Energy Networks Association Flow Weighted Average Calorific Value Options Biomethane Campaign Working Group 7 th August 2014 The Voice of the Networks.

Slides:



Advertisements
Similar presentations
Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Use of commingling to avoid propane addition at biomethane injection points  Objective of the measurement regime for CV  Protect downstream customers.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Anaerobic Digestion and Biogas Association Gas to Grid Issues.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
Data Logger/ Daily Meter Reading Processes. New Daily Metered Site  DM Service Provider receives a request from Gas Shipper for installation of daily.
Orifice Plate Meter Error Stuart Gibbons, Extraordinary Offtake Arrangements Workstream Meeting: 16 October 2009.
Accuracy of CV determination systems for calculation of FWACV Dave Lander.
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
Project Nexus Workgroup Unique Sites 4 th November 2014.
Advanced Metering Infrastructure
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
1 Packaging bio- methane connections for the future Dan Anderson CEng 11 th January 2012.
Ofgem Review Group on Energy Market Issues for Biomethane Projects (EMIB) Gas Quality Analysis at Biomethane Entry REA Biogas Group the voice of the UK.
Accuracy of CV determination systems for calculation of FWACV Dave Lander Update 12 th October 2011.
Didcot Biomethane to Grid project Learning Points SGN and CNG Services Ltd (CSL)
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Crew Data Collection Requirements and Feasibility Results Alaska Department of Fish and Game And Wostmann & Associates, Inc. 1.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Distribution Network Interruption - Initialisation 28 September 2010.
1 Transmission Work Group 1 st November 2012 Gas Security of Supply SCR Proposals Credit Implications for GB Gas Market EBCC Response Summary Mark Cockayne.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PART3 Data collection methodology and NM paradigms 1.
Presentation to DCMF Profiling and Settlement Review Group John Lucas 3 August 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
© Energy UK April 2012 Modification 435 Workgroup Alternative approaches to NDM Compensation 19 February 2013
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Background Current balance of LDZ System and Customer charges
Wales & West Utilities Entry – Standard Special Condition D12
UNC Modification Proposal 0202 National Grid Distribution
Transmission Workstream 4th July 2007
Data collection methodology and NM paradigms
UNC Review Group 0251 Metering Issue for Consideration
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Incentives 26 September 2018.
Change Management Committee – June 2019 Update
Modification th July 2008.
Change Management Committee – June 2019 Update
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
PROJECT NEXUS FUNDING – THE CUSTOMER’S VIEW
Connected System Exit Points - Update
Richard Fairholme Transmission Workstream 4th September 2008
Reinstatement of NTS Interruption
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Transmission Workstream 6th November 2008
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
xoserve Services XOSERVE SCOPE Sites Register Maintenance Shipper
Enabling Large Scale Utilisation of Class 3
Customer Issue Management Dashboard CoMC - July 2019
Presentation transcript:

Energy Networks Association Flow Weighted Average Calorific Value Options Biomethane Campaign Working Group 7 th August 2014 The Voice of the Networks

2 Current Arrangements BEU RTUDNCC GNCC ΣFWAC “Energy management team” (manage the FWACV process) GCoTE GSMR Only volume volume CV + vol separate due to the limitations on historical protocol (modbus) CV DD Meter Controller 2551 FCFC PC DANINTHPMIS EOD File Approved device - LoA Meter not under LoA but interpretation of TER is requisite (% accuracy) DANINT interfaces with CV DD and meter to collect data Approved software under LoA DATA XOSERVE CV volume CalibrationGases

3 The Voice of the Networks Propose that sites less than a specified threshold input (10,000 scmh) are not directed sites NEA specifies CV device accuracy and calibration – managed in the same manner as GS(M)R Removes the requirement for Approved devices and software Agree accuracy class of CV measurement device and calibration regime – could ENA lead on defining this? Customer still propanates to meet FWACV value supplied by DN (and if CV is too low, no flow allowed) Low Flow Sites Not Directed RTU DNCC Customer PLC CV DD Meter This option reduces costs, complexity and is simple to implement Will also facilitate new entrants and innovation in the Grid Entry Unit market Customers are protected as FWACV is targeted by the Operator – governed by NEA with Ofgem oversight GNCC CV and volume follows identical route managed by Customers ‘Flow Computer

4 The Voice of the Networks GCoTE would require that an approved software is still used GCoTE also stipulate that the calculations must be carried out on site Subject to agreement to amend GCoTE would still require reconciliation at DNCC CVDD is still approved device so would need daily and 35-day test – this is a Gas Act requirement so harder to change Modified Direction RTU DNCC Customer PLC CV DD Meter Significant effort and complexity developing alternative process and infrastructure for minimal benefit Requirements for 35 day test and calibration remain along with Network Capping implications Exactly same local consumer impact as the “Not Directed” option but would incur higher costs DANINT or Equivalent Calibration Gases Approved device - LoA GNCC Approved software - LoA