December 5, 2011 Presented by: Sue DAgnese Region 1 Traffic Manager Overview of: ROAD SAFETY AUDIT (RSA) PROCESS & APPLICATIONS TV Highway at 185th Ave.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
October 28 th, Hwy 97 – Carson to Fox Mountain Road Four Lanning  Review Project Scope Problem Definition Objectives  Summary of Work Completed.
 Corridor Plan and Meeting Objective  Project Background  Short Term Improvements  Long Term Improvements/Corridor Planning  Construction Funding.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
 Provide a safe crossing and maintain mobility › The bridge is identified as structurally deficient.  Meet regional traffic demands and improve mobility.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Lec 33, Ch.5, pp : Accident reduction capabilities and effectiveness of safety design features (Objectives) Learn what’s involved in safety engineering.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
U.S. 33 Northern Connector Alternative
December 13, 2010 Developing Bicycle Performance Measures for Integrated Multi-Modal Corridor Management.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
I-69 Strategic Planning Corridor Study: Fulton To Eddyville, KY Fulton, Hickman, Graves, Marshall, Livingston, Lyon Counties Public Meeting November 15,
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Transportation Border Working Group Montreal October 22 and 23, 2013 CBSA Project Update.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
River Road West Penrose Street Bridge Street Road Safety Scheme May 2014.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
World Bank Transport Team April 16,  Background  World Bank assistance program  Opportunities and way forward 2.
Tender Packages (Consistency with Current Design Bulletins) Basic Knowledge for Roadway and Bridge Projects Seminar for CEA Members Edmonton February 12,
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Limebank Road Environmental Assessment Study February 19, 2003.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Ingrid Brakop Coordinator Material Damage Loss Prevention.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
BROKENHEAD OJIBWAY NATION COMMUNITY MEETING June 23, :00 PM – 7:00 PM Information on the PTH 59N and PTH 101 Interchange.
GREENWAYS Connecting Communities November Greenways Plan 350 km planned Over 80 km built Construction of 4-5 km / year.
Road Infrastructure and Road Safety George Mavroyeni – Executive Director, Major Projects (former Executive Director, Road Safety and Network Access) May.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
March 20, 2011 Presented by: Sue D’Agnese, Region 1 Traffic Manager Overview of: ROAD SAFETY AUDIT (RSA) PROCESS & APPLICATIONS OR210 Scholls Ferry Rd:
Right-of-Way Who Goes First?.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
STA Safety Project PID #76439 December 12, 2006.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
MED SR 18 Corridor Project MED PID October 13, 2015.
National Park Service U.S. Department of the Interior Gulf Islands National Seashore Perdido Key / Johnson Beach Environmental Assessment WELCOME TO GULF.
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
The Central Avenue Connector Trail
The I-465 West Leg Reconstruction Project
Project Management Team Meeting #3
Cycling infrastructure spending 2017
Pedestrian & Bicyclist Crash Analysis
Highway 169 Bridge Replacement & Pavement Resurfacing
SR 400 Express Lanes: Market Sounding
Geometric Design: General Concept CE331 Transportation Engineering.
S.R. 26 Road Rehabilitation in Clinton County
Road Safety in Azerbaijan: Challenges and Way Forward
Manilla Low Level Crossing Project
Buckner Road Interchange at I-65 Public Meeting
Presentation transcript:

The Ministry of Transportation and Infrastructure welcomes you to an Open House for: Trans Canada Highway No.1 Improvements in Salmon Arm Your comments are appreciated Welcome

OPEN HOUSE OBJECTIVES: Present plans Provide information and answer questions Get feedback Project Background: 2001 Cache Creek to the Rockies Corridor Planning Study 2012 UBCM commitment to spend 650m along the TCH City of Salmon Arm identified need for improvements along the corridor Initial TCH corridor public engagement in BC on the Move public engagement

Average 17,500 vehicles per day (vpd) Traffic Volumes 2013

Collision History I.R #3 to 1 st Ave SW 42 Collisions (between 2004 and 2013) 2 fatalities 23 Injured 17 Property Damage Only Collisions Contributing Factors: Wildlife Poor weather conditions Drugs\Alcohol related Inattention or Driving Without Due Care Driver Inexperience

Collision History 1 st Ave SW to 30 th St SW 54 Collisions (between 2004 and 2013) 1 fatality 27 Injured 26 Property Damage Only Collisions Contributing Factors: Inattention or Driving Without Due Care Poor weather conditions Driver Inexperience

Collision History 30 th St SW to 10 th St SW 59 Collisions (between 2004 and 2013) 0 fatalities 30 Injured 29 Property Damage Only Collisions Contributing Factors: Inattention or Driving Without Due Care Poor weather conditions Driver Inexperience

Project Schedule 1st Ave SW to 30 th St SW Construction to commence th St SW to 10st SW Construction schedule to be determined after design and property acquisition are completed I.R #3 to 1 st Ave SW Construction schedule to be determined after design and property acquisition are complete

How Did We Arrive At This Concept? Stakeholder input Safety Improvements Improve mobility along the corridor Archeological and Environmental impacts Property and Agriculture Impacts Alignment Constructability Traffic Management Capital Costs

Upgrade 2.35 km to a four lane cross section Acceleration and deceleration lanes where needed Improvements to left turn lane 2.1 metre wide raised centre median 1.5 metre wide paved shoulders 3.6 metre wide lanes Install roadside barrier as required Detail Design Specifics for 30 th St SW to 10 th St SW

Upgrade 1.5 km to a four lane cross section Re-alignment and replacement of the Salmon River Bridge 2.5 metre wide paved shoulders 3.7 metre wide lanes Provide improvements to the local Pedestrian \ Cyclist trail network Install median barrier & Rumble Strips Install roadside barrier where needed Preliminary Design Specifics for 1 st Ave SW to 30 th St SW & I.R. #3 to 1 st Ave SW

Benefits Improved safety and mobility Increase to four lanes with median barrier New bridge over Salmon River Wider shoulders increases safety for motorist and cyclists Improved pedestrian \cyclist trail network Improved access to and from the Trans-Canada Highway Improved alignment to provide better sight lines

NEXT STEPS Compile and review feedback from Open House Complete the design based on feedback from Open House Continue consultation with First Nations Continue consultation with the stakeholders and Property Owners Continue with property acquisition Obtain federal partnership funding to proceed with tender and construction

Thank You Please Provide your comments on forms provided