SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.

Slides:



Advertisements
Similar presentations
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Advertisements

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS Update The NUV Gratings 18 October 2007 Last COS TIPS presentation: 21 December.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
(Almost) Everything You Need to Know About Preparing and Submitting Proposals to External AO’s Marc Postman On behalf of CMO, SMO, RMO and BRC April 28,
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Language(s) We plan to develop CALCOS using Python and C Another programming language?
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
Cosmic Origins Spectrograph Hubble Space Telescope James C. Green University of Colorado Cosmic Origins Spectrograph Instrument Design and Capabilities.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
TIPS Meeting 1.Observing Solar System Objects with JWST Ed Nelan 2.COS - Updates on COS DevelopmentKen Sembach 3.NICMOS StatusTommy Wiklind Next TIPS Meeting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review COS Lamp Lifetime Estimates for TAGFLASH Scenarios.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Outline of CALCOS Processing Steps and Keywords Reference Files Associations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA WFC3 and StarView
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline PDR File Structure Overview Charles D. (Tony) Keyes 7 December 2000.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
Segment 6: Provider Communication California ICD-10 Site Visit Training segments to assist the State of California with the ICD-10 Implementation June.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review July 2001.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
COS OPUS/HDA CDR Daryl Swade July 23, 2001Keywords and Associations Space Telescope Science Institute 1 of 14 Keywords and Associations.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
Cosmic Origins Spectrograph November 13, 2003 Page 1 “Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
COS FUV Flat Fields and Signal-to-Noise Characteristics
GLAST Large Area Telescope
WFC3 Pipeline Critical Design Review October 16, 2001
STScI Ground System Development Status:
Presentation transcript:

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 2 of 14 Synopsis Role: STScI supports COS science operations by leading development of “front-end” (operations) and “back-end” (OPUS/MAST/calibration) ground system. COS project is led by NISD, and presently consists of 8 people (5.15 FTE) drawn from NISD, SISD, and ESS. The project is on track (green) –most recent report: 19 June 2001

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 3 of 14 Health Chart SubprojectStaffin g ScheduleTechnical Instrument Development OK (g)ongoing (g) IDT/STScI MOU (g) FUV I & T CU/UCB (g) NUV Grating reflectivity (y) Commanding and RPS2 OK (g)ongoing (g) OP-01 (g) Alignment development (g) Pipeline and Calibration OK (g)ongoing (g) keyword development (g) pipeline design (g) CDRs (g)

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 4 of 14 Accomplishments SI News: –Flight detectors are available for both FUV and NUV that meet or exceed performance requirements –FUV flight spare detector integration continuing at UCB –backup door-opening mechanism repair and recovery plan implemented –NUV grating reflectivity below specification (continues yellow) G185M below spec; G225M can be used – lower resolution; vendor working G225M below spec; primary vendor evaluating fix; different vendor selected for mechanically-ruled alternate G285M OK G230L in fabrication; looks good

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 5 of 14 Accomplishments (cont.) STScI pipeline systems –OPUS/HDA and calcos CDRs: held at STScI on 23 and 24 July, respectively Formal review panel: STScI and IDT representation 12 Requests for Action (RFAs) submitted –All reviewed and Actionees assigned CDR presentations and RFA status at:

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 6 of 14 COS Pipeline CDR Review Panel Ray Kutina (STScI) – Chair Tom Brown (STScI) Ken Brownsberger (CU/IDT) Paul Goudfrooij (STScI) Richard Shaw (NOAO) Send mail to Review Panel:

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 7 of 14 COS Pipeline CDR Agenda IntroductionM. McGrath Data system SM4D. Swade COS File Structure OverviewT. Keyes COS Keywords & AssociationsD. Swade Science Data Processing J. Rose DADS ingest and distributionA. Farris On-the-Fly-Reprocessing (OTFR)M. Swam COS and StarViewN. Gaffney Thermal Vac supportR. Henry Coding EnvironmentP. Greenfield Coordination with IDTT. Keyes CALCOSP. Hodge Schedule & resources M. McGrath

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 8 of 14 Accomplishments (cont.) STScI scheduling system –Phase 3 development completed and tested at STScI Ops bench testing at Ball per FSW availability timeline –Initiated mechanism alignment mode development (phase 4) on schedule requirements analysis and proposal instructions completed; OPRs filed TRANS development underway –STScI FSW-timing tests on ops bench - 40% complete

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 9 of 14 COS Phase Development Plan (rev 5, 6/1/01) Phase 1 (1/1/00 – 6/30/00) 1.Macro Development 2.Reconfigurations Phase 2 (7/1/00 – 12/31/00) 3.NUV Timetag Mode + Darks 4.FUV Timetag Mode + Darks Phase 3 (1/1/01 – 6/30/01) 5.FUV & NUV Accumulation Science Exposures 6.FUV & NUV Target Acquisition Exposures 7.FUV & NUV Target Peakup Exposures Phase 4 (7/1/01 – 12/31/01) 8.Aperture Alignment Exposures 9.OSM1 Focus Alignment Exposures 10.OSM1 Rotation Alignment Exposures 11.OSM2 Rotation Alignment Exposures 12. FUV & NUV FP-Split Exposures Phase 5 (1/1/02 – 6/30/02) 13. FUV & NUV GO Wavelength Calibration Exposures 14. FUV & NUV Automatic Wavelength Calibration Exposures 15. FUV & NUV Flat Field Lamp Calibration Exposures 16. SAA Contours Phase 6 (7/1/02 – 12/31/02) 17. SMGT Preparations 18. SMOV Special Commanding 19. FUV & NUV Anomalous Recovery 20. FUV & NUV Initial Turn-on 21. FUV & NUV BOP Target Screening Phase 7 (1/1/03 – 6/30/03) 22. FUV & NUV Lifetime Adjustments

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 10 of 14 Plans Planned Activities and Future Milestones: Evaluate and respond to OPUS/HDA and calcos CDR RFAs Continue Phase 4 ALIGN mode exposure development Conduct Phase 4 requirements review and initiate development for FP-SPLIT exposures Commence training new IS Commence ETC requirements definition Milepost Dates: –COS ops bench test data to STScI: 1 Dec 2001 (no change) –COS integrated SI test data to STScI: 1 April 2002 (no change) –SI delivery to GSFC: 11 Sep 2002 (+2 weeks) {+ ==> later than last report} –Launch: January 2004

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 11 of 14 Detailed Schedule

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 12 of 14 Resource Summary Current COS Resources (FY 01) –NISD 2 Scientists (1.5 FTE); new hire (K. Sembach) Sep 01 –SISD 1 Data Analyst (0.5 FTE) –ESS 1 System Engineer (0.5 FTE) 1 Command Development System Engineer (1.0 FTE) 1 Instrument Engineer (0.4 FTE) 2 Developers (1.25 FTE)

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 13 of 14 Metrics Progress versus Planned Milestones and Requirements: –2 of 2 planned activities completed within reporting period COS Pipeline PDR Requests for Action (RFA) Items : –5 (all remaining) closed during review period COS Pipeline CDR Requests for Action (RFA) Items: –12 opened (actionees assigned; all open at present)

Cosmic Origins Spectrograph Monthly Status Review 21 August 2001 Charles D.(Tony) Keyes Page 14 of 14 Issues Note: Arrows indicate trend (same, better, worse) by direction (right, up, down), and current impact (resolved/no issue, medium, severe) by color (green, yellow, red).   TitleIssueImpactActionStatus FSW Status at Ball Delay of FSW implementation for output of SI data and target acq Delays timeframe for testing our acq commanding and delays availability of hardware-generated test image data Delay testing; delay development of OPUS/HDA features and beta to be consistent with Ball capability STScI front and back end development proceeding; remains on-sched this period; ops bench timing tests proceeding Instrument Development NUV grating reflectivity None to STScI short- term; IDT long-term schedule impacts possible IDT continue consult with vendor; contract with 2 nd vendor (Hitachi) for G225M Replica gratings with possible fixes in preparation at primary vendor (J-Y)