Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.

Slides:



Advertisements
Similar presentations
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Advertisements

Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Maryland Avenue and Westminster Street Jerry Auge, PE Project Manager Ramsey County Paul St. Martin Traffic Engineer City of St. Paul September 10, 2013.
City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012.
Equitas Academy Charter School Conditional Use Permit Review.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Traffic Signal Warrants
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
Access Management: Why And How? An Introduction To Access Management Problems, Principles and Treatments.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Intersections.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Trip Generation for Street and Highways Lecture 14 CE 4720 Norman Garrick.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Student(s) Drop Off and Pick Up Our goal is to make the school community safer.
Orem City Roundabout Feasibility Study Brigham Young University and the City of Orem Determination of available land Roundabout parameters established.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Tshwane Line 1 Traffic Simulation Results October 2012.
Community Development Department PINE LAKES PARKWAY NORTH ROADWAY IMPROVEMENTS.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Community Development Department Construction Phase BULLDOG DRIVE.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Roundabouts: A Safer Choice. What is a roundabout? A roundabout is a type of circular intersection with yield control of entering traffic, islands on.
Right-of-Way Who Goes First?.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Traffic Flow Parameters Surface Street Application.
Evaluation of Automated Camera Enforcement on Red Light Running Violations by Time into the Red Phase Nicole Oneyear and Shauna Hallmark.
Rantoul Street / 1A Reconstruction Project December 10, 2015.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
Unit 2: Signs, Signals, and Roadway Markings
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Slower vehicle speeds (under 30 mph) means less severe crashes 90% reduction in fatalities, 76% reduction in injury crashes 75% fewer vehicle conflict.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
(Continued from May 22, 2007) BCC PUBLIC HEARING ON BZA # SE , 4/5/07 APPLICANT: Knowledge Tree Learning Center June 26, 2007.
Fehr & Peers | March 13 th, 2012 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
At-Grade Intersection Design
Lesson 2.3 Today’s Objectives: Describe the difference between broken yellow lines and broken white lines. Explain the differences between a shared left-turn.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Signals, pavement markings, and proper turns QUIZ
TRAFFIC CONTROL ORDERS DOWNTOWN MIDLAND January 23, 2017
MD 30 (Hanover Pike) at Mt. Gilead Road
The I-465 West Leg Reconstruction Project
PEDESTRIAN + CROSSWALK = STOP!
ARTERIAL INTERCHANGE Four exit ramp, split level (SPUI)
Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m.
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Rules of the Road Chapter 10
Utility Relocation: 11th/Mill
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project

McCarty Street Before Project ADT 8700 (peak hour 15% AM and 15% PM) ADT 8700 (peak hour 15% AM and 15% PM) Corner mounted pedestal signals Corner mounted pedestal signals 10 ft. through lanes 10 ft. through lanes 8 ft. parking stalls on both sides of street 8 ft. parking stalls on both sides of street 8 ft. right turn lanes at intersections 8 ft. right turn lanes at intersections No left turn pockets at intersections No left turn pockets at intersections Several driveways directly onto McCarty Several driveways directly onto McCarty

Typical Corner Mounted Signal

Selling the McCarty Street Project to the Community Two separate traffic consultants provided LOS analysis for the three intersections Two separate traffic consultants provided LOS analysis for the three intersections City staff completed an accident study City staff completed an accident study Approval by the City’s Transportation & Traffic Commission and Public Works & Planning Committee Approval by the City’s Transportation & Traffic Commission and Public Works & Planning Committee

McCarty Street LOS Results  TranSystems Corporation (current traffic with 3 vs 5 lane, both LOS B)  George Butler Associates (future traffic utilizing county-wide traffic model, land use based, 3 lane section, LOS B)

McCarty Street Project Scope Provide new overhead mounted signals and improved lighting Provide new overhead mounted signals and improved lighting Re-stripe to reduce lane cross section and organize lane configurations at intersections Re-stripe to reduce lane cross section and organize lane configurations at intersections Maintain on street parking Maintain on street parking

McCarty Street Project Scope 14 ft. centered turn lane 14 ft. centered turn lane 12.5 ft. through lane 12.5 ft. through lane 9 ft. right turn lane 9 ft. right turn lane 2 ft. positive offset in left turn lane at signals 2 ft. positive offset in left turn lane at signals

Jefferson City’s McCarty Street Project Project Design Consultant: TranSystem Corp Project Design Consultant: TranSystem Corp Contractor, Meyer Electric Contractor, Meyer Electric 6 month project started in October 04 and finished in March 05 6 month project started in October 04 and finished in March 05 Striping work first followed by signal installation Striping work first followed by signal installation Project Construction Cost, $293,000 Project Construction Cost, $293,000 $266,000: 3 New Signals, Lighting and Controllers $266,000: 3 New Signals, Lighting and Controllers $27,000: remove markings and stripe 17 City Blocks $27,000: remove markings and stripe 17 City Blocks

Project Payoff 40 crashes per year prior to project (5 year average) 40 crashes per year prior to project (5 year average) 10 crashes first year after project (1 year, 2005) 10 crashes first year after project (1 year, 2005) 30 fewer crashes per year after project 30 fewer crashes per year after project 75% crash reduction 75% crash reduction

Any Questions ?