Hans-Åke GustafssonLHCC review January 31, 20051 ALICE meets LHCC referees 31/01/2005 15:00  Milestones report H-A Gustafsson  FMD questions H. Boggild.

Slides:



Advertisements
Similar presentations
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
Advertisements

1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
AGATA Pre-processing team report AGATA Week, July 2008.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Responsibilities & Planning DCS WS L.Jirdén.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
CERN November 22, 20041W.H.Trzaska HIP Jyväskylä T0 answers Meeting with LHCC referees CERN, November 22, 2004.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration)
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
V0 present status of the V0 project at CERN A. Sandoval, R. Alfaro.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
ELENA installation progress F. Butin / ELENA collaboration.
ALICE Muon Tracking Upgrade
T1 status (a selection from EDR presentations)
T1 Electronic status Conclusions Electronics Cards:
Renovation of the 45-year old PS magnets
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Current Status Future Progress Monitoring
CMS RPC Endcap RE1 Status Report
Pierluigi Paolucci - I.N.F.N. Naples
CMS Goal of the experiment
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
ESB Networks Market Release Meeting of the IGG, March 5th 2009
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild  T0 questions W. Trzaska  V0 questions J-Y Grossiord AGENDA

Hans-Åke GustafssonLHCC review January 31, General Milestone Comments The ALICE Management through the TC are reviewing the planning of all subsystem milestones to be presented at the CR5. This will result in a new baseline for the LHC milestones. We suggest to present in addition a “just in time” LHC milestone list. Furthermore, a milestone plot for the previously agreed “minimal ALICE detector” will be presented.

Hans-Åke GustafssonLHCC review January 31, The TPC pre-installation in SXL2 has been delayed. The space available is limited and there is no need to install the required racks with network and DCS computers in SXL2 until the pre-installation is finished. Racks, network and the DCS Back-end computers are being prepared and will be installed as soon as the space has been liberated, which presently is estimated to March 2005 DCS milestone 547 Jan-05 -> Mar-05

Hans-Åke GustafssonLHCC review January 31, Trigger milestone 301 Jan-05 -> done The CTP boards are in the final design stage and the schematic design for the first board is currently being converted to a PCB at RAL. The remaining boards will follow in sequence. A) Production of all boards will be finished by this Summer. B) Testing of the complete CTP processor is expected to commence in Sep-05. C) Installation of the CTP in ALICE pit is likely to begin in very early 2006 (January or February). D) Software development for the CTP is ongoing.

Hans-Åke GustafssonLHCC review January 31, DIMUON milestone 111 Jan-05 -> Feb-05 The disassembly of the magnet in the pre- commissioning position has started end The reassembly of the yoke in the final location will start mid February A delay is also announced on the next Dipole milestones. The commissioning of the dipole at final location (milestone 112) will be carried out in Jun-05 and the field mapping will start (milestone 113) in Jul-05 (completion Sept-05).

Hans-Åke GustafssonLHCC review January 31, DIMUON milestone 431 Dec-04 -> done Further system tests will continue during This will not delay the construction and installation of the elements on the chambers.

Hans-Åke GustafssonLHCC review January 31, DIMUON milestone 163 Jan-05 -> Apr-05 The muon filter is at present under construction. The first of the seven modules will be delivered at CERN in the beginning of Feb-05. The others will follow and the delivery will be completed by Apr-05. It is worth to note that this shift, which is not critical, has allowed substantial savings.

Hans-Åke GustafssonLHCC review January 31, DIMUON milestone 146 Dec-04 -> done This milestone has been achieved. The construction has been completed and the frames are within specifications. DIMUON milestone 139 Jan-05 -> done The construction of slats for station 5 was started according to schedule.

Hans-Åke GustafssonLHCC review January 31, DIMUON milestone 141 Dec-04 -> done The production of the slats for St. 4 was completed. All the slats underwent HV and gas tests, while read- out tests are at present in progress.

Hans-Åke GustafssonLHCC review January 31, DIMUON milestone 424 Jan-05 -> May-05 Tracking Electronics 424 end of tendering MANUS Oct- 03, Jan-05, May-05 The delay on this milestone is due to administrative reasons. May-05 is the present date for choosing the company. This delay has an impact on milestone 426 (electronics ready for installation) which is postponed to Nov-05. This date is however compatible with the installation plans (start Jan-06).

Hans-Åke GustafssonLHCC review January 31, DIMUON milestone 487 Jan-05 -> Jan-06 This milestone is shifted to Jan-06 (see also reports on milestones 441 and 442). The trigger mechanical support, the trigger detector and FE electronics as well as the regional and local trigger boards (and cables from FEE to trigger electronics) will be ready for the start of the installation in Jan-06.

Hans-Åke GustafssonLHCC review January 31, DIMUON milestone 441 Jan-05 -> Dec-05 As already communicated in the report of Nov-04, the tests with cosmics of the whole RPC production (milestone 440) will be completed by Nov-05. This implies that the chambers will be ready for installation in Dec-05. This delay is compatible with the new schedule for the installation of the muon trigger detector, which will start in Jan-06.

Hans-Åke GustafssonLHCC review January 31, DIMUON milestone 442 Feb-05 -> Aug-05 A pre-production batch of the local trigger boards (20 units, corresponding to 10% of the total production) was delivered in the fall-04. These boards underwent extensive tests and all of them were found to be fully operational. Following this result, the whole production was ordered in Dec-04 and will be completed by Feb-05 (milestone 436). The test bench (both hardware and software) is ready for testing the whole production. These tests will continue until Aug-05

Hans-Åke GustafssonLHCC review January 31, DIMUON milestone 318 Dec-04 -> Dec-05 The electronics development is progressing normally in Lyon. A first FEE board (CIU) is under tests since November The design of a second board (CCIU) has started. The tests of both boards will be carried out during this year in order to have the final design in December DIMUON milestone 319 Dec-04 -> Dec-05

Hans-Åke GustafssonLHCC review January 31, HMPID milestone 14 Feb-05 -> done The PRR of the liquid circulation system was successfully passed in February Blue prints of the system were prepared in November 2004 after the completion of the comprehensive tests performed in Bari with final size prototypes. Such tests allowed to define the critical parameters of some relevant circuit elements like the height of the header tubes and the diameter of the inlet and outlet pipes. The pieces of the circulation system available on the market were procured whilst the custom pieces were manufactured at CERN. Assembly of the HMPID cradle will start in the next weeks after the loading test of the support structure is finished.

Hans-Åke GustafssonLHCC review January 31, ITS milestone 82 Dec-04 -> This milestone will be commented by the ITS group at the meeting.

Hans-Åke GustafssonLHCC review January 31, PMD milestone 188 Sep-04 -> Dec-05 Mixer unit essential completed. Components for distribution unit are being ordered. PMD milestone 187 Oct-04 -> Dec-05

Hans-Åke GustafssonLHCC review January 31, PMD milestone 528 Feb-05 -> done First batch of MANAS done. Delivery together with MANAS for the muon system MANAS chips ready for packaging. A small delay of one month to achieve 10% unit module production PMD milestone 525 Feb-05 -> Mar-05 PMD milestone 526 Feb-05 -> Sep-05 The delay is due to the rejection of the main batch of PCBs. A new supplier had to be found. A schedule review will be held on Feb 3-4 at VECC.

Hans-Åke GustafssonLHCC review January 31, TOF milestone 458 Jan-05 -> done See F. Formenti's report (27/9/2004) on TOF Electronics production schedule. In time with the schedule, INFN has approved in December 2004 the start of the tender for the FEA boards, hence the tender has started. Next steps will follow, as presented in Formenti's report. TOF milestone 450 Jan-05 -> Jul-05 See report on milestone n. 449 (Start module assembly). With the first assembled modules expected at the end of May/beginning of June 2005, we plan to start the test with the cosmics station at CERN in July 2005.

Hans-Åke GustafssonLHCC review January 31, TOF milestone 449 Jan-05 -> Jun-05 The tender for modules assembly was finished and approved by INFN at the end of December 2004, with a delay with respect to expectations. Production, delivery and test of the prototypes (one for each type of module) will take about 4 months. Therefore we foresee to have the first assembled modules at the end of May/beginning of June 2005.

Hans-Åke GustafssonLHCC review January 31, TOF milestone 477 Jan-05 -> Apr-05 The HV system is made of 32 boards (CAEN A1534), housed in 2 CAEN SY1527 mainframes, bringing the HV to the TOF modules through a chain made of tripolar cables followed by distribution boxes; each box feeds up to 5 unipolar cables providing the HV (separately for +ve and -ve polarity) to a module. The full chain has been successfully tested : A) the A1534 boards (both the positive and the negative polarity) have been extensively tested at PS and in Bologna; B) the tripolar cable (Kerpen SL-V2YCH 3XAWG26) and tripolar connectors (CPE ) have been tested in the beam. This material is purchased and stored at CERN; C) the final samples of the unipolar cable and connectors have been delivered and tested in beam; D) the final prototypes of the distribution box have been delivered and tested. Therefore we foresee to have most of the parts for the HV system produced (at least the part needed this year) delivered by April 2005

Hans-Åke GustafssonLHCC review January 31, TPC milestone 221 Jan-05 -> Jun-05 The preparations for the ITS-TPC integration test have lasted longer than anticipated, with the test itself now scheduled to finish in Apr-05. May-05 will be needed to set up the infrastructure in the SXL2 clean room: crane, a platform easily adaptable in height for access to the sectors, storage and cleaning facilities for chambers. Actual mounting of chambers will start in Jun05. TPC milestone 246 Oct-04 -> done This milestone is the combination of #205,207,209,210, leading to the start of the ITS-TPC integration tests. The last pieces to be completed in Nov-04 were the feet for the Service Support Wheels and the track-rods and tie-rods connecting it to the end plate.

Hans-Åke GustafssonLHCC review January 31, TRD milestone 356 Dec-04 -> done The PRR took place as scheduled on December, 15. Low voltage distribution (in particular the return currents of the individual supply voltages) as well as grounding at the PASA input is not fully optimized yet. Consequently, the design goal for the system noise of 1000 electrons has not yet been achieved. To this end detailed measurements were carried out and further modifications were suggested. They have been implemented in the latest design. Board delivery scheduled for end Jan-05.

Hans-Åke GustafssonLHCC review January 31, TRD milestone 357 Jan-05 -> Jun-05 As mentioned for milestone 356 the readout board is undergoing some modification to reach optimum performance with respect to overall system noise. Also, production of the final digital chip has been delayed because of delivery problems at the foundry incurred with the engineering run. Consequently, the start of production will be delayed. In addition, one further design modification is being implemented in order to reduce the voltage drop across the voltage regulators which constitutes a significant fraction of the entire power budget of the TRD.

Hans-Åke GustafssonLHCC review January 31, TRD milestone 355 Dec-04 -> done Heidelberg, Dubna, Bucharest, and GSI are producing chambers. Common quality assurance procedures have been established. By the end of December the milestone for 10% completed was reached.