Physical Science Research: Geomorphological impact and fluvial system response to the Cumbria floods November 2009 Jeff Warburton, Danny Donoghue (Durham.

Slides:



Advertisements
Similar presentations
Erosion Erosion = the transport of sediments from weathering. *Gravity and Water are biggest factors* 1. Streams 2. Glaciers 3. Landslides 4. Waves.
Advertisements

Landforms of the Fluvial System
Geomorphic Context for Sediment Sources, Movement, and Deposition in the Bad River, Bad River Reservation, Wisconsin By Faith Fitzpatrick 1, Kirsten Cahow-Scholtes.
Management of future floods at Cockermouth LO: To be able to explain how a specific riverine area has been managed.
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012.
Chapter 9 Water Erosion and Deposition
HYDROLOGIC CYCLE Precipitation Runoff or infiltration(groundwater flow and plant uptake) Flow to and/or gather in basin Evapotranspiration into air Condensation.
Gravel Mining Ryan Kindt Kristina Lowthian CIVE 717 April 9, 2012 Gualala River, California fly-over, Courtesy: Jamie Hall.
STREAM SEDIMENT SAMPLING
Section 3: Stream Deposition
River Studies. Outline of Events During your river field work you will be visiting two different sites in the lower course of the river. At each site.
Objectives Describe how surface water can move weathered materials.
Rivers are formed by erosion due to Running Water.
By the end of the lesson I should know:
John M. Buffington Research Geomorphologist US Forest Service Rocky Mountain Research Station Boise, Idaho, USA PNAMP Protocol Comparison Meeting February.
Stream Classification
Harry Williams, Earth Science1 Streams and Rivers. Of all the agents of erosion, rivers are the most important, because they are the most common and widespread.
Chapter 11 Rivers & Groundwater.
CHARACTER OF RIVER CHANNELS
U.S. EPA: NCEA/Global Change Research Program Jim Pizzuto and students University of Delaware Changing Climate and Land Use in the Mid-Atlantic: Modeling.
1 River Processes and Morphology A Case Study of the Souteyran valley.
Nisqually River 2009 Source to Sink
Overview of Exercise Module 1 – Geologic Setting Module 2 – Flow Regimes Module 3 – Downstream Effects.
1D SEDIMENT TRANSPORT MORPHODYNAMICS with applications to RIVERS AND TURBIDITY CURRENTS © Gary Parker November, CHAPTER 15: EXTENSION OF 1D MODEL.
Biological Objectives Tied to Physical Processes Dr. William Trush Scott McBain Arcata, CA.
Short Course on Gullies and Streams Tom Millard, Vancouver Forest Region.
Surface Water: Rivers.
Materials Transport & NSCD Material Classes Velocity to Transport Relationships York NSCD Restoration PSY CCREP.
Step 1: Assess Riparian Resource Function Using PFC §1d. Complete PFC assessment l 17 questions about attributes and processes l Reminder – PFC based on:
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
What are the forces of erosion and deposition that
Basic Hydrology Water Quality: Sediment production and transport.
Basic Hydraulics: Solids Transport. What is sediment? Matter that settles to the bottom of a liquid Matter transported by water or wind May be particles.
Streams (Rivers). Runoff: H 2 0 that does not sink into ground Most ends up in streams.
Hydrosphere Water of the Earth!! Water Cycle.
River Systems Earth Space Science Mr. Coyle. The Hydrologic Cycle Infiltration = Groundwater System Runoff = Surface Water System Runoff = Precipitation.
Sensitivity analysis of hydraulic model to morphological changes and changes in flood inundation extent J.S. Wong 1, J. Freer 1, P.D. Bates 1, & D.A. Sear.
Rivers: Fluvial Processes
Stream Erosion and Transport
Landform Geography Landforms of the Fluvial System.
Hyporheic Zone- area where stream water and ground water intermix.
Hydrologic Hazards at the Earth’s Surface
 These two agents: erosion and deposition are the most important agents that affect weathered materials.  Erosion involves the physical removal of weathered.
Habitat Mapping of High Level Indicators at Multiple Scales for Fish and Wildlife.
How do rivers change downstream? (the long (river) profile)
Describe the features and characteristics of the Three Gorges Dam.
Rivers and Streams. River Systems A river or stream: any body of water flowing downhill in a well defined channel A river or stream: any body of water.
A Sediment Budget for Two Reaches of Alameda Creek (1900s through 2006) Paul Bigelow, Sarah Pearce, Lester McKee, and Alicia Gilbreath.
Section 3: Stream Deposition
River Systems. Objective  Students will describe factors that affect the erosive ability of a river and the evolution of a river system.
Natural and artificial hydromorphological changes in Norway Agnès Moquet-Stenback – Section for erosion and sediment transport – Hydrology.
PCWA Study Plan Physical Habitat Characterization Study Plan –Geomorphology Study Plan –Riparian Habitat Mapping Study Plan –Aquatic Habitat Characterization.
Journal #5 What is a flood? Why are floods harmful? What can humans do to prevent floods?
(,rivers, brooks, creeks, etc.)
November Average annual rainfall is about 2,000 millimetres, reported by the met office Cumbria is a region in North-East England The region has.
Interactions class Getting and understanding watershed flux data
Estimating Annual Sediment Yield and a Sediment Delivery Ratio for Red Creek, Utah and Wyoming Paul Grams Department of Geography and Earth Resources.
Earth Surface Oblate Spheroid = Largest Topo Feature of Earth
Basic Hydraulics: Solids Transport
Morphodynamic and Sediment Tracers in One-Dimension
4 channel types defined at reach scale, based on 3 features
Erosion and Deposition
4 channel types defined at reach scale, based on 3 features
Chapter 9 Water Erosion and Deposition
Mass wasting: Rock falls and talus
Stream Classification
Stream Erosion.
Streams Hydrodynamics
River Systems Chapter 15.
Erosion and Deposition
Presentation transcript:

Physical Science Research: Geomorphological impact and fluvial system response to the Cumbria floods November 2009 Jeff Warburton, Danny Donoghue (Durham University) Andy Large, Andy Russell (Newcastle University) Stuart Dunning (Northumbria University) Structure: Background Current Research Upland impacts Lowland impacts Mapping Change Challenges

Background: Recent upland flood events Shetland, Scotland September 2003 North York Moors, England June 2005 Northern England January 2005 Northern England October 2008

Valley erosion and deposits Flood extent image, 23 June 2005 Rollei ARSF NERC digital camera

From: Watkins and Whyte (2008) – ‘updated’ Cumbria floods – ‘flood rich’ periods

Ouse Bridge - Largest flood on ‘record’

Dissection & Gullying Mass Movements & debris flows Sheet & Wash Erosion Suspended Load Wind Erosion Slope Deposits Stream Course & Bank Erosion Pipe erosion Scar & Peat Margin Erosion Bedload Channel Sediments Lakes & Reservoirs HILLSLOPE CHANNEL Streambank Solute & Flotation Load storage process Background – contemporary sediment budgets UPLANDUPLAND LOWLANDLOWLAND

Objectives: 1.Structured field inventory of the geomorphic impact on the River Derwent river corridor 2.Provide a rapid geomorphic assessment of the role of scour and sedimentation in the river 3.Identify areas of risk for remobilisation of flood-deposited sediments; delivery of hillslope sediments and hotspots of erosion 4.Compare post-flood field-derived data with pre-existing surveys to quantify/ areas of greatest geomorphic change 5.Work with stakeholders in designating catchment zones that are ‘at risk’ from erosion and sedimentation Aim: to examine flood impacts the whole river corridor of the river Derwent from the headwaters, through Bassenthwaite Lake to the Lowland agricultural/urban catchment

Scale of river and catchment management (Newson, 1992)

1.Survey headwater impacts - Coledale, Newlands and Borrowdale areas 2.Bassenthwaite Lake - collect a series of short cores and grab samples from the Lake and compared with a survey undertaken in Lowland channel change in the floodplain downstream of Bassenthwaite Lake - focussing on ‘typical’ reaches e.g. Isel and Camerton. 4.Support field survey with low-level high- resolution aerial surveys carried out using a UAV (Unmanned Aerial Vehicle) - provide rapid repeat, high resolution aerial imagery and Digital Elevation models of key sites (cf. larger scale ARSF and EA remote sensing data). Plan of Research:

Upland Impacts Seathwaite, Borrowdale 2009

Coledale, 2009

Goldscope Valley, Northern Lake District 2009

Mapping elements Source area 1 Runout Source area 2 Runout Debris fan

Map and sediment budget Landslide erosion 518 m 3 Deposition 400 m 3 Sediment loss 118 m 3

Completed inventory of erosion / deposition Coledale flood 2008 Shallow landslide Landslide deposition Surface wash Sediment deposition Stream erosion Stream deposition Dam pond deposition Debris flow Slope undercutting Fan deposition Torrent erosion

Channel erosion Debris flows Landslides Slope undercutting Footpath wash Delivery to main fluvial system Channel deposition Debris flow fans Landslide deposits Slope wash deposit Summary sediment budget (Coledale, 2008) Values in t %

Bassenthwaite Lake Coring and Sampling

Ouse Bridge & Herdwick Croft Lowland Impacts

Ouse Bridge Gauging Station

Ouse Bridge

Isel Church

Sediment supply: landslides

Sediment supply: erosion of coarse gravel sediment

‘Hidden’ scour of river bed

New gravel bar: Downstream of Isel Hall

Downstream of A595 Bridge below Cockermouth

Flood debris

Sediment supply: localised scour around trees

Camerton

Sediment supply: erosion of river deposits

Sediment supply: localised bridge pier scour

Localised gouging and scour of cohesive flood plain sediment

Ground survey: ‘Reach-based’ assessments

Mapping flood limits

Mapping change – Airborne Remote Sensing

Downstream impacts - Workington

Papcastle

Future challenges / research problems? 1.Assembling an evidence base a)Determining the sources of catchment sediment and linkages b)Assessing the role of lakes in flood routing and timing c)Investigate the impact of gravel management on flood impact 2.Determining whether current problems are ‘natural’ or human-driven 3.Recognising flood impacts are space and time specific 4.Establishing the ‘whole catchment’ context 5.Turning case studies into policy - impact