INTERNATIONAL ATOMIC ENERGY AGENCY Technical Committee Meeting of Technical Working Group on Nuclear Power Plant Control and Instrumentation 20 - 22 May.

Slides:



Advertisements
Similar presentations
Reporting on I&C status and recommendations to IAEA
Advertisements

EGYPT NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION “General Information on the Status of the Egyptian Nuclear.
TRAMPUS Consultancy Virtual Defense-in-Depth Concept in RPV Integrity Assessment P. Trampus 1st Hungarian-Ukrainian Joint.
Westinghouse Atom Atom- 1 Design of Digital Safety Systems in NPP Improvements regarding: System Requirements, Engineering, Argumentation for a Safety.
St Petersburg ATOMEXPO-2013 The IAEA recommendations for training of contractor personnel.
Criteria for IEC Standards Gary Johnson Chairman SC45A
2006 CMBG Conference IAEA activities and documents related to CM Configuration Management Benchmarking Group Conference June 2006, Richmond, VA Csilla.
IAEA International Atomic Energy Agency International Standards for NPP I&C Presented to TWG-NPPIC 2009 May 21 Vienna, Ausria Gary Johnson
International Atomic Energy Agency Achieving human performance excellence in the nuclear industry through leadership, education, and training C. R. Clark.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
Maintenance Optimisation At Rovno NPP Robert Hudson.
PRACTICE OF COLLABORATION WITH LOCAL INDUSTRY IN PROJECTS OF NPP CONSTRUCTION WORLDWIDE L. Yanko Vienna, 9-10 February 2010 Technical Meeting on Topical.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Technical Working Group on Nuclear Power Plant Instrumentation and Control Vienna, May 2009 NATIONAL REPORT ON NUCLEAR POWER PLANT INSTRUMENTATION AND.
TWG-NPPIC, May 2009, Vienna: UK status1 Current status of NPP I&C in the United Kingdom T P Smyth AMEC, Knutsford, Cheshire, UK 22 nd Meeting of the Technical.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
IAEA activities and documents related to CM C. Toth February 2007 Slide No. 1/ IAEA INTERNATIONAL ATOMIC ENERGY AGENCY IAEA activities and documents related.
AREVA: Steps towards a global leadership in the energy industry
BgNS International Conference ”Nuclear Power for the People”, September 2013, Sunny Beach, Bulgaria Pilot training of non-nuclear professionals within.
> AREVA NP GmbH NRPP-G, AREVA NP All rights are reserved, see liability notice.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 EU Requirements Jiří Veselý, SONS, Czech republic.
International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) - Technical Meeting October 2013, Vienna, Austria Results and discussion.
Presented by Dr. Kristóf Horváth Deputy Director General Hungarian Atomic Energy Authority Based on the Guideline developed by the WG on Computer Protection.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
State Nuclear Regulatory Inspectorate of Ukraine SE “Information Technologies Center for Use of Nuclear.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Maria J Moracho Ramirez Regulatory Activities Section
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
Regulation of Discharges of Nuclear Facilities in Ukraine Iurii Bonchuk Radiation Protection Institute Kiev, Ukraine EMRAS II - Reference.
IAEA I&C Activities Presented by Björn Wahlström, Chairman TWG-NPP CI.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
IAEA International Atomic Energy Agency International Standards, Codes and Guidance for Radiation Safety Regulatory Infrastructure IAEA Advanced Regional.
22 March 2012Stockmann, Pauwels, Mele: SSTC-NRS in the EU nuclear Safety Cooperation 1 SSTC-NRS IN THE EU NUCLEAR SAFETY COOPERATION Scientific and Technical.
0 Safety Infrastructure Development for Introduction of Nuclear Power S.K. Sharma Chairman, Atomic Energy Regulatory Board, India IAEA Workshop on Evaluation.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
PSR at Training Reactor VR-1 Marek Sedlbauer Czech Technical University in Prague IAEA Workshop on Application of the Code.
P1. Overview of Objectives & Agenda of Technical Meeting
STRENGTHENING NATIONAL INFRASTRUCTURES FOR THE CONTROL OF RADIATION SOURCES RER/9/096 REGIONAL PLANNING MEETING ARMENIA ASHOT MNATSAKANYAN Head of Radiation.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
The 22nd Meeting of The IAEA Technical Working Group on Nuclear Power Plant Instrumentation & Control ( TWG-NPPIC) May 2009.
I & C.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
The Egyptian Nuclear & Radiological Regulatory Authority (ENRRA)
Expert Review of the Licensing Documentation of the Centralized Facility for Long-Term Storage of Disused Sealed Radiation Sources Oleksii Tokarevskyi.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Plant Model application for design, verification and testing of Digital Control Systems at Nuclear Power Plants June Pravets, Bulgaria “EMV-ENERGO”,
Competence of Human Resources for Iran Nuclear Regulatory Authority
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Republican Unitary Enterprise “Belarusian Nuclear Power Plant”
JSC “ZAES” Activities Head of business development department
Training Courses for RPOs
Armenia Training and Tutoring Feedback
RCF Plenary Session 21 September 2018
USNRC IRRS TRAINING Lecture18
Legal and Regulatory Framework for Nuclear Installations in IRAN
The need for staff at NNEGC "ENERGOATOM"
Sector specific standards
Nuclear Safety Standards Committee 35th Meeting 24 – 28 June 2013
Presentation transcript:

INTERNATIONAL ATOMIC ENERGY AGENCY Technical Committee Meeting of Technical Working Group on Nuclear Power Plant Control and Instrumentation May 2009, Vienna, Austria REPORTING OF I&C STATUS (UKRAINE) Prof. Mikhail Yastrebenetsky Ukrainian State Scientific Technical Center on Nuclear and Radiation Safety

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky Contents 1.Common news 2.Modernization during Operating experience 4.Regulatory activity 5.Recommendation to IAEA

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky RIVNE NPP ZAPORIZHA NPP KHMELNITSKY NPP WWR 2×1000 WWR 6×1000 WWR 2×1000 WWR 2×440 SOUTH-UKRAINE NPP WWR 3×1000

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 1 Common news There are in Ukraine: -4 NPP’s; -13 units WWER-1000; -2 units WWER-440. The youngest units – Rovno 4 and Khmelnitskiy 2 – started in The age of the oldest units (Rovno 1, Rovno 2, South Ukraine 1) – years. Design life of these units – 30 years. The set of actions (including I&C) for life extension are fulfilling now. Decreasing of electricity production during January-March 2009 compared with January-March 2008: -Common – 13,7% -NPP – 13,6%

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 1 Common news According government plans, 2 units will be intended for commissioning to The site was determined - Khmelnitskiy 3 and 4. Type of units – WWER-1000, project B392B (analog – Balakovskaja NPP-5 – Russia). Manufacturer of reactor – Russia. Manufacturer of turbine and generator – Ukraine. Designers and manufacturers of I&C systems – Ukrainian companies. Main designer of I&C – KHIKA and “LvovOrgres”. The main problem – the assurance of unity of different systems because designers of different systems inside of Ukraine had different element base, difference of software, etc. Conception of I&C systems for these units will be ended in 2009.

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 2 New systems for Ukrainian NPP  – 2007–2009 Name of systemDeveloper RNPPSUNPP Kh NPP ZNPP Reactor protection system RADIY  Reactor power regulation and limitation system RADIY  KHARTRON- ARKOS  Control rod actuation system ŠKODA  IMPULS  Neutron flux monitoring system IMPULS  Engineering safety features actuation system RADIY  SPDS WESTINGHOUSE, WESTRON  Refueling machine control system GANZ, EWIG  DIAKONT, RADIY 

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 2 Implementation of Ukrainian I&C systems for foreign NPP Ukrainian company Name of systemName of NPPCountry RadiyEngineering safety feature actuation system Kozloduy NPP 2008 – unit 6 system unit 5 system2, unit 6 systems1, unit 5 systems 1,3 Bulgaria WestronSystem of diesel-generator control Armenian NPP Unit 2 Armenia Feedwater control system Kharkov Shevchenko plant Automatic turbine regulatorsBalakovo NPP-3, 4 Kalinin NPP-1, 2 Russia ASUT-240 Control systems for turbine (regulators, technological protection, monitoring and diagnostic) and generator Kaiga 3, 4India RAPP 5, 6

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 3 Operating experience Operating reliability of I&C systems, designed by “Radiy” company Name of system Reactor protection systems Reactor power and limitation control systems Engineering safety features actuation systems systemssetschannelssystemschannelssystemschannels Number Operating time, h Number of failures Estimation of failures intensity, Е ‑ 06 low confidence bound ––10,6–19,2–32,8 point 006,105,37012,7 high confidence bound ––3,17–1,08–3,45 There weren’t any failures of systems or sets as a whole. Comparison of all operating measures with design measures and requirements measures in specification was fulfilled for channels. Operating measures are close to design measures (e.g. design failure intensity for channel of reactor protection system is 11.6E-06, point estimation is 6.1E-06). All measures for systems satisfy the specification requirements.

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 3 Operating experience Reliability of FPGA Different types of FPGA – manufacturer “Altera” (USA) Common number of FPGA in reactor protection systems, reactor power control systems and ESFAS is FPGA had not failures for operating time during the observation.

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky Analysis of violations due to I&C Level of violations according INES- 1, 0, out of scale Intensity of violation decreased in function of time ( for violations due to I&C and due to technological equipment too) Important reason of violations- events outside of I&C (ventilation system, EMC, etc) Measures how modernization improved safety Influence of SW

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 3 Operating experience Reactor power control and limitation systems (designer – Radiy) Reactor protection systems (designer – Radiy) Control rod systems (designer – Skoda-Controls) Before moder- nization After moder- nization Before moder- nization After moder- nization Before moder- nization After moder- nization Operating time, years Number of violations 2–4–165 Violations intensity, 1/year 0,01400,02900,150,074 Unit downtime, h0–55,39038,150 Underproduction of energy, 10 6 kWh 3,5–55,3047,90716 Influence of I&C systems modernization to NPP safety

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 3. Analysis of operating data about NPP violations due to the I&C systems Comparison of software influence to NPP violations because digital systems Ukraine USA B.Geddes and R.Torok 2 out of 13 (1 st generation), 0 out of 20 (2 nd generation) 4 out of 49 (1E systems) Agreement with B.Geddes, R.Torok Protection against the software failures is already at a “reasonable assurance level”

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 4 Regulatory activity Common Principles of NPP Safety Regulations of NPP Reactors Nuclear Safety Safety Requirements to NPP Digital I&C Systems (Revision 1) IEC IEC IEC 1226 IEC IEC IEC IEC IAEA NS-R-1 NS-G-1.3 NS-G-1.1 NP /ХХХ-2009 NP NP Ukrainian Regulations Regulations with Requirements to NPP I&C

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 4 Regulatory activity (2) Requirements on Nuclear and Radiation Safety to digital safety important Instrumentation and Control Systems NP /XXX Common positions 2. Main terms and definitions 3. Classification 4. Functional requirements -common positions -safety control systems -safety related systems -control rooms 5. Requirements to dependability of functions -protections after CCF -single failure criteria -redundancy -diversity -reliability measures -diagnostic -protection after unauthorized access -protection after personnel error

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 4 Regulatory activity (3) 6. Requirements to resistance of functions -environment -mechanical influence -electrical supply -EMC 7. Requirements to quality of functions -accuracy -MMI -response speed 8. Requirements to independence of functions 9. Requirements to software and hardware 10. Requirements to design 11. Requirements to confirmation of compliance

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 4 Regulatory activity (4) Methods of Assessment of NPP I&C Compliance with Safety Requirements Requirements of Order and State of the Actions for Safety Important NPP I&C Life Extension Methods of Expert Review of NPP I&C, based on FPGA (Revision 0) NP NP /2-068 Regulations with methods related to NPP I&C

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky Knowledge base for expert activity -International (IAEA, IEC,ISO) and Ukrainian standards Requirements to I&C (Comparison) Expert reviews Documentations of new systems Methodics Text (or list) of books and articles

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 5 Recommendation to IAEA (1) I) TECDOC. Review (comparison and analysis) of WWER I&C systems (Russia, Ukraine, Hungary, Bulgaria, Czech Republic, etc.) (similar IAEA Technical Report N387, part 5 “Modern I&C for NPP: Guidebook”) The base of this chapter from Ukrainian side may be the new book “NPP Safety: Reactor Control Systems” (in Russian – “SUZ”), Kiev, 2009 (in publisher house now)

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 5 Recommendation to IAEA (2) The content of this book: 1.NPP with WWER 2.Common information about reactor control systems (RCS) 3.Type project and modernization of RCS 4.Standard base 5.Classification 6.Common requirements 7.Peripheral equipment 8.Neutron flux monitoring systems 9.Protection systems 10.Power control and limitation regulators 11.Control rod actuation systems 12.Some results of operation Attachments 1.Classified list of standards 2.FPGA

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky 5 Recommendation to IAEA (3) II) Updating of NS-G-1.3, NS-G-1.1 III) I&C Roadmap in Support of Reactors III+IV generations IV) Collection, summarizing and analysis of information about NPP safety violations because I&C failures (independent of COMPSIS, not only digital systems) - TECDOC or coordinated research program Y) Knowledge base related to I&C

REPORTING OF I&C STATUS (UKRAINE) Mikhail Yastrebenetsky Thanks for attention