Next Generation Trnsport Trnsport Users Group Conference Field Management TAG November 7, 2005.

Slides:



Advertisements
Similar presentations
Presentation Title | Date | Page 1 Extracting Value from SOA.
Advertisements

State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
JUNE 2007 page 1 EDS Proprietary Applications Modernization Services Modernizing the Applications Portfolio.
© 2007 AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Interactive Solutions & Design Group.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Trnsport Test Suite Project Tony Compton, Texas DOT Charles Engelke, Info Tech.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Building an Operational Enterprise Architecture and Service Oriented Architecture Best Practices Presented by: Ajay Budhraja Copyright 2006 Ajay Budhraja,
NGT Information Technology Technical Discussion Bob DeHoff Info Tech, Inc.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Copyright © 2009 Accenture All Rights Reserved. 1 Copyright © 2008 Accenture All Rights Reserved. Client background This client is one of the world's largest.
1 sm Using E-Business Solutions to Meet Management Challenges: Interoperability & Flexibility Bring Success to the Implementation of Specialized Components.
Next Generation Trnsport Presented by Paul Neumann, TTF Chair, Colorado DOT Ian Baldwin, Info Tech, Inc. November 2005.
Trns*port Data Model Unification Joe Pugh Virginia Department of Transportation Peggy Leight Info Tech Inc 11/06/05.
Integrated Process Model - v2
INDOT’s Scheduling / Project Management System (SPMS) Vision & Objectives for Next Generation SPMS Mike Jenkins, Indiana DOT Teresa Franklin, Info Tech,
Building a Mutually Rewarding Partnership [Your Company Name]’s Commitment to Delivering Unequaled Value to [Client Name] (Replace with client logo)
EPM Live – Positioning for Enterprise Project Management Presented by: Sasha Lomas, PMP ASL InfoTech inc. March 3, 2010.
The Evergreen, Background, Methodology and IT Service Management Model
IT Project Management Cheng Li, Ph.D. August 2003.
Object-Oriented Analysis and Design Iterative Development and the Unified Process.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
1 IBM Software Group ® Mastering Object-Oriented Analysis and Design with UML 2.0 Module 1: Best Practices of Software Engineering.
Software Engineering Modern Approaches
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Next Generation Trnsport Presented to the AASHTOWare Trnsport User Group October 14, 2004.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
What is Oracle Hyperion Planning  Centralized, web- based Budgeting and Planning application  Combines Operational and Financial measures to improve.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
SCSC 311 Information Systems: hardware and software.
Industry specific cover image Oracle | Agile PLM Implementation Best Practices Guillaume Vives, Sr. Practice Director Agile National Practice, Oracle consulting.
A Global Dialogue on The Impact of Open Source Software on Transforming Government Shahani Markus Weerawarana, Ph.D. October 2008 Sri Lanka.
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
BMS/BES Project Update IOC and ITSC Meetings May, 2005.
IS Methodologies. Systems Development Life Cycle - SDLC Planning Planning define the system to be developed define the system to be developed Set the.
Service Oriented Architecture CCT355H5 Professor Michael Jones Suezan Makkar.
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
I Copyright © 2007, Oracle. All rights reserved. Module i: Siebel 8.0 Essentials Training Siebel 8.0 Essentials.
AP-1 4. Agile Processes. AP-2 Agile Processes Focus on creating a working system Different attitude on measuring progress XP Scrum.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Next Generation Trnsport Current Development Update Presented by Ian Baldwin, Info Tech, Inc. October 2006.
Trnsport Test Suite Status Presented to the AASHTOWare Trnsport IT TAG October 12, 2004.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Modelling the Process and Life Cycle. The Meaning of Process A process: a series of steps involving activities, constrains, and resources that produce.
Next Generation Trnsport Impact Assessment Sub-project Jim Johnson, Florida DOT and Pamela Barry, Info Tech, Inc.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
MEASURING BPM SOFTWARE ROI AND ITS BENEFITS IN RISK MANAGEMENT PROCESS AUTOMATION Contact us at | Web : | Tel: 1.
Enterprise Solution Services Assessing the IT environment Oversaw 2014 Texas Legacy System Study report (HB 2738, 83R) Identified 4,130 business applications.
Embedded Systems Software Engineering
Flight Software Conference 2016
Identify the Risk of Not Doing BA
Agile Software Development Brian Moseley.
V-Shaped SDLC Model Lecture-6.
The Transportation Information Gateway An Open Source Web Platform for Collaboration in the Planning Process AMPO 2017 Annual Meeting Brian ten Siethoff,
Description of Revision
Introduction to Software Engineering
How to Successfully Implement an Agile Project
Enterprise Program Management Office
Chapter 3: Agile Software Processes
HCL Application Modernization Services
Presentation transcript:

Next Generation Trnsport Trnsport Users Group Conference Field Management TAG November 7, 2005

Next Generation Trnsport (NGT) December Trnsport Task Force (TTF) decided to rewrite the Trnsport software –The rewrite will involve the whole Trnsport product –The rewrite will take a period of several years to complete

Why Rewrite the Trnsport Software? TTF has set seven strategic goals for Trnsport These goals will be achieved through Next Generation Trnsport rewrite

Trnsport Strategic Goals Align with the AASHTOWare strategic direction –Web services, web-based clients, XML Eliminate unnecessary boundaries between and within systems –Unified data and security models and business rules Bring Trnsport’s value to a broader audience –Web-based access, support for multiple devices Reduce agency Total Cost of Ownership –Easier deployment, support, training, integration, use

Trnsport Strategic Goals (cont.) Provide architecture that meets the needs of current and future customers –Flexible, loosely coupled Services-Oriented Architecture –Improved reporting capabilities Build a consistent, unified data model –Also unify business rules and security model Enable easier integration with other systems –Web service interfaces based on industry standards

NGT Conceptual Architecture

NGT Services-Oriented Architecture

Services-Oriented Architecture Benefits –Encapsulate complexity –Loosely couple business model & technologies –Share data and contracts, not objects –Standards-based data integration and sharing –Support multiple client types –Perform testing more easily and efficiently –Perform development efforts in parallel Challenges –Security –Reliability

NGT Project Approach

Approach to Mitigate the Risks Start with PES/LAS, the most mature module with the most thoroughly documented business rules Use agile methodology based on “Scrum” methodology –Non-fixed scope project with fixed budget and schedule –Rapid development with frequent review and validation –Monthly “sprint” cycle: plan, execute, review/validate –Ability to adjust direction quickly based on discovery Frequent collaboration with TTF, including face-to-face meetings –Weekly TTF Conference Call –Monthly End Sprint Reviews Hands-on product validation at each iteration

Benefits of Agile Approach Lower risk since scope is flexible & refined as needed Get business value sooner since priorities are continually reviewed and adjusted Better solution in the end because you can adjust to changing conditions and knowledge gained Lower overall cost because risks are mitigated by the methodology Higher quality due to more frequent customer reviews and testing

NGT Phase 1

Phase I Project Risks Building new architecture with evolving technology Redefining the user interface and user experience Moving business rules from GUI and middle tiers into a service-oriented model Broad reach of data and security model and business rule unification goals

NGT Phase 1 Project Goals Implement Trnsport proposal, letting, and award business functions, releasing to all licensees when functionally equivalent to client/server PES/LAS Develop architecture Phase 1 functions require forward-looking design for future phases: –Architecture –Business rule unification –Data model unification –Security model unification –User interface look-and-feel unification

Phase 1 Migration Assistance Agencies have made significant investments in configuring Trnsport and developing custom extensions to Trnsport Phase 1 Migration Assistance Plan –Customization inventory and migration assessment –Migration scope estimation –Funded migration assistance available to PES/LAS licensees for a limited time after production release

NGT Rewrite Schedule

NGT Roadmap This schedule is tentative and is subject to change due to factors such as funding availability

Next Generation Trnsport How does this affect the Field Management TAG?

Next Generation Trnsport