US Army Corps of Engineers BUILDING STRONG ® USACE Status: Metro East Levees September 21, 2011.

Slides:



Advertisements
Similar presentations
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
Advertisements

Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Fort Bend Flood Management Association Flood Risk Reduction Symposium October 3rd, 2014 (Part-A) Brazos River at San Felipe - USGS Gage Fort Bend County.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
CPRA Board Meeting, Baton Rouge, LA May 15, 2013 Coastal Protection and Restoration Authority.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7A APPLICATION NO
June 23, 2011 Southwestern Illinois Council of Mayors.
Preparing for the Rainy Season SFWMD Operations & Actions.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
Central Valley Flood Protection Board Meeting – September 27,
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
October 17, 2011 League of Women Voters of Collinsville.
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
Craig Conner Flood Risk Management Program Manager San Francisco District 9 December 2013 US Army Corps of Engineers BUILDING STRONG ® San Francisco District.
BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System Lake Pontchartrain & Vicinity LPV- 03.2B, West Return Floodwall,
Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS and
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
BUILDING STRONG SM Society of American Military Engineers and U.S. Army Corps of Engineers, Little Rock District 2009 SAME Symposium Little Rock District’s.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
US Army Corps of Engineers BUILDING STRONG ® Kansas Citys, Missouri and Kansas Flood Risk Management Project Presentation to Kansas City Industrial Council.
US Army Corps of Engineers BUILDING STRONG ® Prioritizing Investments within the USACE Levee Safety Program Process and Methodology Overview Jason Needham,
Matt Schueler Civil Project Management & Programs
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
One Team: Relevant, Ready, Responsive, Reliable 1 MRGO Closure Status Next Steps & Status USACE & State negotiate and sign MOA Plans & Specifications for.
US Army Corps of Engineers BUILDING STRONG ® Little Calumet River Marshalltown Levee System Routine Inspection Yuki Galisanao, PE, PG Team Lead, Geotechnical.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
DWR Maintenance Area Response to USACE Periodic Inspections Presented by: Noel Lerner, Chief, Flood Maintenance Office Mark List, Chief, Maintenance Support.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Planning for Non-Routine Activities
US Army Corps of Engineers Great Lakes & Ohio River Division US Army Corps of Engineers Great Lakes & Ohio River Division Achieving Navigation Systems.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
BUILDING STRONG ® Value Methodology Applied to Levee Repairs Missouri River Basin 2011 Flood Repairs.
1 An Approach to Levee Assessment and Contingency Planning Presentation to the National Waterways Conference 7 September 2006 Portland, Oregon By Rob Vining.
Yuba County Comprehensive Flood Protection Program
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers New Orleans District 75 th Annual Association of Levee Boards of Louisiana COL.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Interlocal Agreement – Transportation Impact Fees City Council Meeting July 16, 2013.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
An Overview of: Generation Connections: Transmission Connection Cost Responsibility Review July
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
Tempe Town Lake Downstream Dam Replacement NEW DAM ALTERNATIVES SELECTION January 5, 2012.
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
Federal Project No. BRLO 5951 (151) Bonita School Road Bridge Replacement September XX, 2013 Applicant: Santa Barbara County Public Works Transportation.
City of Key West Stormwater Fund Fiscal Year Half-Year Budget Review April 20, 2010.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
Northwest Area Mobility Study FasTracks Monitoring Committee
Shawn D. Wilson, Ph.D. Secretary
Feather River West Levee Project Project Area C May 24, 2013
NC Division of Water Infrastructure Drinking Water Grant
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
PROPOSED 34 BIKE SHARE STATION LOCATIONS FOR PHASE 2 OF THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (METRO) REGIONAL BIKE SHARE PROGRAM.
Check On Learning Q: What manual, regulation, or publication governs The Army Management Structure for Fiscal Year? DFAS-IN MANUAL FY DFAS-IN 37-1.
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
Fab-Five Projects New Orleans FY19-FY23
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® USACE Status: Metro East Levees September 21, 2011

BUILDING STRONG ® Project Status  Wood River  Reconstruction 31% Complete; $43.9M Invested Closure Structures Gravity Drains Pump Stations  Reconstruction Design Deficiency Discovered Greater Issues, led to  Expanded Design Deficiency- LRR Approved Can be included in FY 2013 Funding Cycle (Oct 1, 2012)

BUILDING STRONG ® Project Status, cont’d.  MESD  Reconstruction 86% Complete; $49.9M Invested Fixed Most Everything Above Ground North Pump Station, O&M Manuals, As-Builts Remain  Design Deficiency LRR Approved Can Be Included in FY 2012 Funding Cycle (Oct 1, 2011)  Chain of Rocks  Deficiency Correction 70% Complete; $42.6M Invested Next Phase Can Be Included in FY 2012 Funding Cycle

BUILDING STRONG ® Project Status, cont’d.  Prairie Du Pont/Fish Lake  Do Not Have Design Deficiency LRR Approval  Benefit/Cost Ratio Low  “Stepping Back” To Re-Assess Value of Railroads and Their Products; Extremely Difficult to Assess Considering Merging Design Deficiency with Rehab. And Reconstruction May Potentially Exclude Some Work May Build on Council’s Work

BUILDING STRONG ® Section 408 Permit  Need Council’s Submittal Plan to Support Council’s Construction Schedule as Expeditiously as Possible  Establishing Meetings To Initiate That Plan  Starting Monthly Coordination Meetings with Dallas-Ft. Worth and Sacramento Districts for Coordination of Efforts and Lessons Learned  The St. Louis District has written a review plan for its proposal of review of the Council’s work  Plan is undergoing internal review and will then be submitted to Division for approval

BUILDING STRONG ® MESD Rating  12 Items Were Noted Unacceptable During Periodic Inspection  Items Have Been Addressed Such That They Are No Longer Unacceptable  13 th Item: Underseepage  Due to the Predominant Existence of Sand Boils at Times of Low Flood, and Recent Subsurface Exploration, Levees Were Rated Unacceptable Per the Rating Standards Since Project Active, No Issue with Remaining In PL84-99 Program