Nov. 28, 2012 PIP-University Collaboration1 We have been asked to identify areas of PIP and other accelerator projects that could benefit from collaboration.

Slides:



Advertisements
Similar presentations
Heat Pipe Final Industrial Training Presentation
Advertisements

MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
The process of finding and hiring the best- qualified candidate (from within or outside of an organization) for a job opening, in a timely and cost effective.
Life After High School What are my options?. Options after High School I know that you have just finished your course selection, but it is still an important.
Applying for a job in Game Main Menu 2 - Products 3 - History 4 - Job description 5 - Hours and pay 1 - About the company 6 - CV 7- Cover letter 9 -
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Proton Improvement Plan (FY12 PMG Q4). William Pellico, Fermilab PMG,October FY12 Summary Q4 Task(s) Summary – Highlights RFQ Injector Budget.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 11/04/2013.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
ComPASS Summary, Budgets & Discussion Panagiotis Spentzouris, Fermilab ComPASS PI.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
Tapping into Available Personnel Resources. What Do We Mean by Available Personnel Resources? People who are already doing, or could do, the job you want.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Mechanical engineering NSERC USRA 2015 Application Deadline: March 11, :00 pm (this is earlier than Career Services says because we must process.
Seungyu Rah (Pohang Accelerator Laboratory, POSTECH, Korea) Nov
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
V. Paramonov, on behalf INR team.
ICE SECTION The coolest place to be! Elias Métral
Complementary ISTC Projects #3888, 3889p
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Presentation transcript:

Nov. 28, 2012 PIP-University Collaboration1 We have been asked to identify areas of PIP and other accelerator projects that could benefit from collaboration with universities  This was initially a response to PIP FY13 cuts  Easiest way is to just transfer a whole lot of money  This has now been extended to all Proton Source and MI/RR – not PIP exclusive Three types of assistance are under consideration:  Machining, technical, academic Goals:  Save money  Finish earlier  Do more What this program will not do:  We will not ship lab money to universities to pay for people which would otherwise employ Fermilab people  While we may pay for shop work, it will only be done if there is a cost advantage and our shops continue to be busy

Nov. 28, 2012 PIP-University Collaboration2 Model Previous model – mid ‘00s  One liaison on lab side (Prebys) Projects in Linac, Booster, Main Injector  One liaison on experimental side (Michael) Activity form MINOS & MiniBooNE institutions Model for this process still being developed  We are generating a list of projects now – need your help  2 nd floor will have a meeting with experiment spokespersons and advertise the list Need there to be mutual benefit  PIP: Inexpensive machining and technical/academic help  Universities: business for their shops, topics for students and technicians

Nov. 28, 2012 PIP-University Collaboration3 Types of Work Machining  University shops are available at low- or no-cost  This work would displace work that would otherwise be done at our shops or farmed outside As long as our shops stay fully subscribed Technical  Some universities have full-time technicians on staff They may be willing to send these people to Fermilab (at no cost) full-time for extended periods of time  This work would accelerate jobs where we are short-handed Academic  Universities have offered graduate students or postdocs for extended periods at half- or full-time effort  These jobs can be of a wide variety – need not to be specifically scientific Universities view this as a way to get hardware experience for their students Jobs can be operational, scientific, technical, etc. Ultimately, their scientific interest is getting more protons to their experiments

Nov. 28, 2012 PIP-University Collaboration4 Examples - Machining Basic – support stands, racks Precise, but straightforward – CNC machining to good drawings (cone castings), waveguides Detailed work: cavities, magnets, vacuum systems Anything that may have been farmed out to an outside shop should be open game

Nov. 28, 2012 PIP-University Collaboration5 Examples - Technical Simple jobs that require some quality: stuffing boards, making cables Assisting on complicated projects: cavity refurbishment, tuner refurbishment

Nov. 28, 2012 PIP-University Collaboration6 Examples - Academic Physics projects: optics, simulations, laser-notchers, dampers Operations projects: tuning, commissioning, optimization Instrumentation/hardware: cavity monitoring, application development, Pie-in-the-sky: AI tuning, speculative instrumentation

Nov. 28, 2012 PIP-University Collaboration7 Summary We will proceed with this collaboration effort to help PIP (proton delivery)  Help: Machining, Technical, Academic  Goals: Save $, do earlier, do more Immediate task is developing a comprehensive list of projects  Need help from everyone – I would like to hear from all L4 managers, even if it is to say they have no topics  Projects can arise as time goes ahead  Info needed: description, type of effort, discussion of resources or effort We expect interaction with the experiments in December  Some machining projects could start immediately if there are burning needs  Other items would likely start next year