HPS Budget and Schedule Marco Oriunno, June 4-6, 2013 HPS Collaboration Meeting, JLAB.

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
1 Getting Ready for the Climb HPS Project Overview HPS Collaboration Meeting at SLAC John Jaros September 10, 2012 John Jaros HPS Collaboration Meeting.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
HPS Budget and Schedule Marco Oriunno, June 18, 2014.
1 draft NO A WBS J. Cooper NO A Working Group Meeting June 29,2005 Work is the effort of Ron, Dave, Bill, Suzanne, Harry, not just me.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
Finance Roy Preece STFC RAL Oversight Committee Meeting 27 th November 2015.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting September 11, 2008 Dean. Hoffer / Elaine McCluskey.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
MUSE NSF Review March 24, MUSE Project Management Ronald Ransome Rutgers The State University of New Jersey For the MUSE Collaboration.
CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Director’s Progress Review Closeout Meeting
HPS EC Report John Jaros HPS Collaboration Meeting at JLAB May 5, 2017.
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
Resource Loaded Schedule and Budget Profile
Jefferson Lab Overview
Engineering Design - A general approach.
Status of the MICE Construction Project
Project Management W. J. Foyt
S4 will be a “big” Collaboration:
Preparations for a Lehman Review
CMS Goal of the experiment
Director’s Progress Review Closeout Meeting
JEFFERSON LAB LCLSII CRYOPLANT INSTALLATION PACKAGE DIRECTOR’S PROGRESS REVIEW Welcome and Introduction Stuart Henderson June 1, 2017.
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
TSF Upgrade Project Overview Resources Plans and Timetable
Details supporting the increase
Project Management Issues John N. Galayda, SLAC April 24, 2002
Preliminary Project Execution Plan
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

HPS Budget and Schedule Marco Oriunno, June 4-6, 2013 HPS Collaboration Meeting, JLAB

2 OUTLINE 1.Project Management Plan (described in the Proposal) Schedule Costs Manpower 2.SLAC Review Jan’13 (Recommendations) 3.DOE review in July (Preparation)

3 HPS Project Implementation Plan Scope - Construction, Installation and Commissioning of the HPS experiment at JLAB - Hall B Organization chart - Parties involved and Responsibilities sharing within the project Schedule - Project timeline with milestones toward completion Budget – Labor and Material required to delivery the scope

HPS Project Org Chart 4 DOE HEP JLABSLAC Heavy Photon Search Project Manager M. Oriunno Project Scientists J. Jaros S. Stepanyan HPS Executive Committee Beamline SVT ECal SVT DAQ Trigger/DAQ Muon Slow Controls Software Analysis HPS working GroupsChair (Deputy) BeamlineK. Moffeit (FX Girod) SVTT.Neslon (V.Fedayev) ECALR. Dupre (S.Stepanyan) MuonK.Griffioen (Y.Gershtein) DAQS. Boiarinov (P.Hansson) TriggerV. Kubarovsky (T.Maruyama) Slow ControlH. Egiyan (N. Gevorgyan) SoftwareM.Haltrop (S.Uemura, O.Moreno) Analysis M. Graham (S.Phillips) Project Management M. Oriunno (S.Stepanyan, J.Jaros) Project Team Orsay INFN Ge Project Construction Team

5 Matrix of Deliverables SLACJLABORSAYINFNUCSCW&M Beamline ●● SVT ●● SVT DAQ ●● ECAL ●●● TDAQ ●● Slow Control ● Installation & Commissioning ●●●●● Project management ●● MUON ● Through JLAB Through SLAC

Work Breakdown Structure (WBS) WBSNAME 1.1 Beamline 1.2 SVT 1.3 SVT DAQ 1.4 ECAL 1.5 TDAQ 1.6 Slow Control 1.7 Installation & Commissioning 1.8 Electron running 1.9 SLAC Travel and Meetings 1.10 SLAC Travel for Data Run 1.11 Project management 1.12 UCSC HPS working GroupsChair (Deputy) BeamlineK. Moffeit (FX Girod) SVTT.Neslon (V.Fedayev) ECALR. Dupre (S.Stepanyan) DAQS. Boiarinov (P.Hansson) TriggerV. Kubarovsky (T.Maruyama) Slow ControlH. Egiyan (N. Gevorgyan) SoftwareM.Haltrop (S.Uemura, O.Moreno) Analysis M. Graham (S.Phillips) Project Management M. Oriunno (S.Stepanyan, J.Jaros) WBS = Parts (PBS) + Work activities Material Labor

7 HPS Project Execution Plan Scope ManagementScope ManagementWork Breakdown Structure Requirements ManagementRequirements ManagementScientific Requirements Flow Down Schedule ManagementSchedule ManagementTracking of Schedule and Milestones Financial ManagementFinancial ManagementTracking Cost book and Expenditure Quality ManagementQuality ManagementConsistency with Requirements (Reviews) Resource ManagementManpower Leveling Resource Management Risk ManagementRisk ManagementRisk Assessment and Mitigation Procurement ManagementProcurement ManagementPurchase of Items > $15k Monthly meeting PM (Chair)+ PIs + Construction Team

8 Schedule Drivers HPS Construction Data Runs Analysis Today Oct.’14 May.’15 Sep.’16 Early Physics Window Opportunity at CEBAF in October ‘14 FY13 FY15 FY16 FY14 Construction + Testing # 19 months Operations # 6 months Analysis

9 Schedule - Beamline Milestones & Reviews Beamline Design review Dec.’13 Installation review Aug.’14 Beamline Installed Sep.’14 Work at JLAB starts ~ April 2014 Design Construction Dec.’13 Mar.’13 Sep.’14

10 Schedule – SVT Mechanics Milestones&Reviews SVT returns from JlabFeb.’13 SVT Engineering Design ReviewJul.’13 Layer 1-3 ReadyMar.’14 Layer 4-6 ReadyApr.’14 SVT Ready for ShipmentJun.’14 SVT Ready For Installation Aug.’14 Construction Testing Apr.’14 Mar.’13 Aug.’14

11 Schedule – SVT DAQ Milestones&Reviews FE board tested w/ hybrid28-Aug-13 Flange DAQ tested10-Jan-14 DAQ full system Test2-Jun-14 Single hybrid qualication28-Aug-13 Construction Testing Apr.’14 Mar.’13 Aug.’14

12 Schedule – ECAL+ TDAQ + Slow Control Milestones & Reviews TDAQ ready Dec.6, 2013 ECAL Ready for installationAug.1, 2014

13 Schedule – Installation, Commissioning and Data Runs Installation in Hall-B happens at the end of August~ 2 weeks Beamline Commissioning ~1 week Detector Commissioning ~ 1 week Test Run Installation was 1.5 day (16 hours no stop!) with 1 week preparation in the clean room. The same crews will do the installation in 2014.

14 Schedule – Milestones toward the Data Runs

15 Costs – Tools and Methodology 1.Schedule and Costs are simultaneously managed with MS Project 2.Tasks are tracked down to WBS Level 3 Min. 3.Labor is added in hours by skills. M&S as number of required units 4.Only Engineering Labor + Overhead 53% (Material 7.65%) 5.Contingency : 10%Catalogue Items 20-25%Similar to previous design 30-50%New design

16 HPS Total Costs = $ 2,971,783 LaborMaterialTotal SLAC $ 1,399,641 $ 1,073,558 $ 2,473,200 JLAB $ 361,503 $ 137,080 $ 498,583 HPS Total $ 1,761,144 $ 1,210,638 $ 2,971,783

Capital Equipment (CE) Labor and Material costs of the parts constituting the experimental apparatus, which is required to perform the physics. They do not include spares and prototyping Infrastructures (INFRA) Labor and Materials cost for general purpose infrastructures required by the apparatus, which can be reused for other experiments, e.g, Chiller, Power Supplies, PLC Operation (OP) Labor and Material Costs incurred for the commissioning and the operation of the experimental set up, as well as Spare Parts, Prototype and R&D activities. Costs Breakdown : Capital Equipments vs. Operations Task NameLaborMaterialTotalSparesProto.OperationsInfra Capital Equipments HPS $ 1,761 $ 1,211 $ 2,972 $ 78 $ 21 $ 928 $ 248 $ 1,796 Beamline $ 91 $ 131 $ 223 $ - $ 6 $ 217 SVT $ 452 $ 204 $ 656 $ 8 $ 10 $ 75 $ 43 $ 539 SVT DAQ $ 431 $ 352 $ 782 $ 70 $ 11 $ 80 $ 162 $ 540 ECAL $ 36 $ 12 $ 48 $ - $ 48 TDAQ $ 151 $ 10 $ 161 $ - $ 10 $ 151 Slow Control $ 94 $ 39 $ 134 $ - $ 28 $ 106 Installation & Commissioning $ 58 $ - $ 58 $ - $ 55 $ - $ 3 Electron Running $ - SLAC Travel Meetings $ 125 $ - $ 125 $ - $ 125 $ - SLAC Travel for Commissioning and Running $ 156 $ - $ 156 $ - $ 130 $ - $ 26 Project management $ 167 $ - $ 167 $ - $ 167 UCSC Funds $ - $ 463 $ - $ 463 $ - < $2M

Spending Profile Keep alive funds FY13 $414k FWP FY14-FY15-FY16 SVT Review

19 Manpower – FTE Labor Breakdown Labor profile SLAC Labor profile JLAB 1.The Tables summarize only the engineering labor accounted as expenditures 2.The do not include the labor provided by physicists or the engineering provided by Orsay and INFN-GE

20 SLAC Director’s Review Jan.11, 2013

21 DOE Review July 11, 2013: HPS Charge Letter 1.The quality and the impact of the research by the HPS collaboration in the recent past 2.The scientific significance, merit and feasibility of the proposal research; 3.The competence and future premise of the HPS collaboration for carrying out the proposed research; 4.The adequacy of the resources for carrying out the proposed research and cost-effectiveness of the research investment; 5.The quality of the support and the infrastructure provided by the participating laboratories. More in detail : Did the HPS collaboration successfully demonstrates the technical feasibility of its detector design in its 2012 test run at JLAB ? Has the HPS collaboration developed technical design and construction and commissioning plans for its components that are consistent with the readiness to begin taking data in FY15 in the low energy beam in Hall B at JLAB ? Has the HPS collaboration identified and costed for the appropriate manpower and the other resources consistent with readiness to take data in FY15 ? Has the HPS collaboration presented estimates of cost and schedule that are consistent with readiness to take data in FY15 Has the HPS collaboration developed a credible staging plan installation of detector components that will allow for data taking in FY15 ?