Central Region Discussion Power and Cooling GDE Beijing-CFS.

Slides:



Advertisements
Similar presentations
Refrigeration & Air Conditioning
Advertisements

9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
LNG Hazards.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
September 18, 2009 Critical Facilities Round Table 1 Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
E Huedem, Nov ILC VALUE ENGINEERING SESSION of POWER & COOLING (Focus on Main Shaft 7) November 27, 2007 INFORMATION PHASE Conventional.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL CERN TS/CV Wednesday 9 th July 2008 CLIC.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
50% LBNE Concept Design WCD Infrastructure. Mechanical.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC Utility Design Study for Kitakami-site
Update on the PSB Cooling and Ventilation Systems
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
FIRE PROTECTION & SECURITY in ELI Beamlines
CBETA Technical Review
Detector Utility/Service Cavern
Americas KlyCluster Cost Analysis Overview
Detector Service Cavern for ILC
Tom Lackowski Fermilab
Maintenance at ALBA facility: Strategy for the conventional services
Presentation transcript:

Central Region Discussion Power and Cooling GDE Beijing-CFS

MAGNET / POWER SUPPLY LOADS Need updates Focus on e+

HEAT LOADS TO CFS (water/air) e+ SOURCE Need updates One for each components of source (undulator, auxiliary source, target & e+transfer) Total Power (KW) Total Heat Load (KW) Location RF service tunnel Magnets beam tunnel Power Supplies service tunnel Cables service & beam tunnel Dumps beam tunnel Racks service tunnel CFS CONTACT: ?

HEAT LOADS TO CFS (water/air) DAMPING RING Update SB2009 heat loads CFS CONTACT: T. LACKOWSKI

DUMPS – page1 (spaces)

DUMPS – page2 (capacity)

DUMPS – page 3

Power and Cooling Requirements Cooling by air systems – Temperature Requirements and tolerances Power supply rooms Computer and Control rooms – Air flow requirements, delta T, range (temp +/-), stability (allowable change/hour) – Humidity Requirements and tolerances – Heat loads to air – by area, are loads continuous or intermittent, diversity (min/max/norm) – Air exchange rates and purge requirements as it relates to heavier or lighter than air gas use. Hazardous or flammable gas. Cooling by water systems – System types, ICW, warm LCW, cooled LCW, chilled LCW, chilled water (CHW) – Temperature and stability requirements and tolerances – Water flow requirements and delta T – Heat loads to water – by system and area

Power and Cooling Requirements Cryogenic use as it relates to conventional mechanical, electrical, and space requirements Electrical Power Requirements (in watts) – Experimental Systems power requirements includes detectors, electronic, control rooms, etc. – Power Supplies – Equipment location – Redundancy – Primary and “out of beam” detectors – Grounding (isolation of grounding systems) – Emergency power/UPS Fire Protection/Life Safety Systems – Use of suppression gases, where, required volumes – Sprinkler systems – Fire detection – spot type, VESDA, line type heat detection

UNDERSTANDING DRFS – SPACES and CFS REQUIREMENT ILC GDE Beijing Meeting – Mar Load-Need moreinfo? DIMENSIONS CFS POWER REQMNT FLOWS? Or DT? FIRE LOADS ( OIL AMOUNT?) CURRENT INFO GIVEN KW for LCW Water per 2 RF Roughly 22-23KW each for rack chiller and heat load to air per 2 RF ILC GDE Beijing Meeting – Mar