WP 1 (Globus) Status Report Massimo Sgaravatto INFN Padova for the INFN Globus group

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

Installation and evaluation of the Globus toolkit WP 1 INFN-GRID Workload management WP 1 DATAGRID WP 2.1 INFN-GRID Massimo Sgaravatto INFN Padova.
INFN & Globus activities Massimo Sgaravatto INFN Padova.
Globus FTP Evaluation test Catania – 10/04/2001Antonio Forte – INFN Torino.
Grid Workload Management (WP 1) Report to INFN-GRID TB Massimo Sgaravatto INFN Padova.
Test con MPIch-G2 Roberto Alfieri - Fabio Spataro WP1 meeting January 11, 2001 Gruppo Collegato di Parma.
LNL CMS M.Biasotto, Padova, 24 aprile Farm monitoring Massimo Biasotto - LNL.
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
WP2: Data Management Gavin McCance University of Glasgow November 5, 2001.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Istituto Nazionale di Fisica Nucleare Italy LAL - Orsay April Site Report – R.Gomezel Site Report Roberto Gomezel INFN - Trieste.
Work Package 1 Installation and Evaluation of the Globus Toolkit Massimo Sgaravatto INFN Padova.
Preparation of D1.7 Massimo Sgaravatto INFN Padova.
Evaluation of the Globus Toolkit: Status Roberto Cucchi – INFN Cnaf Antonia Ghiselli – INFN Cnaf Giuseppe Lo Biondo – INFN Milano Francesco Prelz – INFN.
CERN LCG Overview & Scaling challenges David Smith For LCG Deployment Group CERN HEPiX 2003, Vancouver.
WP 1 Grid Workload Management Massimo Sgaravatto INFN Padova.
CMS HLT production using Grid tools Flavia Donno (INFN Pisa) Claudio Grandi (INFN Bologna) Ivano Lippi (INFN Padova) Francesco Prelz (INFN Milano) Andrea.
GRID workload management system and CMS fall production Massimo Sgaravatto INFN Padova.
Status of Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
LNL M.Biasotto, Bologna, 20 novembre Providing the Grid Information Service with information of local farms Massimo Biasotto – INFN LNL Massimo.
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
Report on the INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
GRID Workload Management System Massimo Sgaravatto INFN Padova.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management Massimo Sgaravatto INFN Padova.
First steps implementing a High Throughput workload management system Massimo Sgaravatto INFN Padova
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
Evaluation of the Globus GRAM Service Massimo Sgaravatto INFN Padova.
GRID Centralized management of the Globus grid-mapfile Carlo Rocca INFN, Catania.
INFN-GRID Globus evaluation (WP 1) Massimo Sgaravatto INFN Padova for the INFN Globus group
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
STAR scheduling future directions Gabriele Carcassi 9 September 2002.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
DATAGRID ConferenceTestbed0 - resources in Italy Luciano Gaido 1 DATAGRID WP6 Testbed0 resources in Italy Amsterdam March,
A. Cavalli - F. Semeria INFN Experience With Globus GIS 1 A. Cavalli - F. Semeria INFN First INFN Grid Workshop Catania, 9-11 April 2001 INFN Experience.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
A monitoring tool for a GRID operation center Sergio Andreozzi (INFN CNAF), Sergio Fantinel (INFN Padova), David Rebatto (INFN Milano), Gennaro Tortone.
Grid Workload Management Massimo Sgaravatto INFN Padova.
Laboratório de Instrumentação e Física Experimental de Partículas GRID Activities at LIP Jorge Gomes - (LIP Computer Centre)
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 1 DataGrid Workshop INFN Testbed status report L. Gaido Oxford July,
Report from USA Massimo Sgaravatto INFN Padova. Introduction Workload management system for productions Monte Carlo productions, data reconstructions.
Globus Toolkit Massimo Sgaravatto INFN Padova. Massimo Sgaravatto Introduction Grid Services: LHC regional centres need distributed computing Analyze.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
Proposal for a IS schema Massimo Sgaravatto INFN Padova.
Report on the INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
GRID Centralized Management of the Globus grid-mapfile Carlo Rocca, INFN Catania.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
GIIS Implementation and Requirements F. Semeria INFN European Datagrid Conference Amsterdam, 7 March 2001.
4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli Wide Area Workload Management Work Package DATAGRID project Parallel session report Cristina Vistoli.
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
Grid Workload Management (WP 1) Massimo Sgaravatto INFN Padova.
INFN “Grid Information Service” evaluation Giuseppe Lo Biondo - INFN Sez. Di Milano Giulietta Vita Finzi - INFN CNAF Padova June
Summary of the EDG review Some info for the next future of the WP1 software Massimo Sgaravatto INFN Padova.
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
First evaluation of the Globus GRAM service Massimo Sgaravatto INFN Padova.
Workload Management Workpackage
CEMon
Evaluation of “data” grid tools
EDT-WP4 monitoring group status report
GRID Workload Management System for CMS fall production
Presentation transcript:

WP 1 (Globus) Status Report Massimo Sgaravatto INFN Padova for the INFN Globus group

Meetings Last meeting: January 11, 2001 No other meetings scheduled

Security (GSI) Management of grid-mapfile updates Script to publish user certificates in LDAP server (done [G. Lo Biondo]) LDAP server populated by CA manager (to do) Members of groups published in LDAP server (update done by administrators of these groups) Web tool to manage groups (work in progress [C. Rocca]) Evaluation of existing tools (done) Tool for end user (to do) Tool (certretrieve) used to query the LDAP server (for example to get the members of a specific group): the results are grid-mapfile entries (done [G. Lo Biondo]) Tests with Kerberos (AFS) Analysis of how access AFS now and open issues (done [F. Prelz]) Address the issues (to do ??)

Information Service (GIS) Netscape LDAP server as mirror of top level GIIS (to do [G. Lo Biondo, G. Vita Finzi, F. Semeria, E. Fasanelli, Ferrara]) Review the information gathered from the various machines and published in the GIS (to do [G. Lo Biondo, G. Vita Finzi, F. Semeria, E. Fasanelli, Ferrara]) Tests on performance and scalability (work in progress [F. Semeria, G. Vita Finzi, G. Lo Biondo, E. Fasanelli, Ferrara])

Resource Management Fixes for job manager memory leaks (done) Tests with GRAM API (done [F. Giacomini]) GRAM – GIS cooperation (work in progress) Review and integrate the information concerning a FARM published in the GIS First proposal defined (considering LSF and Condor) (done [M. Biasotto, M. Sgaravatto]) Necessary to integrate this proposal considering also PBS (work in progress [Torino]) Development of scripts for LSF (work in progress [M. Biasotto]) Tests with MPICH-G2 (done [Alfieri, Spataro]) MPICH-G2 vs MPICH SMP, LAN, WAN (Pr – Pd)

Globus deployment Patches (for job manager) to apply to INFN-GRID 1.2 installations (done [Pisa]) INFN-GRID 1.3 (work in progress [Pisa]) Fixes for Globus jobmanager memory leaks GDMP 1.2 Distribution of various Globus compilations (Kerberos, MPICH-G2) Certretrieve Other bug fixes Web software repository (done [L. Fonti, G. Vita Finzi])

Data Management Tests with globusftp alpha release 2 (work in progress [Cnaf, Torino, Napoli, Padova]) Collaboration with WP Network Tests with replica catalog software alpha release 2 (work in progress [Pisa]) Collaboration with WP Data Management

Report conclusivo Ch. 1 - Introduction (F. Prelz, M. Sgaravatto) Ch. 2 - Globus deployment and installation tools (F. Donno) Ch. 3 – Security (F.Prelz) Ch. 4 – Information Service (G. Lo Biondo) Ch. 5 – Resource Management (M. Sgaravatto) Ch. 6 – Data Access and Migration (L. Gaido) Ch. 7 – Other services (M. Sgaravatto) Ch. 8 – Experiments Alice Cms Atlas (??) Ch. 9 – Conclusions (F. Prelz, M. Sgaravatto) Editor: F. Prelz

Report conclusivo: schedula 11/1/2001 Definizione della struttura del documento Assegnazione dei chapter agli autori Scelta delleditor 28/1/2001 Gli autori producono un primo draft del loro chapter, e lo inviano a 4/2/2001 Deadline per inviare feedback sul primo draft 11/2/2001 Gli autori producono un secondo draft, e lo inviano alleditor 20/2/2001 Leditor produce una prima versione del documento, e lo invia a 23/2/2001 Deadline per mandare feedback alleditor 28/2/2001 Leditor produce la versione definitiva

Other info