472nerd.com.
Overview Food & Drink Manufacturing Qualification
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
P09713 – FRESH BREAD AND ROLL SCALING ROOM
P09712 Commercial Roll Line Shrink Reduction
P10457: D-R Process Improvement
Project Readiness Review P10029 – Air Muscle Artificial Limb
Presentation transcript:

P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason Cecilia Enestrom Erik Webster

Roadmap Description and Overview Mission Statement: The Modern Food Processing and Bakery Technology for Lean Production Systems project roadmap lays out a series of projects for the Wegmans bakery facility that will improve major aspects of the company's processes. Each project may be used as a tool to educate RIT students in Lean process improvement techniques and can be iterated many times in the future to provide additional benefits to both Wegmans and the RIT Senior Design Program.

Roadmap Business Goals and Deliverables Identify specific improvement projects within the facility Develop production metrics to evaluate improvements based on the needs and goals of each production line Implement improvement projects to reduce costs associated with wastes and inefficiencies within the facility Properly document all improvements and process changes as these projects are implemented Create process documentation where it is currently lacking

Project Stakeholders Primary Customers: Wegmans Facility and Employees Scott Young, Manufacturing Engineering Manager Chris Isaacson, Industrial Engineer Other Stakeholders: John Kaemmerlen, Faculty Advisor Mark Smith, RIT Senior Design

Project Improvement Process TRACKPhase IPhase IIPhase IIIPhase IV Process Improvement Identify Flow and Current State Waste Reduction Set-up Time and Changeover Reduction Improve Layout Design Safety Improved Documentation and Safety Analysis Implement 5S: Sort, Set in order, Shine, Standardize, Sustain Ergonomic Projects at High Risk Areas Ergonomic Projects at Low Risk Areas Material Handling Identify Material Handling Waste Standardize Material Handling Flow Improve and Implement Material Handling Procedures Metrics Track Current Metrics, Implement Current Metric Documentation Create a Tracking System for Metrics Visual Controls and Documentation for Metrics and System Status (Real-Time) Improve Metrics Equipment Analyze Current Equipment and Maintenance Procedure Create and Implement Documentation for Equipment Update Out-of-Date (bottleneck) Equipment

P09713 Bread and Roll Scaling Room Layout and Process Improvement LinePhase IPhase IIPhase IIIPhase IV Bread and Roll Scaling Room Document current process flow and work practices Identify areas of process and layout improvement Design and implement the new layout Design and implement the new process procedures

Bread and Roll Scaling Room Layout and Process Improvement Project Name Bread and Roll Scaling Room Layout and Process Improvement Project Number P09713 Roadmap R Modern Food Processing and Bakery Technology for Lean Production Systems Start Term End Term Faculty Guide Professor Kaemmerlen (Industrial and Systems Engineering Department) Primary Customer Wegmans Facility and Employees Scott Young Chris Isaacson

Bread and Roll Scaling Room Layout and Process Improvement Current State All scaling and measuring of ingredients for the bread and roll line is performed in the scaling room Currently the ingredients are stored in 50-lb bags which are removed from storage racks by hand, measured on the scale, and moved by cart to their respective areas Double handling of ingredients is occurring at the two scaling locations There is no process for sifting and screening the dry ingredients. This would help reduce debris mixed into the batter The layout is less than optimal, processes and work practices are not standardized, and ergonomics is a major concern

Current Scaling Room

Scale and Bucket

Final Scaling Area

New Scaling Area

Bread and Roll Scaling Room Layout and Process Improvement Mission Statement Document all work practices and processes for the bread and roll scaling operation to promote standardized work, develop a new process and layout for the scaling area that is conducive with Lean practices, and design solutions that will create a sifting and screening process that is ergonomically sound and promotes improved work flow.

Bread and Roll Scaling Room Layout and Process Improvement Key Business Goals/Project Deliverables Document all current processes and work practices Develop alternative processes for scaling the dry ingredients Reduce/eliminate redundancies and double handling in the process Develop a process for sifting and screening the dry ingredients Develop the layout for the new scaling area Identify other opportunities for improvement in the scaling area

Bread and Roll Scaling Room Layout and Process Improvement Assumptions and Constraints Resources for designing solutions and equipment are limited but available. Budget will be constrained based on decisions made by Wegmans Wegmans’ engineering resources are limited but available Space is limited in the area where the scaling process will be located and existing materials in the area will be relocated or eliminated The bread and roll line will be moving to a new location near the new scaling location in the future

Bread and Roll Scaling Room Layout and Process Improvement Preliminary Customer Needs Relocate and redesign the layout for the scaling area near the bread and roll line Improve the safety and ergonomics of the process Develop a process for sifting and screening dry ingredients Eliminate double handling of dry ingredients Document and standardize process procedures Identify and implement Lean process improvements

Preliminary Risk Assessment Cost/Budget Insufficient funds to design and implement solutions for sifting and screening Customer Approval Wegmans does not approve of the solutions developed by the project team Space Restrictions The area reserved for the new scaling area will not support the process that is developed by the project team Bread and Roll Scaling Room Layout and Process Improvement

Bread and Roll Scaling Room Layout and Process Improvement Staffing Requirements NameDisciplineRole John Kaemmerlen Faculty Guide Faculty Guide, will work closely with the team on an on- going basis to facilitate success of project. Cecilia Enestrom IEWill serve as Co-Project Manager and focus on the design of the new layout. Kate GleasonIEWill serve as Co-Project Manager and concentrate on developing the new scaling processes. Erik WebsterIEWill serve as Co-Project Manager and concentrate on the design and ergonomics of the new sifting and screening process. TBDMEDevelop new equipment for sifting and screening process. TBDMEDevelop new equipment for new layout and scaling processes.

Bread and Roll Scaling Room Layout and Process Improvement Preliminary Work Breakdown Structure PersonWeek 0-1 TasksWeek 1-2 TasksWeek 2-3 Tasks Cecilia Enestrom – Co- Project Manager Meet to discuss specific team assignments. Review current layout and new area available in AutoCAD Take necessary measurements in current and new area Kate Gleason – Co-Project Manager Meet to discuss specific team assignments. Observe current processes and work flow Document current processes and work flow Erik Webster – Co-Project Manager Meet to discuss specific team assignments. Observe current procedures and qualitatively measure ergonomics Quantitatively measure the ergonomics of current procedures MERead through project located on EDGE website. Gain an understanding of the process Measure parameters that are related to design solutions MERead through project located on EDGE website. Gain an understanding of the process Measure parameters that are related to design solutions

Questions?