WORKSHOP ON EXPERIENCE SHARING AND LESSONS LEARNT DURING IMPLEMENTATION OF ESMF IN 2013-14 Presented By SADAT ALI ASSISTANT DIRECTOR WATER QUALITY WASA.

Slides:



Advertisements
Similar presentations
Recommendations of the Initial Environmental Assessment (IEE) According to the SIEE, the project is identified as a category of B under the ADB environmental.
Advertisements

ISO EMS OVERVIEW FOR CONTRACTORS
Lesson 3 Responding to Emergency Events. For additional information or questions please contact Toledo-Lucas County Health Department APC:
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
Second Phase Metropolis Towers Chromium Cleanup Presentation to Residents September 4, 2013.
Part III Solid Waste Engineering
EXPÉRIENCE SHARING AND LESSONS LEARNT REGARDING ENVIRONNEMENTAL & SOCIAL MANAGEMENT FRAMEWORK (ESMF) IMPLEMENTATION IN Mian M. Latif Akhter DDO.
Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
USAID Africa Bureau EIA Procedures for Sub-Projects
Healthcare Waste Management Programme
6/2/2015 What is Responsible Care ® ? A Canadian Chemical Producers’ Association initiative to continuously improve all aspects of the chemical industry’s,
ENVIRONMENTAL MANAGEMENT PLAN
Regulatory Body MODIFIED Day 8 – Lecture 3.
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Codex Guidelines for the Application of HACCP
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Investing in the logistics necessary for Africa's Oil and Gas Industry.
Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov.
Lessons Learnt and Experience Sharing 2 Presented By Rabia Mehfooz Assistant Director (Engineering) WASA Multan.
Heading TfL Sustainability Approach and Resource management Helen Woolston, TfL Sustainability Coordinator BASE London June 2013.
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
KENYA PORTS AUTHORITY HEALTH, SAFETY AND ENVIRONMENT
Environmental Impact Assessment (EIA): Overview
© 2004 West Legal Studies in Business, a Division of Thomson Learning 24.1 Chapter 24 Environmental Law.
Energy Issues in Peru and the Andes: Environmental and Social Aspects George Washington University January 28, 2005 Dr. Robert H. Montgomery Head, Environmental.
Community Preparedness & Disaster Planning. Why Disasters occur ?
Environmental Toolbox. 2 General Awareness Training Module For Soldiers, Sailors, Airmen, Marines, and everyone in a base camp.
Environment Department Experience Sharing & Lessons learn during Implementation of ESMF Muhammad Younis Zahid Muhammad Younis Zahid District Officer.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Lessons Learnt and Experience Sharing BY JAMIL AHMED BASRA DISTRICT OFFICER ROADS GUJRANWALA 2 ENVIRONMET AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) UNDE.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Experience sharing and Lessons learnt during implementation of Environment & Social Management Framework (ESMF) Engr. DILSHAD AHMED Deputy District Officer,
RD Lasco ICRAF1 TRADEOFF ANALYSIS OF ADAPTATION STRATEGIES IN THE PHILIPPINES RD Lasco 1 R.V.O. Cruz 2, J.M. Pulhin 2, F.B. Pulhin 2 1 World Agroforestry.
3.00 Understand employment, agency, environmental, energy, and intellectual property law environmental and energy law.
Experience Sharing and Lessons Learnt regarding Environmental & Social Management Framework (ESMF) Implementation in Presented By Mr. Shafaqat.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
UNCLASSIFIED As of W Mar 08 Mr. Scott A. Weidie, J722 1 Multinational Planning Augmentation Team (MPAT) 04 March 2008 Governments and Crises: Roles.
International Recovery Forum 2014 ~ The Role of Private Sector in Disaster Recovery ~ 21 January 2014 Kobe, Japan Dr Janet L. Asherson THE LINK BETWEEN.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Training on the Facilitation of Environmental & Social Management Framework (ESMF)
YMEP Environmental Training Overview of Training Program Four Modules: 1.USAID Environmental Guidelines Purpose and Overview 2.Environmental Screening.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
National Public Health Performance Standards Local Assessment Instrument Essential Service:6 Enforce Laws and Regulations that Protect Health and Ensure.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River October 2014 Bangkok, Thailand 1 Background of the Regional.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
International Atomic Energy Agency IX.4.2. Principles of radioactive waste management Basic technical management solutions: concentrate and contain, storage.
1. 2 Punjab Cities Governance Improvement Project (PCGIP) WASA GUJRANWALA Progress on Year 3 DLI’s 5 January 2015.
Site Control Instructional Goal The participant will see the need for a well-planned site control program and will experience some of the decision making.
Infection Control Risk Assessment Guidelines and Standards Richard Vogel - Infection Control Specialist.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
CDM Construction Design and Management
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
ISO Session 3 Environmental Management and Ethics in Management.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Infection Control Risk Assessment
Occupational Radiation Protection during High Exposure Operations
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Communication and Consultation with Interested Parties by the RB
INDOT Storm Water Management
Relationship between World Bank and Romanian EA requirements
Environment Safeguards
Presentation transcript:

WORKSHOP ON EXPERIENCE SHARING AND LESSONS LEARNT DURING IMPLEMENTATION OF ESMF IN Presented By SADAT ALI ASSISTANT DIRECTOR WATER QUALITY WASA RAWALPINDI PCGIP 2

CONTENTS About PCGIP About Environmental and Social Management Framework (ESMF) Environmental and Social Categorization of Schemes ESMF Implementation Steps Environmental and Social Management Plans (ESMP) Case study of ESMP preparation Benefits of ESMF Issues faced by WASA Conclusion PCGIP 3

PROJECT INTRODUCTION (PCGIP) Government of the Punjab, with the financial assistance from World Bank, is implementing Punjab Cities Governance Improvement Project (PCGIP). The project is focused at strengthening of systems and governance improvement for enhanced service delivery and being implemented in 05 large cities. PCGIP 4

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) ESMF has been prepared under the project “Punjab Cities Governance Improvement Project (PCGIP). ESMF serves as a guiding document to address the environmental and social issues during projects implementation covering following phases:  Planning and design, Construction and rehabilitation, Operation and maintenance, Decommissioning and closure phases. ESMF ensure that schemes to be designed and implemented by the Government are environmentally sound, socially acceptable and comply with the national regulatory and WB policy frameworks. PCGIP 5

ENVIRONMENTAL CATEGORIZATION OF SCHEMES PCGIP 6 E – 1 Schemes wherein major environmental impacts are foreseen EIA/IEE * E - 2 Schemes that are expected to have only moderate environmental impacts ESMPs ** E - 3 Schemes with negligible environmental impacts no further assessment required *Environmental Impact Assessment (EIA)./ Initial Environmental Examination (IEE) **Environmental & Social Management Plans (ESMPs)

SOCIAL CATEGORIZATION OF SCHEMES PCGIP 7 S – 1 schemes that will impact more than 40 households, and are expected to have significant negative social consequences RAP * S - 2 Schemes that will impact less than 40 households and are expected to have significant social consequences affecting local inhabitants RAP * S - 3 schemes expected to have no significant social consequences affecting local inhabitants SAR** * Resettlement Action Plan (RAP) ** Social Assessment Report (SAR)

1.Environment and social screening of all schemes 2.Prepare IEE/EIA/RAP/SAR/ESMP 3.ESMP/EIA/IEE is included in bidding document along with mitigation plans 4.Environment and Social Monitoring ESMF IMPLEMENTATION STEPS PCGIP 8

ENVIRONMENT & SOCIAL MANAGEMENT PLANS (ESMPS) For each scheme with E2 category, The Environmental and Social Management Plan (ESMP) is prepared according to the World Bank Policy Guidelines; environmental and social laws; and policies of Government of Punjab (GoPb). ESMPs will be used to identify and mitigate the environmental and social impacts that may emerge during implementation of schemes. PCGIP 9

ESMPs of WASA-R SCHEMES ESMPs have been prepared of following 04 schemes of WASA-R: 1.REPLACEMENT OF OLD LEAKING WATER SUPPLY LINE IN WASA EAST ZONE I 2.REPLACEMENT OF OLD LEAKING WATER SUPPLY LINE IN WASA WEST ZONE I 3.REPLACEMENT OF OLD LEAKING WATER SUPPLY LINE IN WASA EAST ZONE II 4.REPLACEMENT OF OLD LEAKING WATER SUPPLY LINE IN WASA WEST ZONE II PCGIP 10

CASESTUDY ESMP OF REPLACEMENT OF OLD LEAKING WATER SUPPLY LINE IN WASA WEST ZONE II PCGIP 11

SCHEME INFORMATI ON ESMP implementation cost: million Total cost of the scheme: 2.26 million (including ESMP cost) PCGIP 12

STEP 1 ENVIRONMENTA L AND SOCIAL SCREENING OF SCHEME PCGIP 13

STEP 2 ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) PREPARATION PCGIP 14 Scheme Replacement of old leaking water supply line in WASA West Zone-II Environment or Social Prospecti ve Potential Negative ImpactsMitigation Measures Responsibility Entity Monitoring Agency A. Development and Design Phase Public and Cultural Properties Disturbance to people visiting public properties i.e. mosque, schools, shrines, and graveyards etc. Incorporate technical design features to minimize the scheme construction activities to avoid any interference with cultural heritage site and public property as far as possible. WASA-R & Design consultant WASA-R Scheme development & design Failure of water works and flooding of nearby areas. Scheme design should consider terrain, soil characteristics, hydrology and geology. WASA-R & Design consultant WASA-R Disturbance to other services Other infrastructure like electrical cables, telephone poles etc. might disturb Scheme should be designed to avoid interference with other services. CDGR & Design consultant CDGR & Design consultant

ESMP CONT… B. Repair/Rehabilitation/ Construction Phase Surface & ground water quality deterioration the surface water quality. Analysis of surface water/ground WASA-R & Contractor WASA-R & ESSS Rainwater runoff Alteration in natural flow of rainwater runoff Riprap (cobbled stone), gravel or concrete will be used as needed to prevent erosion of drainage structures WASA-R & Contractor WASA-R & ESSS Access disruption Reduced pedestrian and vehicle access to residences and businesses Establish work sequence, provide alternative safe access; temporary crossings and walkways WASA-R & Contractor WASA-R & ESSS Construction material storage, handling and use Water may be contaminated due to the oil spillages if the water source is nearby the storage yard. Health risk to workers. Material shall be appropriately secured to ensure safe passage between the destinations during transportation. Loads shall have appropriate cover Contractor is also liable to pay the affectees ContractorCDGR & ESSS PCGIP 15

ESMP CONT… TrafficIncreased traffic inconvenience Use alternate traffic routing; ensure coordination with local authorities WASA-R & Contractor WASA-R & ESSS Solid waste Conflicts might arise due to piling of debris material and blockage of channel will be resulted. Dumping into agriculture lead to deteriorate crops. Immediately transport the debris construction waste Trash should be collected in waste bins. No dumping is allowed into agriculture fields WASA-R & Contractor WASA-R & ESSS Public health & safety Accidents/injuries can occur during rehabilitation work. PPE’s should be provided to workforce First Aid facility should be provided to workforce. Safety signs should be displayed. WASA-R & Contractor WASA-R & ESSS Oil/grease spillageOil/grease leaching into soil strata. Oil/grease leakage should be avoided and drums should be kept on concrete platforms. WASA-R & Contractor WASA-R & ESSS PCGIP 16

MONITORING PLAN Sr. # Identified Environmen tal & Social issues Mitigation Measure Monitoring Site Monitorin g Frequenc y Reporting Frequency Responsibility 1. Water quality Water samples will be taken and will be analyzed in the EPA certified laboratory. Once during repair/impr ovement phase Frequent site visits Once after completion of project; an environmental compliance report DO *(Environment) & ESSS** 2. Dust  PPE’s, Mask  Avoiding construction activities during nights.  Sprinkling of water Scheme Site Frequent site visits Once after completion of project; an environmental compliance report DO (Environment) & ESSS PCGIP 17

MONITORING PLAN CONT… 3 Waste managemen t  Immediately transport the accumulated construction waste to a site identified by the implementing CDG****/other concerned authority Scheme Site Frequent site visits Once after completion of project; an environmental compliance report DO (Environment) & ESSS 4 Provision of first aid in case of any emergency  First aid will be provided immediately to save the life of affectees.  Ambulance will be called up to shift the affectees to the nearest medical facility. Scheme Site Frequent site visits Once after completion of project; an environmental compliance report DO (Environment) & ESSS 5 Health, Safety and Environment al needs  The Contractor should ensure provision of appropriate housing, water supply, and sanitation facilities to labor.  PPEs Scheme SiteFrequent site visits Once after completion of project; an environmental compliance report DO (Environment) & ESSS PCGIP 18

ESMP IMPLEMENT ATION COST PCGIP 19 ItemQuantityCost /Item(Rs)Total Cost A.Safety Safety Shoes Gloves First Aid Box Safety Signs Sub-Total A44400 B. Environmental Analysis Ground Water Analysis (Bacterial analysis, pH, turbidity, TDS, total hardness, Arsenic, chloride, lead, nitrates, sulphates, zinc, mercury) Surface/ Waste Water Analysis (pH, TDS, TSS, oil & greece, cadmium, chromium (trivalent & hexavalent) lead, nickle, mercury, zinc, flouride, cyanide) Sub-Total B16200 C. Others Pole hanging waste bins Sub-Total C15000 D. Field Visits Environment Specialist Sub-Total D6000 Grand Total (A+B+C+D)81600

STEP 3 ESMP IMPLEMENTATION  The ESMP cost included in the scheme implementation cost.  The ESMP included in the bidding documents.  Training of Contractors conducted regarding ESMP compliance  Contractor's guideline for environmental and social management prepared by the Urban Unit distributed among the contractors PCGIP 20

STEP 4 ENVIRONMENTAL AND SOCIAL MONITORING  Frequent Site Visits  Environment and social checklist filling  Testing of environmental parameters through EPA certified laboratory  On site training of laborers and contractor  Public consultation  Photographic record  Monitoring report preparation PCGIP 21

BENEFITS OF ESMF IMPLEMENTATION  Environmental protection  Community involvement  Capacity building of contractors, labor and WASA  Environmental and social screening of schemes at identification stage  Environmental and social monitoring during scheme execution PCGIP 22

ISSUES / HURDLES FACED BY WASA REGARDING ESMF IMPLEMENTATION Labor are reluctant to wear PPEs People attitude towards cordon off work area PCGIP 23

Thanks PCGIP 24