1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.

Slides:



Advertisements
Similar presentations
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Design the Moving and Handling Fixture for the DECAM Imager Edward Chi Fermilab November 17, 2008.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
The CKOV support By P Lau. Hall space available to the Ckov & TOF 0 Beam line 3.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
A Preliminary Design of the Rotator for the DES Simulator Stand February 28, 2008 Edward Chi Fermilab/PPD/MD.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
High Density Cooling Air conditioning for high density applications
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
The ILC IR John Amann ILC Mechanical Engineering 09/12/06.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
Intelligent! Impressive! Incredible!
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
ICARUS Collaboration Meeting Dec A. Scaramelli.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Removable Lower Service Floor for the Scibar & EC Support Structures Edward Chi May 25, 2006 Fermilab/PPD/MD.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Kitakami Side AHCAL Assembly or anywhere in any detector.
ATLAS ATCA cooling evaluation project Claudio Bortolin (EP-ADO-PO) Michal Kalinowski (EP-ADO-PO) Lukasz Zwalinski (EP-DT-FS) ATLAS cooling team – 2016.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Elliott Microturbines Absorption Chiller Integrated System Development
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Do Now #7 What are the dimensions of the footing?
SBN Far Detector Installation & Integration
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Escalator Installation
Experimental hall design in Japanese site
- CT INSTALLATION PROCEDURE OVERVIEW -
Present status of the flux return yoke design
High Pressure Water Jetting
Initial BIS installation
Detector hall in mountain regions
The Garage Assembly Instruction By Laser Dollhouse Designs
TEC assembly and commissioning at Lyon
Bunker Wall Design Wall ESS
Enclosure openings with wires
Door Heat Exchanger: Specification
Polarized 3He target installation
Presentation transcript:

1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi

2 Electron Catcher (EC) Support Device See ( ec_scibar/support-ec ppt) for details Scibar Support Device See ( Sciboone/EC_Scibar/structure- Supt ppt) for details SciBooNE Project (Mechanical) MRD (E. Villegas) Scibar & EC Support Struc.System (Main Supt.Frame) Dark house, upper & lower removable floors, railings, A.C. system VME, HV Gain Monitor & other Accessorial Support Devices

3 Iso view of the Scibar & EC inside of the SciBooNE enclosure floor

4 Move Scibar & EC main supt. frame (pre-fabricated, ~9,800 lbs) to CDF Assembly hall

5 Install Hor. and Vert. EC supt. frame to the main frame before EC modules installation

6 By using the special horizontal EC module lifting fixture to install 32 EC modules horizontally, the mech. design should allow the alignment in x, y & z directions respectively.

7 Scibar Module layer Scibar module Lifting fixture Mr. H. Tanaka will try his best to reshape all shipped Scibar Module layers if needed (The supt. frame has added the device)

8 View w/all 64 scibar modules are installed (with x, y & z adjustment capabilities)

9 EC vertical super module (w/4 modules & plates) View of the 1 st EC vertical module Installed to the main support frame with the special vertical lifting fixture

10 View with all 32 vertical EC modules installed (w/x,y & z alignment ability), the clearance between the downstream surface of the 64 th Scibar module to the upstream surface of the EC vertical module is ~10 cm (z dir.), the clearance between the top surface of the floor to the vt. Module connect is ~12”(30.5 cm, y dir.).

11 Install pre-assembled PMT frames to the top and vertical of frame, also Install the gain monitors. (Will design the safety railings all around the top of the support frame)

12 Install the removable service the top service of the dark room (floor rating: 75 lbs/ ft sq.), the rest sides of the dark room still under developing. Remove one fl panel for reg. service access Please don’t using this service floor as boxing ring to excise you boxing skills!! WARNING: Please don’t using this service floor as boxing ring to excise you boxing skills!! Install the Movable railings

13 For moving out from CDF to SciBooNE site: View of the Scibar & EC detector with the special lifting fixture (total weight: ~36.5 tons) for lifting from CDF assembly hall to the low boy trailer on the CDF loading dock. (All railings must be removed) CDF loading dock and the 50 tons crane: 18’ clearance for the crane bridge, 19’ for the hook.

14 View of the CDF west sd. Door: 16’ height with 3 degree ramp The layout of the truck w/low boy trailer(25” height) loading with the Scibar & EC detector passing through the CDF west side door (limited to ” overall height). Remove the lifting fixture before moving out the CDF door.

15 Install Scibar & EC detector to the SciBooNE Enclosure with A.C. system (see on the next slide), HV & VME outside of the dark room. HV VME rack & supt. brackets

16 FAN (Grainger 7C409) Heat Exchanger (TBD) Inside dark room of the Scibar & EC Detector (2C temp. diff. between Inlet and outlet, heat load for PMT is ~ 2 KW) Chiller (Neslab HX200) re-use AC System for the Scibar & EC Detector R. Schmitt 4 GPM water 2000 CFM air 18 C

17 Top view of the Scibar & EC the SciBooNE enclosure Scibar & EC Detector Removable Platform and the Detectors (assuming the MRD is under the platform)

18

19

20

21 Questions…? Comments…? Suggestions…? Please Call (630) or