Presentation is loading. Please wait.

Presentation is loading. Please wait.

1PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153 Dr. Forrest Shull, FCMD Kurt Woodham, L-3 Communications OSMA SAS 08 Infusion of Perspective-Based.

Similar presentations


Presentation on theme: "1PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153 Dr. Forrest Shull, FCMD Kurt Woodham, L-3 Communications OSMA SAS 08 Infusion of Perspective-Based."— Presentation transcript:

1 1PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153 Dr. Forrest Shull, FCMD Kurt Woodham, L-3 Communications OSMA SAS 08 Infusion of Perspective-Based Inspections for NASA IV&V (Executive Briefing)

2 2PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153  A procedural technique incorporating three best practices:  Giving each reviewer a particular and unique focus (or perspective) on the document under review  Base perspectives on document stakeholders to help understand necessary participants, relate inspection tasks to development skills  Making individual review of a document an active (rather than passive) undertaking  Articulating the quality aspects of interest  Uses defect analysis (e.g. from bug trackers, configuration management systems, previous inspection, or test results) as one input on which to customize a solution Perspective-Based Inspection (PBI)

3 3PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153  History  2001-2003: SARP research funding  Refined basic approach, implemented on NASA projects and in classrooms, measured results  2004: Tech infusion with Flight Software Branch / GSFC  Goal: Produce new Branch standards  Success metric: Based on experiences on pilot(s), how much of the recommended process is adopted by Branch?  2004: Tech infusion with United Space Alliance / JSC  Goal: Reduce defect slippage over current increment  Success metric: Show reduced defect slippage on PB-inspected artifacts  2007-2009: SARP funding for improved general inspection planning  Other Results and Benefits  Improved defect detection effectiveness substantially (NASA & elsewhere)  Helped re-invigorate inspection practices  Forms the basis of industrial and academic training Perspective-Based Inspection (PBI)

4 4PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153  Tailoring required for new domain, new issues, new artifacts Adopting PBI for IV&V Requirements Specifications PB Inspection System reference model PB Inspection Requirements defectsModel defects

5 5PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153 Adopting PBI for IV&V: Tailoring Process  Understand team-specific quality concerns  Understand likely perspectives for the team  Refine set of perspectives and define procedures for each. E.g.,  What quality concerns map to which perspectives  What is a feasible/effective process for checking those concerns  Finalize procedures and provide training  Analyze ongoing inspection results (and update procedures if necessary)  Monitor downstream defect profile  Write final report Status: Reviewed sample models & processes; Constructed draft PBI techniques; Created draft training course

6 6PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153  Initial perspectives for this domain:  Modeler  Uses requirements & existing models to create the next iteration  Quality foci: Appropriate level of detail in requirements; completeness and clarity of requirements & models; consistency and correctness of models  Domain expert  Assesses whether model accurately and usefully captures domain  Quality foci: Correctness of requirements (independent of models); identification of stakeholders and evaluation of usability from their POV; checking flow of control & use of reusable components  Quality assurance  Assesses whether models and system can be validated properly  Quality foci: Handling of exception cases / unexpected system conditions; robustness of system; testability Adopting PBI for IV&V

7 7PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153  Validate & refine PBI instantiation via interviews  Check perspectives and associated scenarios with key stakeholders  Flesh out detailed approaches for each perspective with respect to each defect category  Application  In context of IV&V of JWST  Training course material delivered and training will be executed near- term  Technology provider will facilitate initial inspections, and will be on- call during subsequent inspections  Evaluation  Success metric: Effectiveness of PB inspection in comparison to past inspections Path Forward

8 8PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153 Forrest Shull fshull@fc-md.umd.edu 301-403-8970 Contact information Kurt Woodham Kurt.Woodham@L-3com.com 757-644-5807


Download ppt "1PBI_SAS_08_Exec_ShullSeptember 2008MAC-T IVV-08-153 Dr. Forrest Shull, FCMD Kurt Woodham, L-3 Communications OSMA SAS 08 Infusion of Perspective-Based."

Similar presentations


Ads by Google