DOE Transmission Reliability Program Peer Review WAMS Outreach Projects in FY03 John F. Hauer Pacific Northwest National Laboratory Richland, WA 99352.

Slides:



Advertisements
Similar presentations
Advanced Energy Conference New York, NY October 31, 2012
Advertisements

WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
NERC Critical Infrastructure Protection Advisory Group (CIP AG) Electric Industry Initiatives Reducing Vulnerability To Terrorism.
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Using Synchrophasors for Preventing Cascading Outages
NERC CIPC March 16, 2006 Roadmap to Secure Control Systems in the Energy Sector U.S. Department of Energy Office of Electricity Delivery and Energy Reliability.
GridWise ® Architecture Council Becky Harrison GridWise Alliance Future of the Grid Evolving to Meet America’s Needs.
and Trend for Smart Grid
Synchrophasors: Improving Reliability & Situational Awareness
1 Grid Modernization – A Strategic Imperative for 2050 Advanced Energy Conference May 1, 2013 By Carl Imhoff Electric Infrastructure Sector Manager Pacific.
August 14, 2003 Blackout Final Report
Introduction to Phasor Measurements Units (PMUs)
Purpose of the Standards
Family Outreach and Response Program Strategic Plan September 26 th, 2012.
The Current Status of States' Early Childhood Outcome Measurement Systems Kathy Hebbeler, SRI International Lynne Kahn, FPG Child Dev Inst October 17,
QA/QC FOR ENVIRONMENTAL MEASUREMENT
Review of BPA Voltage Control Conference
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
DOE Transmission Reliability Program Peer Review WAMS Outreach Project: Sharing of Knowledge & Technology John F. Hauer Pacific Northwest National Laboratory.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Synchrophasor Measurement Implementation in ERCOT
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Region III Activities to Implement National Vision to Improve Water Quality Monitoring National Water Quality Monitoring Council August 20, 2003.
Integrated Security Analysis Pete Sauer, PSERC – Illinois Kevin Tomsovic, PSERC – WSU Steve Widergren, PNNL January 27-29, 2004 Washington, D.C. Transmission.
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
NIST Special Publication Revision 1
Roadmap for Real Time Control Transmission Reliability Program Peer Review Washington DC, 27 January 2004 Jeff Dagle, Pacific Northwest National Laboratory.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Smart Grid Task Force Workshop meeting Mladen Kezunovic Texas A&M University Coordinator PSerc Workshop August 10-13, 2009 Breckenridge CO.
Eastern Interconnection Phasor Project Modernizing North America’s Electric Grid Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
DOE Transmission Reliability Program Peer Review WAMS Outreach Project: WECC Model Validation John F. Hauer for Ross Guttromson Pacific Northwest National.
Overview of Real Time Grid Reliability Management Carl Imhoff Pacific Northwest National Laboratory January 27-29, 2004 Washington, D.C. Transmission Reliability.
20th Century Electric Transmission Grid
Interoperability Standards and Next Generation Interconnectivity Pankaj Batra Chief (Engineering) CERC.
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.
United Nations Oslo City Group on Energy Statistics OG7, Helsinki, Finland October 2012 ESCM Chapter 8: Data Quality and Meta Data 1.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability.
PJM Interconnection Smart Grid Investment Grant Update
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Overview of Reliability Technology Issues and Needs Assessment Vikram Budhraja Electric Power Group January 27-29, 2004 Washington, D.C. Transmission Reliability.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
Imagination at work. Paddy McNabb Senior Engineer January 2016 Grid Stability Applications Wide Area Monitoring System.
© 2014 Utilities Telecom Council State of the Industry “WHY TELECOMMUNICATIONS TECHNOLOGY AND NETWORKS ARE CRITICAL TO THE UTILITY OF THE FUTURE: TECHNICAL,
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
Western Electricity Coordinating Council
Transposition of European Network Codes
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
Lawrence Berkeley National Laboratory
RESEARCH, EDUCATION, AND TRAINING FOR THE SMART GRID
NERC Critical Infrastructure Protection Advisory Group (CIP AG)
NASPI PMU Data Application Classification
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
NASPI PMU Data Application Classification
Considering Fidelity as an Element Within Scale Up Initiatives Validation of a Multi-Phase Scale Up Design for a Knowledge-Based Intervention in Science.
Presentation transcript:

DOE Transmission Reliability Program Peer Review WAMS Outreach Projects in FY03 John F. Hauer Pacific Northwest National Laboratory Richland, WA Prepared for the Transmission Reliability Program – 2004 Program Peer Review, January 27-29, 2004, Washington, D.C.

Page 1 Organization of WAMS Outreach Presentations Overview of WAMS Outreach activities WAMS Outreach Projects: – Controller Certification Tools – WAMS Outreach–Sharing Knowledge & Technology  Assistance in WAMS startup operations  Application of WAMS technologies (system tests, disturbance analysis)  Validation of system dynamic performance  PMU evaluation & standards – WECC Model Validation

Page 2 Challenge: Transmission Reliability During the Transition to Open Markets in Electrical Energy Federal Utilities "Lead by example" Share special technologies & expertise with other utilities Support the public good National Laboratories Consolidate and share special knowledge and expertise relating to electrical systems Consolidate, adapt, and share Federally owned technologies for electrical system use Track, assess, and report emerging needs in reliability assurance

Page 3 Strategic Objectives in the WAMS Effort: Reinforcing the Grid Management Process Determine information needs of the new power system – Control & protection – Planning & operations – Reliability management & workflow coordination Facilitate development of information resources – Value based development & deployment of technology – Demonstration & refinement of investment value – Maintaining necessary collaborations among stakeholders Promote & support sound engineering practice – Effective but prudent use of automatic control – Comprehensive methods for planning & operations – Functionalities & infrastructure for reliability management

Page 4 DOE/CERTS WAMS Outreach FY2003: Core Projects and External Linkages Primary Elements: Dissemination of Knowledge and Technology for Measurement- Based Reliability Management Assist in validation of System Dynamic Performance & Modeling Certification tools for large scale damping controllers Utility Linkages: Federal Utilities: BPA, Western, USBR WSCC utilities & technical bodies: – Disturbance Monitoring Work Group (DMWG) – Modeling & Validation Work Group (M&VWG) Eastern Interconnection utilities & technical bodies: NERC, ISOs, WAMS facility owners (AEP, Ameren, Entergy,TVA, etc) Other Linkages: Vendors, professional groups, universities

Page 5 DOE/CERTS WAMS Outreach FY2003: Related CERTS Projects & Activities Roadmap for Real-Time Control Concepts Framework for Real-Time Grid Data Archive and Analysis Control Schemes for Real-Time Control Eastern Interconnection Phasor Demonstration Project (EIPP) Analysis support for U.S.-Canada Blackout of August 14, 2003 [A,B] [A] "Performance of 'WAMS East' in Providing Dynamic Information for the North East Blackout of August 14, 2003", J. F. Hauer, Navin Bhatt, Kirit Shah, and Sharma Kolluri. Accepted as an invited paper for IEEE/PES Panel on Major Grid Blackouts of 2003 in North America and Europe, IEEE PES General Meeting, Denver, CO, June 6-12, [B] "Data Management Issues Associated with the August 14, 2003 Blackout Investigation", J. E. Dagle. Accepted as an invited paper for IEEE/PES Panel on Major Grid Blackouts of 2003 in North America and Europe, IEEE PES General Meeting, Denver, CO, June 6-12, 2004.

Page 6 WAMS Technology Targets for "WAMS East" Extend IEEE SynchroPhasor standard 1 to include – major control systems, especial HVDC and FACTS – generation projects that are critical to power system performance – critically placed relays – high level SCADA Adapt WAMS technology and operating experience to needs of the eastern interconnection: – lower data rates for flowgate monitoring – technology deployment strategies adjusted to information needs and legacy equipment in the eastern interconnection 1 "IEEE Standard for Synchrophasors for Power Systems," K. E. Martin et al., IEEE Trans. Power Delivery, Vol. 13 Issue 1, pp , Jan

Page 7 Good Information: The key to managing complexity

Page 8 Validation of System Performance & Modeling Measurement process: Determine actual system performance from tests or disturbances. This is an ongoing effort. Calibration process: Compare model against system. May require a wide range of time/frequency tools plus expertise in the mathematics of dynamic systems. Adjust model to improve comparison. Presently an art that requires expert knowledge of planning practices. (Some automation may be feasible. ) Uncertainty Modeling: Over time, determine & characterize errors in predictive modeling. This too is an ongoing effort.

Page 9 Wide Area Control: A definitive sufficiency test of grid management resources

DOE Transmission Reliability Program Peer Review WAMS Outreach Project: Controller Certification Tools John F. Hauer Pacific Northwest National Laboratory Richland, WA Prepared for the Transmission Reliability Program – 2004 Program Peer Review, January 27-29, 2004, Washington, D.C.

Page 11 Project: Controller Certification Tools Objectives: 1.Extend phasor network technology to incorporate controller information. 2.Extend probing signal technology for non-intrusive testing of controller effects across the power system. 3.Develop the Pacific HVDC Intertie as a general testbed for concepts and methodology associated with large scale FACTS control. 4.Report findings for inclusion in WECC/NERC/IEEE recommended practices for the design, certification, and operation of major control systems.

Page 12 Project: Controller Certification Tools Milestones: (established prior to August 14 Blackout) 1. Continued refinement of Phase #1 instrumentation for low level probing (in progress) 2.BPA/PNNL report on mid-level tests of summer 2003 (October 2003) 3.Low-level tests with random noise (October-December 2003) 4.Draft report on test objectives, procedures, and supporting technologies (January 2004)

Page 13 Project: Controller Certification Tools Progress in FY03: 1. Extensive mid-level tests have been performed during summer 2003, to assess and track system damping. 2.Results are under review as a guide to pending low-level tests, which are more general but more demanding. 3.High speed analog monitors have been enhanced for this application, and extended PMU technologies are under development to replace them. 4.An extended synchrophasor standard to support this is nearly final. 5.A great deal of analytical work has been performed but not formally reported.

Page 14 General Structure of Power System Disturbance Controls

Page 15 WAMS & FACTS: A Perspective on Robustness Functional reliability for control systems is far more complex than for new construction. Good design is important, but good operating practice is critical. Operational robustness for large scale control requires –design and certification procedures based upon directly measured system dynamics –assured resources for the prompt detection, analysis, and correction of anomalous controller effects

Page 16 FACTS: The Key is Infrastructure! — at all stages of the engineering process. Wide area control requires wide area information — at all stages of the engineering process.

Page 17 Real-Time Applications for Phase Angle Measurements Basis for high quality bus frequency signals Validation of system dynamic performance Angle-assisted state estimation System restoration Operator alerts for high-stress operating conditions Arming of special stability controls Supervision of fast stability controls Real-time powerflow control (e.g., phase shifters, slow TCSC) Modulation inputs for “bang-bang” stability controls (e.g., phase-plane controllers) Modulation inputs to other controller types? PERHAPS!

Page 18 Startup Signature for Hz Oscillations on June 4, 2003

Page 19 Spectrum Waterfall plot for NW Oscillations on June 4, 2003

Page 20 DC Quantities Local Generation PSG Playback 1 EXTERNAL POWER SYSTEM 1 GPS timing desirable 2 Presently 30 sps 3 Initially sps, future sps Celilo Converter AC Quantities Low Speed StreamReaders & Analyzers Probing Signal Monitor High Speed 3 PMU/PDC High Speed StreamReader & Analyzer Low speed link Converter Controls Low Speed 2 PMU/PDC Network Equipment for AC/DC Monitoring & Controller Certification Tests

Page 21 Key response signals for probe insertions on August 7, 2003

Page 22 The Western Power System: A challenge in dynamic complexity