SCRF Monthly WebEx Meeting June 2, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.

Slides:



Advertisements
Similar presentations
SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
Advertisements

Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
- Asian Single Tunnel Design Review – A Review on Design Study of the ILC Conventional Facility in Mountain Region Review Organization and Requirements.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
14-Nov-11 PAC - Prague Global Design Effort 1 Barry Barish PAC - Prague 14-Nov-11 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK,
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
ILC-BAW1 Interim Summary and Further Plan Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK, Sept. 9, ,
Advanced Accelerator Association (AAA) Promoting Science and Technology - Activities with Technology Group : A. Yamamoto AAA Activities, Japan.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
19-May-11 PAC Mtg - Taiwan Global Design Effort 1 Barry Barish PAC Meeting Academia Sinica, Taiwan 19-May-11 GDE Director’s Report Grooved Insert for CesrTA.
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
26-Sept-11 LCWS - Granada Global Design Effort 1 Barry Barish LCWS11 - Granada 26-Sept-11 Global Design Effort ILC R&D and Technical Design Grooved Insert.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
Advanced Accelerator Association (AAA) Promoting Science and Technology - Activities with Technology Group - 1 AAA : A. Yamamoto 第一期技術部会活動 Michitaka.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
SCRF Monthly WebEx Meeting May 6, 2010
LCWS11 AWG9 PARALLEL SESSION SUMMARY
SCRF Monthly WebEx Meeting Sept. 22, 2010
SCRF Monthly WebEx Meeting May, 6, 2011
SCRF Monthly WebEx Meeting Jan. 12, 2010
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
WG3: Main Linac SCRF(cavity,cryomodule)
Nick Walker (DESY) EU GDE Meeting Oxford
Yasuhiro Okada, Executive Director, KEK
Barry Barish JSPS - Sendai 12-Sept-11
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

SCRF Monthly WebEx Meeting June 2, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D Plan (Rel. 5) Preparation(30 min.) 2.BAW-1 Preparation (10 min.) 3.Others , A. Yamamoto1SCRF WebEx Meeting

Report from PMs ILC Program Advisory Committee (ILC-PAC) – Held at Valencia on May 13 and 14 Workshop on ‘Cavity Industrialization’ – Held at Kyoto, May 23, as an IPAC satellite meeting Review on Design Study of Asian Single in Mountain Regions – held at KEK, June 1 and 2, Baseline Assessment Workshop (BAW) – 1 – Held at KEK on Sept. 7 – 10, Single tunnel HLRF (Sept. 7 – 8) Accelerating Cavity Gradient (Sept ) – Information to be sent to Physics and Detector Groups Mailing list to be added, including SiD and ILD representatives , A. Yamamoto2SCRF WebEx Meeting

Project Advisory Committee Review - Summary Agenda: – ‘Cost Containment is essential for ILC’ – (Barry) – SB2009 (Ewan) – SRF (Akira) – Beam tests / test facilities: CesrTA, ATF/2, FLASH (Mark P, Toshiaki, John C) – Collaboration with CLIC (Mike) Technical focus – Written response to previous review questions (November 2009) provided (see indico)see indico – Beam Test reports excellent Chair: Lyn Evans , A. Yamamoto SCRF WebEx Meeting 3

Project Advisory Committee Review - Closeout Verbal comments on management – related topics: “ Strongly support cost containment and cost reduction efforts The biggest issue of all is the ‘buy-in’ of the experimenters. We have to make sure that the detector voice is represented. Change control is important. It should get more and more formal depending on the ‘stakeholders’. The main message: you are going to come under enormous pressure to defend the ILC cost once the XFEL costs are known. “ We (PM) are quite pleased with the committee’s initial comments , A. Yamamoto SCRF WebEx Meeting 4

A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf. Center, Kyoto, Japan Organized by:ILC-GDE Project Managers, Objectives: To discuss and exchange information on: – preparation for the ‘ILC SCRF Cavity’ industrialization between industries and laboratories, – Industrialization plan to be reported by laboratories, and – Comments/advices given by industries, 5SCRF WebEx Meeting , A. Yamamoto

Cavity Industrialization WS: May 23 09:00 ~ 09:35 Introduction 09:00 Opening Remarks (15') A. Yamamoto (KEK, ILC-GDE) 09:15 Current Status of SCRF Cavity development (20') R.Geng (JLab), J. Kerby (FNAL) 09:35->10:30 Industrialization Experience at European Laboratories 09:35 European XFEL cryomodule production model and status (20') O. Napoly (CEA/Saclay) 09:55 CERN Industrial Experience with LHC Construction (35') P. Lebrun (CERN) 10:45->12:15 Laboratory Plans in the American and Asian Regions 10:45 American Region Laboratory Plans (45') B. Kephart (FNAL) 11:30 Asian Region Laboratory Plans (45') H. Hayano (KEK) 13:15->15:30 Industrial Experience / Studies / Advice 13:15 European industrial experience with large international projects (30') W. Walter (Babcock Noell) 13:45 From Americas region (1h00') * Industrial studies of ILC cavity and component production in the Americas (30') T. Favale (AES) * The interim US market for SCRF accelerator technologies (30') Ken Olsen (SPAFOA) 14:45 From Asian region (45') * Industrial studies with Japanese industries (30') E. Kako (KEK and J. Industries) * Efforts with the Advanced Accelerator Science/Technology Association (15') M. Ono / A. Yamamoto (AAA) 16:00->16:40 Nb Material Supply 16:00 Industrial comments on the material requirements for the ILC (25') H. Umezawa (Tokyo Denkai) 16:25 High pure Nb; Indust Alt. Production and Strategic Cooperation (15') B. Spaniol (Heraeus) 16:40 General Discussion (35') All 17:15 Summary (15') J. Kerby (FNAL) 17:30 End , A. Yamamoto 6 SCRF WebEx Meeting

CF Review - June 1-2 Asian Single Tunnel in Mountain Region Based on the review of: –Conceptual design of the ILC Conventional Facility (CF) in mountain regions in cooperation of KEK-LC-CFS Group and AAA Conventional Facility Working Group (AAA-CF-WG) –Consistency with the ILC-GDE CFS design guideline for SB2009 and TDP-2 R&D Plan –Work-package plan for conventional facility design to be executed at KEK since JFY2010. To evaluate and advise/recommend: –Technical feasibility/reality, and consistency with the GDE design guideline –Further work required in the CF design work with the necessary priority with limited resource and time in TDP , A. Yamamoto 7 SCRF WebEx Meeting

TDP R&D Plan Rel-5, Major Subjects to be discussed Regional expertise, global Industrialisation Average accelerating gradient Cost (cryomodule, mass-production models) SCRF Technology Sources DR (e-cloud) BDS / MDI R&D (General) Consolidation of baseline(s) Design choices (parameters, layout etc.) Design work (documentation) AD&I (CFS) ICET (schedule tool) Traceable, defendable Justification Cost & Schedule R&D (and engineering) beyond 2012 Impact (design, cost, schedule) Mitigation (fall-back solutions) TDR Risk >2012 Remains special case Project Implementation Plan Industrialisation in-kind contribution models Site requirements Project Schedule Remaining Technical activities , A. Yamamoto 8 SCRF WebEx Meeting

SCRF Main Subjects 1a. Request for Rongli G.: Proposal for R&D plan and strategy for improving the cavity gradient, Q0, and radiation, Proposal for the way of evaluation in terms of radiation which also cause the limit of the gradient, 1b. Request for Camille G.: Proposal for further evaluation of the cavity performance based on the current status of the production yield plot, –spread of cavity gradient and the quantitative evaluation with a new plot and width (RMS), –Q0 value evaluation at G = 31.5 MV/m, 1c. Request for Akira in communication with Jim K Proposal for re-arrangement for the cavity/cryomodule cavity gradient specification for the iLC accelerator components and for the operation , A. Yamamoto SCRF WebEx Meeting 9

SCRF Major Subjects 2a. Request for Hitoshi H.; Proposal for R&D plan for the cavity integration including tuners and input couplers, including a systematic test plan for S1-Global, which contain these evaluation, Proposal for a cavity fabrication (and industrial R&D) facility to be estalished at KEK as an approach, 2b. Request for Jim K. iin communication with Bob K. : Proposal for R&D plan for the cavity mass production in the US, 2c. Request for Akira (myself) in communication with DESY (Nick will help me), Input and reflection of the progress in XFEL mass production program, , A. Yamamoto SCRF WebEx Meeting 10

SCRF Major Subjects 3. Request for Norihito and Tom in cooperation with Harry and Hirotaka Proposal for R&D plan for the cryomodule integration, including the cryomodule assembly and cryogenic test plan for S1 Global and for further (S2 cryomodule), 4. Request for Shigeki F. and Chris N. ; Proposal for R&D plan for KCS and DRFS in single tunnel - Further proposal for ACD RF such as Marx Generators, 5. Request for Chris A. in communication with Jim K., and Vladimir K. Proposal for R&D plan for split-quadrupole in cryomodule, Proposal for R&D plan for cavity alignment and tolerances, 6. Any others, if they should be included , A. Yamamoto SCRF WebEx Meeting 11

R&D Plan To be updated Draft due: June 11 from Group Leaders and Collaborators Completion; Jun , A. Yamamoto SCRF WebEx Meeting 12

1 st BAW Announced, May 3 Date: Sept. 7 – 10, 2010 Place: KEK Subjects: – Single tunnel HLRF systems (Sept. 7 – 8) – Accelerating gradient (Sept. 9-10) Announcement – Distributed to GDE mailing list including physics/detector executive members, URL and Indico Agenda including registration – To be prepared in cooperation with GDE secretariat and KEK LC-office, , A. Yamamoto13SCRF WebEx Meeting

Preparation for the 1 st BAW May 7: SCRF webex meeting and homework assignment May 26: AD&I meeting June 2: SCRF webex meeting and progress report from each collaborator, June 23: AD&I meeting June 30:SCRF webex meeting and preliminary draft report to be distributed July 21: AD&I meeting July 28: SCRF meeting and draft report to be distributed, Aug. 25: SCRF meeting and the final report (prior to the 1 st BAW) to be distributed , A. Yamamoto14SCRF WebEx Meeting

Discussion Topics: Single-tunnel HLRF system in the 1 st BAW, Sept. 7-8, 2010 KCS: – RF power margin required for cluster operation, including gradient spread, as consistent with cavity production strategy, – Tuning and control strategy, including impact on high gradient operation and required gradient operational margin – RF amplitude and phase performance tolerance within a cluster; allowed common-mode and normal-mode fluctuations, – R&D required, including demonstrations of component performance and demonstrations with small clusters DRFS: – Cavity and klystron sorting and resulting required RF power margins – Installation strategy; needed tunnel infrastructure and access – RF amplitude and phase performance tolerances, including gradient spread, as consistent with cavity production strategy, – R&D required in the remaining half of the TDP (and beyond) including radiation shielding, klystron lifetime, redundancy strategies Backups: – Original RF system in RDR, in single tunnel, just in case, as a backup, , A. Yamamoto15SCRF WebEx Meeting

Discussion Topics: Accelerating Gradiet 1 st BAW, KEK, Sept. 9-10, 2010 Gradient Improvement Studies: – material/fabrication, surface processing, instrumentation and repair – strategy to overcome 'quench', and 'field emission' and to maintain moderate cryogenic load, – improvement of gradient and achievement of adequate yield, Strategy for Average Accelerating Gradient in the ILC: – Overview and scope of 'production yield' progress and expectations for TDP, including acceptable spread of the gradient needed to achieve the specified average gradient, – Specifications of Gradient, Q0, and Emitted Radiation in vertical test, including the spread and yield, – Specifications of Gradient, Cryogenic-load and Radiation, including the gradient spread and operational margin with nominal controls, in cryomodule test, – Specifications of Gradient, Cryogenic-load and Radiation, including the gradient spread and the operational margin with nominal controls in beam acceleration test, – Strategy to define and specify 'Emitted Radiation', (Radiation that may result in increased cryogenic-load and usable gradient limitations), – Strategy for tuning and control, including feedback, control of ‘Lorentz force detuning’, tolerances and availability margin, – Impact on other accelerator systems: CFS, HLRF, LLRF, Cryogenics, and overall costs , A. Yamamoto16SCRF WebEx Meeting

Next SCRF WebEx June , A. Yamamoto17SCRF WebEx Meeting

2010 TLCC timeline PAC Review – May (Valencia) – November (Eugene) Assignment of LoI and MDI contact persons Wednesday Webex meetings – (all or part) – SRF, CFS, AS, AD&I – preparation for Baseline Workshops ECFA LC Workshop - together with CLIC team (Geneva) Baseline Workshops – September 7-10, 2010 (KEK) – January 18-21, 2011 (SLAC) – Each Workshop is to culminate in a document, to be submitted to the Project Director – Requires Preparation / discussion in advance , A. Yamamoto SCRF WebEx Meeting 18

Industrialization Models Global Vendors/Consortiums/Laboratories –Research Instruments (ACCEL) and Zanon in Europe –AES, Niowave/Roark, and PAVAC in Americas –MHI, (Hitachi, Toshiba, and others ) in Asia , A. Yamamoto SCRF WebEx Meeting 19 Production Models and Rate of SCRF Cavities Project # of Cavities assumed # of Vendors Production period (years) Production Rate: (Cavities/day/vendor) (at 200 ~ 250 work-days/yr) SNS~ 110 (including +20%) ~0.15 XFEL(~640)(1) (2) (3) (1.1 ~ 0.85) (0.55 ~ 0.43) ILC(~ 18,000) (including +10%) (1) (3) (6) (5) (18 ~ 14.4) (6 ~ 4.8) (3 ~ 2.4)