1. KEY FEATURES VESSEL IS OCCUPIED WITH FULLY AUTOMATIC SYSTEM IN SUCH A WAY THAT 4 CREW CAN OPERATE THE VESSEL MANEUVERING AND CARGO LOADING/DISCHARGING.

Slides:



Advertisements
Similar presentations
Inspected in port Shanghai from 26th to 28th Sept by NCL
Advertisements

2.3 Waste Management – Revised IBTS
INTERTANKO,ATHENS 13th April
Preferred Utilities Manufacturing Corp.
M/t SVEVA 17 April 2015www.mediterraneanav.it. 17 April 2015www.mediterraneanav.it.
Hydraulics hy·drau·lics [h drólliks ] noun study of fluids:  the study of water or other fluids at rest or in motion, especially with respect to engineering.
Morgan City Rentals Diesel Jet Pump 6 x 6 Peerless Safe Operating Practices and Procedures.
PISTON ENGINES Part 1 Introduction.
Ship Profiles.
CAFS On-Line Orientation
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
ALOKRAJ. V - NA07B004. General  All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
Crane Operations Objective
THRUSTMASTER HOUSTON, TX Largest Thruster Factory In the World
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
The 30M2 Continuous Miner. Customer Name 30M2 Overview %Heavy duty high power miner for mid-height seams %High productivity from efficient cutting and.
Presentation Technology ORC GREEN MACHINE
Prepared by September 10, 2014 Breakthroughs in Smart Technology for Sea Water Cooling Five Keys to Greater Savings.
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Sea Water Scrubber. INTRODUCTION Crystallox has developed a new generation of horizontal and vertical scrubbers for marine and land based applications.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Engine Information & Engine Components and Systems.
Machinery and other class surveys
Lesson 17 KEEPING WATCH. WATCHKEEPING 4 STCW 1978 (1995) 4 Watch (1) time period; (2) personnel 4 Personnel: Engineer officer in charge (watchstanding.
Shipping Agenda Part 1. Introduction, Nomenclature, Major shipping companies Part 2. Charter - Voyage, time and others Part 3. Deck maintenance Part. Engine.
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
 2009 Watch keeping principle Watch keeping principle- Simple mistakes leads to serious damages.
M/t COSMO 5 October 2015www.mediterraneanav.it. 5 October 2015www.mediterraneanav.it.
非常感谢中国海事界同事对我们支持 A Guide to The Vetting Process We thank All our Colleagues in the Maritime Industry in China for their Support Capt Howard Snaith – Marine.
Stratos ECO Training ECM “Smart” Circulators for Heating, DHW Recirculation Systems Presentation Date – New Jan 2008 ECO 16 FECO 16 FX ECO 16 BFX Stratos.
Positive Displacement Pumps.
INTERTANKO Technical Seminar Mumbai 19 th September 2005 Ship Inspections & The Screening Process Capt Howard N. Snaith. Master Mariner. M.N.I. Director,
SUBJECT CODE NAME OF SUBJECT TOPIC :::::: FLUID POWER ENGINEERING CENTRIFUGAL PUMP Parul Institute of Engineering & Technology.
HYDRAULIC MOTORS.
Parul Institute of Engineering & Technology Subject Code : Name Of Subject : Fluid Power Engineering Name of Unit : Pumps Topic : Reciprocating.
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
BOAT Regulatory Gross Tonnage – 199 Registered Length – 96’7” Registered Breadth – 29’ Registered Depth - 13’3” Draft – 14’ 6” Air Draft – 46’
Red/Green Fire Fighting Systems Fi Fi Mains ●Red System: Port Side Fire Main supplies two Monitors. M7 (6000) gpm on centerline on the fwd Wheelhouse top.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
Large Tonnage Chiller AC Screw. Content Mechanical System Key Components Control Logic Application 2.
Fire/General Service/Ballast Pumping Systems
Bilge Pumping Systems General Locations.
MOTORS PUMPS GEARBOXES VALVES CONTROLS NAHI, LLC - MAIN OFFICE : PROVIDING CUSTOMER DRIVEN SOLUTIONS - LOW SPEED, HIGH TORQUE MOTORS Made.
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
Engine Speed Amps Engine Temp. Engine Oil Pr. Trans. Fluid Pr. Battery overheat Engine overheat Exhaust hose overheatExhaust overheat Low oil pressure.
Innovation quality reliability Komara 7 Skimmer System (Formally Komara Mini) December 2015.
Company Presentation 2016 A short introduction to I&C Services BV.
These ships are striking and quite intriguing; inspired by and designed to resemble the turn of the century coastal vessels that used to ply the east.
(Formally Kormara Midi)
FLUID POWER CONTROL ME604C. FLUID POWER MODULE:02 ~ HYDRAULIC SYSTEM COMPONENTS.
18 MW TURBINE CONTROL PANEL
Company Presentation 2016 A short introduction to I&C Services BV.
VACTOR COMBO FAN | jjei.com CHASSIS BODY BODY
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
MEDITERRANEA DI NAVIGAZIONE SPA
MEDITERRANEA DI NAVIGAZIONE SPA
HIGH PERFORMANCE PRESSURE SYSTEMS.
REPORT IN AUX MAC PAQUIBOL, MARK ANGELO B. ME31-A1 ENGR. ALMOJUELA.
Subsea 100 Global Services Products Presentation
EXCALIBUR 4500 m3 Ethylene Carrier
MEDITERRANEA DI NAVIGAZIONE SPA
KING ARTHUR 4500 m3 Ethylene Carrier 02/12/2018.
M/t SVEVA 7 December December 2018.
CONSTANTA MARITIME UNIVERSITY FACULTY OF MARINE ENGINEERING Engineering programmed: Marine Engineering (Bachelor’s Degree) THE STUDY OF BALLAST SYSTEM.
M/t COSMO 4 February 2019.
Firefighting equipment
Presentation transcript:

1

KEY FEATURES VESSEL IS OCCUPIED WITH FULLY AUTOMATIC SYSTEM IN SUCH A WAY THAT 4 CREW CAN OPERATE THE VESSEL MANEUVERING AND CARGO LOADING/DISCHARGING. MANEUVERING – MTCS ( MULTI THRUSTER CONTROL SYSTEM) IS AVAILABLE FOR EASY MANEUVERING AS 2 MAIN AZIMUTH THRUSTER AND 1 SALLOW DRAFT THRUSTER ARE CONTROLLED SIMULATANEOUSLY BY SINGLE JOY STICK CONTROL. VOYAGE – BOTH AZIMUTH THRUSTER ARE OPERATED INDEPENDENTLY FROM CONTROL LOCATED IN WHEEL HOUSE PANEL. IN ADDITION BOTH THE THRUSTER CAN BE SYNCHRONIZED AND CAN BE OPERATED FROM A SINGLE JOY STICK. ALL PUMPS, CARGO & BALLAST SYSTEM VALVES, HOSE HANDLING CRANE ALONG WITH ALL SHIP AUXILLARY EQUIPMENTS CAN BE CONTROLLED & MONITORED FROM BRIDGE CARGO CONSOLE DURING LOADING/DISCHARGING OPERATION OF CARGO. 2

SHIP PARTICULARS 1.LOA MTR 2.LBP71.15 MTR 3.B (M)13.50 MTR 4.D (M)7.30 MTR 5.DRAFT LOADED5.60 MTR 6.CREW CAPACITY10 PERSONS 7.HFO CAPACITY M3 8.MGO CAPACITY M3 9.DISPLACEMENT4750 TON 3 CLASSRINA (REGISTRO ITALIANO NAVALE) CLASS NOTATIONC  (Malta Cross) OIL TANKER, ENHANCE SURVEY PROGRAMME, FLASH POINT >60°C, UNRESTICTED SERVICES, CLEAN SEA, AUT-UMS, GREEN STAR, IN WATER SURVEY, CARGO CONTROL.

EQUIPMENT DETAILS 4 SR NOEQUIPMENTQTYTECHNICAL DETAILSSUPPLIER 1MAIN ENGINE21286 KW RPM, 16 CYLINDER V TYPE CATTERPILLAR 2SHAFT ALTERNATOR RPM, 380 V, 3 PHASE, 50 HZ MARELLI 3.AUX DG RPM, 380 V, 3 PHASE, 50 HZ MAN 4EMERGENCY/ HARBOUR DG RPM, 380 V, 3 PHASE, 50 HZ MAN 5AZIMUTH THRUSTER21200 KWHRP 6SHALLOW DRAFT THRUSTER, 360 DEG ROTATION 1350 KWHRP 7CLUTCH2MCD HDTWIN DISC 8AUTOMATION SYSTEMKDU 9TANK GUAGING & HIGH LEVEL MONITORING SYSTEM ARISTON NORWAY 10CARGO HOSE HANDLING CRANE 11.5 TONS, MAX RADIUS= 18 M (BOOM IN), MAX 20 (BOOM OUT) SEKWANG 11KNUCKLE BOOM CRANE ( PERSONEL HANDLING CRANE) 1300 KGSEKWANG

EQUIPMENT DETAILS SR NOEQUIPMENTQTYTECHNICAL DETAILSSUPPLIER 12ANCHOR WINDLASS2MAN- E/H/32-S/160-40/1IBERCISA 13FREE FALL LIFE BOAT119 PERSON CAPACITYJIANGYIN XINJIANG 14RESCUE BOAT16 PERSON CAPACITYJIANGYIN XINJIANG 15MOORING WINCH1IBERCISA 16CAPSTON1IBERCISA 17YOKOHOMA FENDER LAUNCHING DAVIT 4BHAWANI ENGINEERING WORKS 18THERMAL FLUID HEATER113 BAR PRESSURE, 350 DEG CAALBORG 19WATER MIST SYSTEM15 ZONE PUMP SKIDTYCO FIRE & SAFTEY 20GMDSS1 A3 AREASAILOR 21ECDIS1TRANSAS 22ARPA RADAR1RAYTHEON 5

GENERAL ARRANGEMENT PLAN 6

BLOCK DIVISION PLAN 7

CARGO PUMP DETAILS HFO PUMP :- 03 NOS MAKE:- BORNEMANN TYPE:- TWIN SCREW PUMPS CAPACITY :- 500 M 3 /HR DISCHARGE RATE OF HFO : M 3 /HR MGO :- 02 NOS MAKE:- KSB ITUR SPAIN CAPACITY:- 150 M 3 /HR DISCHARGE RATE OF MGO:- 300 M 3 /HR STRIPPING PUMP:- 01 NO MAKE:- BORNEMANN TYPE:- TWIN SCREW PUMPS CAPACITY:- 50 M3/HR 8

CARGO TANK DETAILS SR NOTANK DESCRIPTIONNO. OF TANKSCAPACITY (M3) 1HFO MGO BALLAST MANIFOLDS CARGO & BALLAST TANK HFO01 NO (P&S) MGO01 NO (P&S) STRIPPING01 NO (P&S)

CARGO TANK DETAILS TANK MONITORING SENSOR EACH CARGO TANK IS OCCUPIED WITH FOLOWING SENSOR 1. TANK RADAR. 2. TANK MAUNUAL SOUNDING 3. ULLAGE SOUNDING. 4. TEMPRATURE TRANSMITTOR. 5. HIGH & HIGH HIGH LEVEL ALARM. INSIDE EACH CARGO TANK INSPECTION GANGWAY IS PROVIDED. EACH TANK CONSITS OF MAIN 2 PIPE LINES ONE FOR FILLING AND ONE FOR STRIPPING. ALL THE VALVES FOR CARGO AND BALLAST ARE HYDRAULIC OPERATED FROM LOCAL(BY CONNECTING HAND PUMP WITH VALVE POSITION INDICATOR ON MAIN DECK) AND REMOTE (AUTOMATION SYSTEM). ALL CARGO AND BALLAST OPERATION CAN BE PERFORMED FROM BRIDGE (CARGO CONSOLE) AND ENGINE CONTROL ROOM. ALL THE SUCTION PIPE INSIDE CARGO TANKS ARE FITTED WITH ROSE BOXES. 10

CARGO TANK SENSOR INSTALLATION DETAILS 11

CARGO OPERATION PUMP OPERATION :- ALL THE PUMP OPERATION START/STOP CAN BE PERFORMED FROM LOCAL/CONTROL PANEL/ BRIDGE AUTOMATION PANELS. ALSO CARGO PUMPS CAN BE OPERATED SIMULATANOUSLY WITH SHIP LOAD. HOWEVER, FOR THIS SHAFT ALTERNATORS ARE REQUIRED WITH SYNCHRONIZING. 2 HFO PUMPS ARE VARIABLE SPEED AND 1 NO IS DUAL SPEED. 2 MGO PUMPS ARE DUAL SPEED. 1 NO OF STRIPPING PUMP. ALL PUMPS EMERGENCY STOPS LOCATED AT MANIFOLD, PUMP ROOM ENTRANCE, W/H, AND CONTROL ROOM. ODME (OIL DISCHARGE MONITORING EQUIPMENT) SYSTEM IS AVAILABLE. FOR AUTOMATIC BILGE OIL DISCHARGE TO OUTBOARD. BRIDGE CARGO CONSOLE :-.2 NOS OF SIMILAR MONITORS ARE AVAILABLE WITH 100% REDUNDANCY FOR CARGO OPERATION, & MONITORING OF SHIP EQUIPMENTS. PUMP SUCTION/ DISCHARGE PRESSURE AND BEARING TEMPRATURE DETAILS CAN BE MONITORED FROM AUTOMATION SYSTEM (BRIDGE CARGO CONSOLE & CONTROL ROOM). FLOW RATE CAN ALSO BE MONITORED FROM BRIDGE CARGO CONSOLE AND CONTROL ROOM. ALL CARGO & BALLAST TANKS LEVEL CAN BE MONITORED. VESSEL DRAFT IS ALSO MONITORED. CARGO HOSE HANDLING CRANE CAN BE OPERATED FROM BRIDGE CARGO CONSOLE WITH RADIO REMOTE. ( RANGE APPROX 70 MTR). ALL SHIP PUMPS, VENTILATION FANS, FIRE DAMPER CAN BE OPERATED. VALVES OPERATION :- ALL THE VALVES FOR CARGO AND BALLAST ARE HYDRAULIC OPERATED FROM LOCAL(BY CONNECTING HAND PUMP WITH VALVE POSITION INDICATOR ON MAIN DECK) AND REMOTE (AUTOMATION SYSTEM. ALL CARGO AND BALLAST OPERATION CAN BE PERFORMED FROM BRIDGE (CARGO CONSOLE) AND ENGINE CONTROL ROOM. ALL THE VALVES INSIDE TANKS ARE GATE VALVES. ALL VALVES INSIDE PUMP ROOM ARE BUTTERFLY TYPE. 12

PHOTO GALLERY 13

PHOTO GALLERY 14

15 HOSE HANDLING CRANE

MAIN DECK 16

17 BRIDGE LAYOUT

18 THANK YOU