Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
POWERLINKS TRANSMISSION LIMITED a joint venture of TATA POWER &POWERGRID.
Acceptance Of Deposits.  “Deposit” includes any receipt of money: a) by way of deposit or a) loan or a) in any other form.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
Financial Requirements of a New Enterprise
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Selection of Consultancy Services
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
Washington Metropolitan Area District Office SBA.
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
PROCUREMENT PLAN States should prepare Procurement Plan for the entire outlay approved by the PAB for the State Component and all the Districts. The Procurement.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
U.S. Small Business Administration
ACTION PLAN LIN ASSISTANT ENGINEER KUNMING-CHINA.
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
January 17, New Delhi. Contents  Background  Project Highlight  Power Allocation  Project Location  Gas Supply Network of ONGC.
Development and Application of Potentially Important Jute Geo-textiles (CFC/IJSG/21) Bangladesh Part Project Overview on the Progress & Achievements in.
Modernisation of signalling system (2001/LV/16/P/PT/006) Stage 1 Intermediate Body: Ministry of Transport Employer: Latvian Railway - LDZ Contractor: Consortium.
Main Achievements in Public Procurement in Ministry of Finance of the Republic of Moldova Public Procurement Agency Batumi, 2015.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
A WORKSHOP ON FINANCIAL MANAGEMENT IN HYDROLOGY PROJECT – PHASE-II Gujarat Water Resources Development Corporation Ltd. GWRDCGANDHINAGAR (GW Component.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
December 16, New Delhi. Contents  Background  Project Highlight  Power Allocation  Project Location  Gas Supply Network of.
Specification & Quantities Estimating
September Elements of success behind CASA-1000.
Doing business in Libya Law n°5 for Promotion of Investment of Foreign Capital November 2008 Aberdeen - London Libyan British Business Council.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Energy for the Future Belene Nuclear Power Plant Project Status.
Mr. Thilak de Silva. BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA) M.Sc. in IT - Year 1 Semester II
1 Presentation on Kaladan Multimodal Transit Transport Project (Port & IWT component) 23 rd February 2011.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
1. Sittwe Ch. 0.0 km Paletwa Ch. 158 Km Kaletwa (Ch 225 km Myeikwa (IM Border) Kyauktaw Bay of Bengal KolkataSittwe539 km SittwePaletwa158 km PaletwaKaletwa.
ABDUL RASHID MBAECM, MBA, MIS, CHRM, BA, DIP PRESIDENT PHONE ANTIQUA ROAD, MISSISSAUGA L5B 2T8 ONTARIO, CANADA.
MINING AND INFRASTRUCTURE INDABA 2015 ZPC PRESENTATION Presented by: N.F. Gwariro (MD)
Land Code Update M’Chigeeng First Nation July 14, 2015.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Important points regarding the Filling New forms AOC-4 (earlier 23AC/23ACA) and MGT-7 (earlier 20B) are introduced for annual filings. Board Report shall.
Joint Procurement of medical countermeasures EMCDDA Workshop Lisbon, 16 june 2015.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
State IT Agency Briefing on Annual Report 2014/15 to Parliamentary Portfolio Committee on Telecommunications and Postal Services 16 October 2015.
DEPARTMENT: LAND AFFAIRS Department of Land Affairs Presentation to the Joint Budget Committee on Departmental Expenditure for the Financial Year 2007/08.
1 Hospital Revitalization Grant Performance Report: Free State.
City Paper Md. Mukul Miah MIS & Monitoring Officer Bangladesh Municipal Development Fund (BMDF) Presented by
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
BUSINESS DEVELOPMENT PACKAGE Designed for Foreign Contractors, Consultants & Suppliers Specifically for Iran Infrastructural Projects 1.
Lecture 35 Income from Business. Deductions---Special Provisions Initial Allowance (Sec. 23) A person who places an eligible depreciable asset into service.
Transitional Provisions and guidance to form filing
Introductory presentation for schools
North West provincial Treasury presentation on Conditional Grants and Capital Expenditure as at 30 June 2008.
9/18/2018 Bids CONTRACTING Khamis…..
City:- Corporation of City of Panaji
Pre-contract Planning and Practice
Eagle Programme : 4 Box Summary
Liquefied Natural Gas Terminal in Lithuania
Delta Water Supply Project
IT Managed Services Transition Weekly Activity Report: June 11th, 2019
IT Managed Services Transition Weekly Activity Report: May 28th, 2019
IT Managed Services Transition Weekly Activity Report: May 14th, 2019
IT Managed Services Transition Weekly Activity Report: May 21st, 2019
Funder Preferred Risk Allocation
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul Gani Road, Dhaka-1000, Bangladesh PROGRESS REPORT-APR' X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT FOR THE MONTH OF APRIL’ 2014

2X660 MW MAITREE SUPER THERMAL POWER PROJECT SNDescriptionPage No Remarks 1Management Summary Progress Report  Corporate Activities3  Site Activities4  Financial Progress5 2Status of Critical Inputs6 3Pending Critical Approval7 4Major Initiatives taken during this Month8 5Sch.of Activities planned for next 6 months9 6Progress Photographs PROGRESS REPORT-APR'20142 INDEX

2X660 MW MAITREE SUPER THERMAL POWER PROJECT Appointment of Owner’s Engineer: Appointment of M/S Fichtner GmbH as Owner’s Engineer has been approved in 8 th Board Meeting. Notification of Award issued on 24 th April Appointment of Coal Consultant : Pre-proposal meeting held on 10 th April ‘14. Environment Management: 1 st Quarterly monitoring of Environment parameters done by M/S CEGIS. Report expected in 2 nd week of May PROGRESS REPORT-APR' Management Summary Highlights – Progress: Corporate Activities Boundary wall, Slope protection & Additional area filling: Negotiation held with M/S BDPL. Contract Finalized. Notification of Award issued. Pre-fabricated Site Office : Technical specification Finalized. Substation Package: Bid opening on 15 th May’14. Consultancy for Gate Complex: Contract is at finalizing stage.

2X660 MW MAITREE SUPER THERMAL POWER PROJECT Pontoon Jetty foundation protection wall made. Pontoon stair erected. 33/11 KV Line 200 KVA both the transformers erected. Cable laying completed. Site filling work completed. Micro-leveling & compaction in progress. Earthen dyke preparation in progress, for slope protection m/ 5400 m completed. Main Plant Fencing work in progress PROGRESS REPORT-APR' Highlights - Progress : Site Activities

2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT-APR' Financial Progress (FY ) DescriptionAmount in BDTRemarks Cumulative Expenditure during Jul’13 – Mar’14 70,66,12,820Major expenditure on account of Site filling(6200 L.), Rest House/Helipad /Road etc (3 00L.), procurement of Jeep(70 L), Porta Cabin(48L), DG set(20L), Pontoon(40L), Site leveling (2113 L), Environment Monitoring (44L) Expenditure during Apr’14 57,40,111Major expenditure on account of WZPDCL security deposit (34 L) Cumulative Expenditure during FY ,23,52,931 Value of Work/Purchase Order placed in Mar’14 1,57,5201 Work/Purchase Order placed in Apr’14

2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT-APR'20146 Status of Critical Inputs Sl. No Required inputAnticipated dateRemarks 1a) Startup power b) Power evacuation system Meeting held with Secretary (Power) & PGCB. Joint.Secy (Dev) stressed finance source finalization 2Access road (6.0 km long) May ‘16 (critical) Govt. approval already available. Meeting held with LGED for expediting the Design activities & Award of Contract. 3.Cap. dredging: a) Mongla port to outer bar. b)Port to project June 2014 March 2016 Meeting held with Chairman, Mongla Port Authority on 24 th April 2014, regarding the scope of service & preparation of DPP.

2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT-APR'20147 Pending Critical Approvals IssueStatus  SEC Approval  For raising Capital Exceeding BDT 10 Crs.  For not Listing in Stock Exchange Approval given by SEC for raising initial capital (BDT 16 Cr.). We have to apply separately for additional capital induction, as per requirement. SEC will accord approval separately.  Coal Sourcing, Supply & Transport Agreement Nine (09) consultants shortlisted for Coal Consultancy. Pre-Bid conference held on 10 th April,  Land Lease agreementDraft agreement is under finalization. Being reviewed by NTPC & BPDB. Finalization of land lease agreement anticipated by Mid May’14.

2X660 MW MAITREE SUPER THERMAL POWER PROJECT Owner’s Engineer : Negotiation held and Notification of Award issued. Pre-Proposal meeting held for Coal Consultancy. Meeting held with Chairman, Mongla Port Authority regarding the scope of service & preparation of DPP for Capital Dredging PROGRESS REPORT-APR' Major Initiatives taken during this month Tax consultant engaged. Meeting held with HSBC Bank regarding appointment of Finance Consultant cum Arranger. Notification of Award issued to BDPL for “Boundary wall, Slope protection, preparation of Earthen Dyke & Additional Land Filling.

2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT-APR'20149 Schedule of activities Planned for next six months SNActivityTarget 1Signing of Agreement with Owner’s EngineerMay’14 2Bid opening for Coal ConsultancyMay’14 3Issue of NOA for Boundary Wall, Slope ProtectionMay’14 4Showcasing of project with ECA agencies and Equipment Suppliers Apr-May’14 5EPC Tender Document FinalizationJul’14 6EPC Tender Enquiry FloatingAug’14 7Appointment of Coal ConsultantAug’14 8Bid opening of EPC PackageOct’14

Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul Gani Road, Dhaka-1000, Bangladesh PROGRESS REPORT-APR' Main Plant Fencing work in Progress

BANGLADESH- INDIA FRIENDSHIP POWER COMPANY (PVT.) LTD PROGRESS REPORT-APR' PARTNER IN PROGRESS