Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Remote Hosting First Experiences Wayne Salter (with input.

Similar presentations


Presentation on theme: "Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Remote Hosting First Experiences Wayne Salter (with input."— Presentation transcript:

1 Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN Remote Hosting First Experiences Wayne Salter (with input from many colleagues) HEPiX Autumn Meeting in Lincoln

2 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 2 Overview Brief History Installation Status Experience –General –Commercial –Procurement –Operations –Networking –End User Utilisation Lessons Learnt Conclusions

3 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 3 Brief History Call for interest launched in June 2010 Responses received in November 2010 followed up by many visits/meetings Decision to proceed taken in spring 2011 Tender sent out in September 2011 for adjudication in March 2012 Contract placed with the Wigner Research Centre for Physics in May 2012 and construction started First room ready and equipment delivery started in January 2013 Continual build up in capacity since Official inauguration in June 2013 Building works finished in September 2013

4 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 4 Brief History ( timeline not to scale ) Many visits/ meetings Continual build up in capacity Call for interest launched June 2010 Responses received Nov 2010 Decision to proceed taken Spring 2011 Tender sent out Sep 2011 FC adjudication March 2012 Contract placed with The Wigner Research Centre for Physics May 2012 First room ready and equipment delivery started January 2013 Official inauguration June 2013 Building works finished Sep 2013

5 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 5 Brief History in pictures

6 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 6 Installation Status Two rooms are in operation for CERN with 122 racks used 1276 CPU servers – 319 2U quads (25216 cores, 85504 GB RAM, 5904 TB disk) 568 external storage units – 4U JBODs each with 24 disks (52608 TB in total - 1920 TB on 3TB drives and 11712 on 4TB drives) Network equipment; 7 high end routers, 43 10GbE and 47 1GbE switches, 1 management router and 107 management switches Additional large deliveries expected in December –More than doubling CPU capacity and adding 40% more disk storage capacity and requiring use of third room –Investigating possibility of having a 3 rd 100Gbps link

7 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 7 Experience - General On the whole good – generally works well –Remote operation and monitoring works well –No out of hours support for CERN equipment Teams visiting each other was very useful –Help given with initial setups Over reliance on one person Reporting –Regular bi-weekly operational telecom –Monthly reports (since 2014) Operations and Billing Can be time consuming dealing with new requirements, e.g. Russian Tier 1 link

8 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 8 Experience - Commercial Tendering process –Specification as open as possible –Adjudication based on a defined ramp up profile, failure rate estimates, and included networking from closest GEANT PoP VAT Exemption –Took many months to sort out and required help from Wigner Insurance split –Discussions still on-going!! Billing –First bill only in 2014 after more than one year of running –Detailed spreadsheet as part of monthly operations report

9 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 9 Experience - Procurement Detailed instructions to ease reception and installation –However, following deliveries is more complex Delivery directly to Wigner except for network switches –One case of damaged equipment during transport Need to provide detailed information in advance on deliveries as well as transport Issues with unloading of equipment at Wigner Effectively doubled the number of orders to be processed

10 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 10 Experience – Operations/I Late availability of room for storage and repairs Auto-registration and stress testing of machines works well Room/rack layout responsibilities ‘unclear’ Various infrastructure issues –Two HV incidents but protected by UPS/diesel –Cooling pressure issue causing all chillers to be switched off –Leak in cooling pipe –Complex new facility not completely understood. Review conducted by TÜV –Often slow to get detailed reports

11 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 11 Experience – Operations/II More difficult than expected to establish good workflows Formal procedures and approach being gradually introduced as experience is gained Difficult to use full available power –Tender estimate of power density does not reflect the reality Difficult to verify power consumption figures Non-standard setups and debugging of tricky issues are more complicated

12 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 12 Experience – Operations/III Role of the SysAdmins has not been affected Repair Service –Runs well –Good quality interventions –Good response time to SNOW tickets –Information flow is more complicated with more parties involved – has not been ideal –Data requested not always provided in a timely manner Still very limited usage of Wigner for business continuity –Lack of second network hub –Priority on moving to new critical room at CERN –Difficulties in getting allocation of resources for BC

13 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 13 Experience - Networking

14 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 14 Experience - Networking Long discussions on initial network setup in the rooms Takes longer to solve simple problems/lot of mail exchange/no out-of-hours support –Required changes to operational approach –Now giving Wigner access to SPECTRUM monitoring Less time for deployment of new equipment ( for CERN ) Availability of 100Gbps links not as expected –Long running problems with one of the links (took many months to debug) –Over past 100 days; link 1 (99.7%), link 2 (99.96%) Broken equipment takes longer to be replaced by manufacturer –Try to minimize the number of shipments –Shipments must come via CERN

15 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF HEPiX Autumn Meeting 2014 @ Lincoln - 15 Experience - End User Utilisation Complaints of performance of jobs at Wigner However –Mixture of SLC5/6, Intel/AMD, VM/Bare metal –Different type of jobs –Locality of data –Optimisation of S/W for Intel whilst most CPU server in Wigner were AMD –Configuration options, e.g. XROOT TTreeCache When comparing like with like only a minimal drop in efficiency –However, EOS servers deployed to Wigner –Will soon deploy CVMFS service at Wigner Investigations are still on-going

16 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Lessons Learnt New facility and hence some teething problems as well as one design issue Lack of experience on both sides –but due to collaborative and flexible approach issues have generally been resolved quickly Personal contact is VERY important –Help with first installations –Teams meeting each other –Regular telecoms Good communication is important Good documentation helps a LOT –Still need to improve SLA and other formal arrangements Things always take longer than foreseen HEPiX Autumn Meeting 2014 @ Lincoln - 16

17 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Conclusions In general everything is running smoothly Issues have arisen –But in general have been resolved quickly due to flexibility and good relations on both sides –VAT and insurances have taken longer due to external parties 100Gbps links have not been as stable as expected Some questions raised regarding job efficiency Full power capacity usage will not be possible due to lower power density than expected With experience it should be possible to produce more detailed formal documents next time (….) Still waiting to implement more extensive BC Contract due to run until end of 2019 HEPiX Autumn Meeting 2014 @ Lincoln - 17

18 CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF Thank you for your attention! Questions? HEPiX Autumn Meeting 2014 @ Lincoln - 18