Island Greenway Bike Path Alternatives Alternative “B“ (New License) Alternative “A“ (New License)

Slides:



Advertisements
Similar presentations
ISTISNA AS MODE OF FINANCE
Advertisements

Statement No. 60: Accounting and Financial Reporting for Service Concession Arrangements.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR April 25, 2014.
Property Management Workshop REAL ESTATE SESSION Presented by Nisha Kumar, Attorney-Advisor, Office of the Assistant General Counsel for General Law, GC-77.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Manager’s Recommendation FEBRUARY 11, 2015 COUNCIL ROOM.
Barr Hammock Levy Prairie Loop Trail Alachua County Board of County Commissioners, October 28, 2014.
INDUSTRIAL RAILWAY CONFERENCE Rail Conceptual Design Panel Discussion – April 28, 2015.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Appendices Subpart R Steel Erection
Capital & Operating Leases ODJFS Office of Fiscal & Monitoring Services Bureau of County Finance & Technical Assistance OJFSDA Conference, June 2009.
David Lamoureux CalPERS Deputy Chief Actuary
Amendments to Chapter 30 & 38 (Zoning Regulations) 1 st BCC PUBLIC HEARING April 22, 2008 Amendments to Chapter 30 & 38 (Zoning Regulations) 1 st BCC PUBLIC.
#ICANN49 Standing Committee on Improvements Implementation (SCI) Activities Update to the GNSO Council ICANN Singapore Meeting 22 March 2014.
City of New Brighton Planning Commission Meeting October 18, 2005 Agenda Item: 6A (Public Hearing) Special Use Permit for Detached Garage Exceeding 624.
A market consistent framework requires a “risk-free” yield curve to assess the technical provisions The swap and bond curves have been identified as potential.
+ Sorting Out the Pieces WFAN Conference Edward Cox Staff Attorney, Drake Agricultural Law Center
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Review Group 0221 Session 4: 28 th October Introduction  Agenda item 4.1 Focus Session: “Who/What capacity holders should be captured by these.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Island Greenway Project MARCH 10, 2015 COUNCIL MEETING.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Stanton Energy Center Solar Facility Presentation to the Board of County Commissioners February 22,
Asbestos Valuation CLRS – Chicago; September 8, 2003 Kevin M. Madigan, PhD, ACAS, MAAA Vice President, Platinum Underwriters Bermuda, Ltd. Claus S. Metzner,
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Milliman Asbestos Valuation 2004 Casualty Loss Reserve Seminar Las Vegas, Nevada September 13, 2004 Claus S. Metzner, FSA, FCAS, MAAA, Aktuar – SAV Actuary,
Community Development Department COUNTRY CLUB HARBOR SINGLE FAMILY RESIDENTIAL-2 AND PARKS & GREENWAYS ZONING DISTRICTS REZONING APPLICATION #2511.
Department of Public Works Approval to Install Enduring Heroes Memorial Sculpture in Honor of Pasadena Area Fallen Soldiers Defenders Parkway West September.
1 Voluntary and Community Sector Review Voluntary & Community Sector Review Grants Strategy Working Party Participative Session 28 September 2006 Appendix.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
COMMANDER’S INTENT & GUIDANCE
Chapter 10-1B. Partnership. Distributions. C16-Chp-11-1B-Ptshp-Distributions-2016 Howard Godfrey, Ph.D., CPA Professor of Accounting Copyright 2016.
RMS Update to TAC October 2, RMS Update to TAC TAC Confirmation Vote Request Kyle Patrick of Reliant Energy and Independent Power Marketer segment.
Bay Breeze Point “A Premier Waterfront Community” HOA Fencing Study Group January – October Phase 2 Fencing Study Group Working Papers.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Strategic Information Initiatives Week 5 Analysis Framework.
Real Property Policy Update Planning and Development Committee August 4, 2015.
Scott Raines, Director of School Planning and Construction “Investing in West Virginia’s Future”
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
US Army Corps of Engineers ® Engineer Research and Development Center Sensitivity and Uncertainty.
City of San Mateo 2016 Reach Code
ERCOT Bylaws Amendments
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Feather River West Levee Project Project Area C May 24, 2013
Santa Cruz avenue sidewalks Project
ABANDONMENT OF A PORTION OF A PUBLIC UTILITY EASEMENT RANCHO SAN MIGUEL MARKET June 21, 2005 Agenda Item 9.01.
(Additional materials)
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Joint Finance Committee, November 13, 2017
MOD.A’s Quality Standard
See example excel files examples
Decommissioning Rulemaking
Print Reading.
Forest Glen Retail Survey
Town of Kiawah Island Planning Commission
City Council Meeting November 14, 2016
Attendance Boundary Development & Revisions
SSUSD Richmond Elementary Status to Board of Education May 2, 2019
Major PAR form questions
WI Natural Resources Board June 2017 Webcast
12 D. Variance Request – 211 Jennifer Lane
Presentation transcript:

Island Greenway Bike Path Alternatives Alternative “B“ (New License) Alternative “A“ (New License)

Island Greenway Bike Path Alternatives Alternative “C“ (Existing Easement w/Amendments)

Island Greenway Bike Path Alternatives Alt. A – Bike Path on east side of retention pond – License with no “consideration clause” – Condition of license requires construction of FE-6 fence (min) & 50-ft clear zone; and maintenance for life of license (i.e. assuming multiple renewals) Alt. B – Bike Path on west side of retention pond – License contains “consideration clause” for fair market value (FMV) – Construction of FE-6 fence (min) & 50-ft clear zone ; and maintenance as “consideration” in first term of license – FMV payment as “consideration” in the subsequent renewals Alt. C – No Bike Path – Amend easement to include as-builts for retention pond and require construction of FE-6 fence (min) & 50-ft clear zone for public safety – No consideration required Assumption: Either license (Alt. A or Alt. B) conveys everything from west side of “Greenway” to the MOTSU boundary to the east

License Considerations License include sufficient condition and liability for the proposed use (bike path) Any “new” use requires approval at Assistance Chief of Staff for Installation Management (ACSIM) day process Anything up to 20-yrs possible, longer terms risk non-approval.

Independent Action Items Amend Easement #DACA to reflect as-built conditions Address perceived encroachments Determine appropriate fence that meets Army needs

Potential Alternative Fence We can approve the use of a higher-rated security fence that may be more aesthetically pleasing. Examples include ornamental fences referenced (with specifications) in Unified Facilities Criteria , dated 1 October 2013 (e.g./ drawings UFC 720 & 721).

Ornamental Security Fencing Examples