IT Department 29 October 2012 LHC Resources Review Board2 LHC Resources Review Boards Frédéric Hemmer IT Department Head.

Slides:



Advertisements
Similar presentations
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Advertisements

CERN IT Department CH-1211 Genève 23 Switzerland t The Wigner Data Centre An Extension to the CERN Data Centre.
Computer Room Provision in Atlas and R89 Graham Robinson.
Parallel session for topics: EE-05 Deep renovation of buildings EE-06 Demand response in blocks of buildings EE-02 Design of new high performance buildings.
GPA Renewable Energy Resource for Guam Power Authority
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Columbia University’s Advanced Concepts Data Center Pilot June 17, 2011.
The CDCE BNL HEPIX – LBL October 28, 2009 Tony Chan - BNL.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Copyright Green Revolution Cooling
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
CERN IT Department CH-1211 Genève 23 Switzerland t Options for Expanding CERN’s Computing Capacity Without A New Building Medium term plans.
Federal Data Center Consolidation Initiative Karen Petraska August 17, 2011.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
1 May 12, 2010 Federal Data Center Consolidation Initiative.
October 23rd, 2009 Visit of CMS Computing Management at CC-IN2P3.
Project Management. Managing Capital Projects  What is a Project?  Something that: has a beginning and an end, and is carried out to meet established.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Remote Hosting First Experiences Wayne Salter (with input.
CERN IT Department CH-1211 Genève 23 Switzerland t The new (remote) Tier 0 What is it, and how will it be used? The new (remote) Tier 0 What.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation Prepared for: District of Squamish and Project Sponsors Prepared by: Compass Resource.
Industrial Engineering Roles In Industry
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Lyndonville Electric Department Feasibility Analysis Review December 2,
New Data Center at BNL– Status Update HEPIX – CERN May 6, 2008 Tony Chan - BNL.
By Nanette Chapa.  To realize the benefits of technology, schools must develop a plan for integrating technology into the curriculum. An effective technology.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter / Vincent Doré.
Computer Centre Upgrade Status & Plans Post-C5, June 27 th 2003 CERN.ch.
Anglophone West School District Education Council Sustainability Study – Bath Elementary and Middle Schools Executive Summary April 23, 2015.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
BNL Tier 1 Service Planning & Monitoring Bruce G. Gibbard GDB 5-6 August 2006.
Welcome Georgia Infrastructure Transformation 2010 Kick-off Meeting January 30, 2008.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
East Area Consolidation Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters 04 June 2015.
Dr. Andreas Wagner Deputy Group Leader - Operating Systems and Infrastructure Services CERN IT Department The IT Department & The LHC Computing Grid –
Key Customer ChallengesCustomer Pain Points How You can Help the CustomerProductsSolutionsServices Increasing Density Difficult to maintain 300 cfm per.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
CERN - IT Department CH-1211 Genève 23 Switzerland t IT Dept Presentation [September 2009] - 1 User Support - Future Changes in Policy and.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter HEPiX May 2011.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
1 Question & Answer for EoI Event Agenda 1> Introduction to Elite Telecom Public Co., Ltd. 2> General Description of Core Network Implementation & FTTH.
The Worldwide LHC Computing Grid Frédéric Hemmer IT Department Head Visit of INTEL ISEF CERN Special Award Winners 2012 Thursday, 21 st June 2012.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
CERN - IT Department CH-1211 Genève 23 Switzerland t Power and Cooling Challenges at CERN IHEPCCC Meeting April 24 th 2007 Tony Cass.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Remote Hosting Project
Next Step & Time plan Marcello Losasso, CERN
Content of Tender Dossier - Instructions to Tenderers - Tenders
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation
CERN Data Centre ‘Building 513 on the Meyrin Site’
Purchasing supplies at CERN
Affordable Energy Production from Renewable Fuel
Remote Hosting Project
East Hall under construction
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Progress on the Renewable Energy IPP Procurement Programme
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Presentation transcript:

IT Department 29 October 2012 LHC Resources Review Board2 LHC Resources Review Boards Frédéric Hemmer IT Department Head

IT Department Background 29 October 2012 LHC Resources Review Board3 The CERN Data Center (B 513) dates back to the 70’s Upgraded in to accommodate for up 2.5 MW of IT loads in preparation for LHC Computing Increased to 2.9 MW in 2008 at the price of reduced redundancy Still optimizing the current facility (cooling automation, temperatures, infrastructure) It became clear as of 2006 that this power envelope would not be enough by Various options were considered and studied: On site new building Remote location (hosting) Capacity renting (“cloud”) It also became clear that the protected power envelope for critical IT services was insufficient Decision in 2009 to consolidate critical IT services in one single room – “the barn” (450 KW) Bringing the maximum power available to 3.5 MW by 2013

IT Department Capacity Planning 29 October 2012 LHC Resources Review Board4

IT Department Background (II) 29 October 2012 LHC Resources Review Board5 Outline design studies of a new facility in Prévessin performed in 2008 Significant capital investments needed Not necessarily compatible with GS & EL departments workloads Carrying unknown costs, risks and timelines Norwegian proposal to host CERN computing in Norway Followed by other CERN member states consortia proposals Led CERN to launch a Call for Interest in Asking what could be provided (MW) for 4 MCHF/year - 17 positive answers – very large differences (1-3+ MW) Decision to launch a formal Call for Tender to host CERN equipment in Concluded in March 2012 and adjudicated to the Wigner RCP in Budapest

IT Department Call for tender scope Provision of floor space, racks, cabling, PDUs, power, cooling and support services (described in a draft SLA) - The SLA specifies the services expected (unpacking/installation/retirement, repairs, small interventions) and their volumes - “Smart hands” required during working hours - CERN continues to procure, operate and manage the servers - Bidders given a lot of liberty for the implementation (e.g. type of cooling not specified) Wide area networking to the most convenient Géant PoP - Géant is the European Research and Education Network co-funded by the European Commission Gbps (10x10 Gbps, 3*40 Gbps or 1 x 100Gbps) on two independent path Installation profile for an initial 600 KW in 2013, 300 KW each subsequent year - Includes Physics & Business Continuity servers - Includes servers retirements profile Thermal constraints compatible with the ASHRAE 2011 guidelines for Data Centers 29 October 2012 LHC Resources Review Board6

IT Department Outcome of the tender Adjudication on the lowest bidder - Essentially a supply contract - Dominant costs are the hosting & electricity fees - Contract duration length Years 4-7 linearly extrapolated - Allowing for energy price to be revised Adjudication on the first 3 years - Nearly impossible for most of the bidders to quote electricity pricing for a duration longer than 3 years) As anticipated by the initial Call for Interest, wide difference in the offers: - Hosting fee: 24-56% of Total - Electricity fee: 13-49% of Total - PUE: Service fee: 1-31% of Total - Network fee: 1-60% of Total - Overall: factor of 3 between the cheapest and the more expensive offers 29 October 2012 LHC Resources Review Board7

IT Department Evaluation Methodology Top 5 bidders invited beginning 2012 at CERN to present and explain their offers - All bids examined carefully - All are very different Additional visit to the top bidder on Proposed site visit - Meeting with the engineering team - Support from - Hungarian Academy of science - Local District authorities - Minister of National Development - Detailed planning and design documents and team structured examined - No reason to believe SLA targets cannot be met 29 October 2012 LHC Resources Review Board8

IT Department 29 October 2012 LHC Resources Review Board9 WIGNER Data Center After full refurbishment, hosting CERN Tier-0 From 1 january 2013

IT Department Data Center Layout & ramp-up 29 October 2012 LHC Resources Review Board10

IT Department Status (September 2012) Contract Adjudicated to the Wigner Research Center for Physics in Budapest Two 100 Gbps circuits adjudicated to two different providers - At reasonable & comparable costs Works progressing well people working at any point in time - Peaking at in October 2012 Some teething problems - Wigner had assumed they could preinstall the networking - Customs/Taxes issues still not sorted out Moving all CERN tools to Openstack - Intention to virtualize everything 29 October 2012 LHC Resources Review Board11 June 2012 October 2012

IT Department Connectivity (100 Gbps) 29 October 2012 LHC Resources Review Board12

IT Department Free Cooling 29 October 2012 LHC Resources Review Board13

IT Department Risk Mitigation & Next steps Gradual ramp-up of the installed capacity - Will detect quickly SLA non-conformance - Penalties are specified in the SLA - Installation delays, temperature maxima, power availability, intervention times, repair times - Bank guarantee corresponding to 10% of the first 3 years Two independent 100 Gbps circuits between CERN and the Wigner RCP - From two independent providers Install minimal equipment as soon as possible - To perform at least functional tests - To refine the procedures Deploy & operate equipment as of Refine the SLA 29 October 2012 LHC Resources Review Board14

IT Department Summary - scaling CERN Data Center(s) to anticipated Physics needs 29 October 2012 LHC Resources Review Board15 CERN Data Center dates back to the 70’s Upgraded in 2005 to support LHC (2.9 MW) Still optimizing the current facility (cooling automation, temperatures, infrastructure) Exploitation of 100 KW of remote facility down town Understanding costs, remote dynamic management, ensure business continuity Exploitation of a remote Data center in Hungary Max. 2.7 MW (N+1 redundancy) - Business continuity 100 Gbps connections Renovation of the “barn” for accommodating 450 KW of “critical” IT loads (increasing 513 total to 3.5 MW)