Where We Go Wrong - With Compressors Dick Hawrelak Presented to ES-317y in 1999 at UWO.

Slides:



Advertisements
Similar presentations
An Introduction To Marine Steam Propulsion Plant [Source: US Navy]
Advertisements

Commissioning Approach Integrated Service Solutions
1 Copyright Electric Power Research Institute 2008 Steam Turbine-Generator Guidelines Quick Start VolumeContent 1General Practices Condition assessment,
Daikin Altherma™ Troubling Shooting
“Energy Efficiency Guide for Industry in Asia”
Where We Go Wrong In Distillation Towers Dick Hawrelak Presented to ES317Y in 1999 at UWO.
Where We Go Wrong In Line Sizing Dick Hawrelak Presented to ES317Y in 1999 at UWO.
Labyrinth seal into two halves
EQUIPMENT CALCULATIONS SELECTION & SIZING. DETAIL REQUIRED FOR A PROJECT COMPONENTS NEEDED FOR EVALUATION M & E BALANCE DATA EQUIPMENT COSTS OPERATING.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
Vapor and Combined Power Cycles
Objectives: Understand importance of utility and maintenance system in industry/plant.
C oncerns Ltd ool Energy Efficient Refrigeration Jane Gartshore, Cool Concerns Ltd.
COMMERCIAL REFRIGERATION
Pumps, Compressors, Fans, Ejectors and Expanders
Section 5: Commercial Refrigeration
The art of Engineering
PACCON 2013 PREDICTION OF NITROGEN OXIDE GENERATED FROM GAS TURBINE ENGINE Global Chemical Sciences for Green Community NATCHANON CHAIPRASERT / AMORNCHAI.
Pump Installation Vigyan Ashram, Pabal.
POWER PLANT.
Combined_Cycle_Power_Plant Prepared by: Nimesh Gajjar.
COMPRESSOR BASICS.
Compressed Air Systems “…order up a two-can jam in the back of the bus!” - EM2(SS) Barrow.
Where We Go Wrong In Heat Exchangers
Oil Pressure Problems What to look for.
Air Compressors.
Specifying Pumps. Prepared by Martin Ryan, 2013 Training Series: Using Aspen Technology Economic Evaluation Suite.
Week 1 Unit Conversions Mass and Volume Flow Ideal Gas Newtonian Fluids, Reynolds No. Week 2 Pressure Loss in Pipe Flow Pressure Loss Examples Flow Measurement.
Electricity from Geothermal. Developing the Geothermal Resource for Power Generation  Geothermal Well Characteristics  Vapor Dominated  Dry Steam 
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
Where We Go Wrong In Pump Design Dick Hawrelak Presented to ES317Y in 1999 at UWO.
Conservation of Mass, Flow Rates
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
Operation and Maintenance
Vapor and Combined Power Cycles (2)
Clean and Pure steam in the Biopharm industry
Gas Turbine Theory and Construction
So Far: Mass and Volume Flow Rates Reynolds No., Laminar/Turbulent Pressure Drop in Pipes Flow Measurement, Valves Total Head, Pump Power, NPSH This Week:
Gas Turbine Theory and Construction. Introduction Comprehend the thermodynamic processes occurring in a gas turbine Comprehend the basic components of.
1 CRITICAL ROTATING EQUIPMENT CRITICAL ROTATING EQUIPMENT PACKAGES – 12 FOR POWER GENERATION INCLUDING STEAM TURBINES and 14 FOR GAS COMPRESSION.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Unit 2 -Gas And Diesel Power Plants
Why Maintenance Tasks are Important Produced by Joe Marchese.
SURGE Compressor surge is an unstable phenomenon where the gas flow forward and backward across the machine alternatively. This phenomenon occurs at certain.
DRAFT. Introduction  Mechanical Power Reciprocating Engines Turbines Turbines are compact machines (high power to weight ratio, having less balancing.
SUBJECT CODE NAME OF SUBJECT TOPIC :::::: FLUID POWER ENGINEERING CENTRIFUGAL PUMP Parul Institute of Engineering & Technology.
1-1-Why Maintenance HVAC ? Increases equipment life & reliability Reduces size & scale & number of repairs Lowers maintenance costs through better.
So Far: Mass and Volume Flow Rates Reynolds No., Laminar/Turbulent Pressure Drop in Pipes Flow Measurement, Valves Total Head, Pump Power, NPSH This Week:
Lesson 9 COMPRESSION PROCESSES Apply the ideal gas laws to SOLVE for the unknown pressure, temperature, or volume. DESCRIBE when a fluid may be considered.
Centrifugal Compressor
Prepared By Rohit G. Sorte M.Tech
Rotary Vane Reciprocating Compressor Patent Application No. 5624/CHE/2014 ISRF Proprietary - Patent Pending -
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Fluid Power Control FLUID POWER INTRODUCTION TO PNEUMATICS # Learning Objectives : Upon completion of this chapter, Student should be able to …  Describe.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 1317 Natural Gas Processing I Chapter 6A Intro to Refrigeration.
Gas Turbine Power Plant
Fixed Orifice Tube Cycling Clutch System (FOTCC)
GROUND SERVICING OF VARIOUS SUB SYSTEMS
Fixed Orifice Tube Cycling Clutch System (FOTCC)
PTRT 1391 Natural Gas Processing II Chapter 3
Energy balance for the compressor in this figure:
Applied Thermal Engineering
Desuperheater Heat Transfer Device Manufactured by Maniks
Chapter 5 The First Law of Thermodynamics for Opened Systems
ITEMS TO CHECK ON Running Pumps
Process Equipment Design and Heuristics – Gas Compressors
HAZOP Guidewords Base Set
12. Heat Exchangers Chemical engineering 170.
PUMPS AND DRIVERS NCCER
Presentation transcript:

Where We Go Wrong - With Compressors Dick Hawrelak Presented to ES-317y in 1999 at UWO

Introduction n 5% of large property damage losses are caused by failures in pumps and compressors. n When a major failure takes place, the average trended Loss is $19.2MM. n C3H6 compressor,driver & spares in a world scale ethylene plant costs $17MM purchased.

Compressors Costs FS LHC#1 Cost Summary By Elliott RAH Estimated CGK-201/K-321$17,239,800 $17,472,331 PropyleneK-601$8,667,000 $6,674,797 EthyleneK-651$6,014,000 $5,478,011 $31,920,800 $29,625,

Compressor Problems n The following are some of the problems found in compressor design and operation. n The compressor train includes; compressors, drivers, KO Pots, exchangers and storage vessels.

Complex Comp Systems Can Be Found In An Ethylene Plant

Mass Balance Problems n Process start-up, shut down or upset conditions not well defined. n Refrigerant mass balances. n Steam driver mass balances n Hot gas turbine mass balance. n Designers did not consider all problems associated with recycle for turn-down or false-load conditions.

Typical Steam Balance

Pressure / Temperature n Operating points not well located. n Poor data from the field. n Poor data is useless for determining compressor performance.

Interstage Conditions n If low stage pressure drops are higher than designed, final stage discharge pressure may not be achieved. n See NCOMP example for demonstration.

NCOMP Results

Discharge Conditions n Discharge temperatures higher than allowable limits. Indicates lower efficiency and pending trouble. n See NCOMP example for demonstration.

Composition n Actual plant feed stock differs from design feed stock. n Condensate compositions differ from one oil field to another. n Design for 100% ethane cracking but operate with mixed HC feeds.

Physical Properties n Vendor and customer did not agree on physical properties. n Non-ideal vapor / liquid systems. n VCM plant operates at 50% of capacity.

Vendor Offering n Vendors often quote unusually high compressor efficiency to try and win the contract. n Many customers are gullible enough to swallow the offering. n Difficult to pin vendor down on final performance. Too many degrees of wiggle freedom.

Follow-up n Customer fails to up-date material and energy balance after vendor shop tests confirm projected adiabatic compression efficiency.

Prototypes n Customer accepts vendor prototype offering with blind faith. n Ford Edsel example.

Spare Parts n Customer fails to request a spare rotor. 6 months to fabricate. n Customer orders a spare rotor but stores it incorrectly. n Rotor must be balanced in a coffin, turned regularly and the coffin nitrogen purged under positive pressure.

Shop Tests n Customer goes the cheap route and specifies only a “one point” shop test. n Customer fails to witness construction and final shop test.

Fabrication n Customer accepts vendor without shop visit. n Poor fabrication techniques.

Interstage Seals n Poor seal selection. n Mechanical seal. n Hot gas seal. n Water seal.

Vibrations n Vendor fails to identify all critical speeds. n Vendor makes a poor vibration corrections. n Poor vibration monitors and trip system.

Bearings n Poor fabrication. n Poor alignment. n Poor maintenance.

Anti-surge Control n High vibrations on approaching stonewall point. n Anti-surge control does not respond as required.

Shut-down Trip Systems n Cheap trip systems do not identify what tripped the compressor by a “first out” diagnostics trip system. n Poor trip systems do not permit good diagnostics following a compressor trip.

Lube Oil Systems n Insufficient lube oil reservoir capacity for roll-down. n Lube oil lines not cleaned before start-up. n Poor lube oil supply. n Non union lube oil system reassembled by local union.

Field Inspection n Customer fails to inspect lines after contractor finishes job. n Contractor hammer wrecks compressor on start-up.

Compressor Gears n Poor gear design. n High noise. n Poor alignment on maintenance. n Poor lubrication.

Compressor Configuration n Over-hung lines on compressors are poor for maintenance. n Bottom-hung lines on compressors are good for maintenance but require taller compressor building.

Typical Configuration

3 Case C3H6 Compressor

Foundations n Poor soil bearing tests fail to disclose soil loading problems. n Compressor experiences settling. n Alignment suffers and compressor wrecks. n One project manager doubles all foundation specifications to be on the safe side.

Inlet Piping n Inlet lines too small. n Inlet vanes do not receive design flow due to poor flow distribution.

Driver Selection n Electrical motor. n Diesel motor. n Gas turbines. n Steam turbines. n Drivers require as much attention as the compressor.

Possible Exam Questions n In a multi-stage compressor, if the low stage pressure drops are higher than designed, how will the final final discharge pressure be affected? n What is the problem of running a compressor with a very high discharge temperature? n Why do we install vibration monitors and high vibration trips on centrifugal compressors? n ***