GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650) 926-8531.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectPDU/GASU MRR, February 4, DAQ & FSWV3 1 GLAST Large Area Telescope: B. Estey, G. Haller, D. Marsh SLAC
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
EFW DFB Systems Assurance
EFW DFB Systems Assurance
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
THEMIS Mission Assurance
Mechanical Integration
ISUAL Product Assurance
2K CB FDR Overview:  Agenda, Charge, Review Process
GLAST Large Area Telescope
BRIAN KLATT MISSION ASSURANCE MANAGER
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650) Gamma-ray Large Area Space Telescope GASU/PDU MRR Part 2

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 2 Parts, Materials, and Processes EEE Parts –All EEE parts have been approved for use by the Program Parts Board –Status of PDU Box Level Parts Qualification, Rev. C1 (highlighted yellow items=part approved, not in use): Some columns have been hidden to assist in presentation reading

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 3 Parts, Materials, and Processes EEE Parts, cont’d –Status of PDU CCA Parts Qualification, Rev. Q (highlighted yellow =part approved, item not in use): Some columns have been hidden to assist in presentation reading

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 4 Parts, Materials, and Processes EEE Parts, cont’d –Status of PDU CCA Parts Qualification, Rev. Q, cont’d (highlighted yellow =part approved, item not in use): Some columns have been hidden to assist in presentation reading

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 5 Parts, Materials, and Processes EEE Parts –Status of GASU Box Level Parts Qualification, Rev. C (highlighted yellow items=part approved, not in use): Some columns have been hidden to assist in presentation reading

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 6 Parts, Materials, and Processes EEE Parts, cont’d –Status of GASU CCA Parts Qualification, Rev. Q (highlighted yellow items=part approved, not in use): Some columns have been hidden to assist in presentation reading

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 7 Parts, Materials, and Processes EEE Parts, cont’d –Status of GASU CCA Parts Qualification, Rev. Q, cont’d (highlighted yellow items=part approved, not in use): Some columns have been hidden to assist in presentation reading

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 8 Parts, Materials, and Processes EEE Parts, cont’d –Status of GASU PS CCA Parts Qualification, Rev. H (highlighted yellow items=part approved, not in use): Some columns have been hidden to assist in presentation reading

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 9 Parts, Materials, and Processes Materials –All Materials have been approved by the Program MPRB in accordance with LAT-SS-00107, LAT Mechanical Parts Plan GLAST/LAT Material Usage Agreement #002 (MAR DID No. 313; LAT Document # LAT-TD )- Approved 9/13/04 Processes –All processes have been reviewed and approved by the Program MPRB in accordance with LAT-SS , LAT Mechanical Parts Plan

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 10 Procurement Status Assembly Subcontractor –Aeroflex, Inc., Colorado Springs, Colorado was awarded the contract to provide the assembly service and CCA level thermal cycling for the PDU and GASU (Reference LAT-PS-04171, SOW LAT PDU and LAT-PS-03081, SOW LAT GASU) EEE Parts –All EEE parts are SLAC furnished and have been procured for the PDU and GASU –Outstanding receipt of Omnirel Regulator expected 2/25/05 »Part no. OMR9604SCK Miscellaneous Subassemblies –Internal harness and cable assemblies due ~ 3/14/05 Metal Fab Parts and Fasteners –All Metal Fab parts and Fasteners are SLAC furnished and have been procured and received for the PDU and GASU PWBs –The PWBs for PDU and GASU are SLAC furnished and have been procured and received. Coupons for boards being used for flight have all successfully passed testing.

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 11 Procurement Status FPGA Programming –Programming of the FPGAs has been contracted to ACTEL and is complete for 1 box each PDU and GASU. Remaining parts will be programmed after some level of confidence testing of the first article CCAs. Materials –Assembly shop floor materials are furnished by Aeroflex in accordance with drawing and SOW requirements (adhesives, conformal coating, wire, primer, etc.)

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 12 Manufacturing Facilites Assembly contract has been awarded to Aeroflex, Inc., located in Colorado Springs, Colorado –Aeroflex specializes in the Manufacturing of Micro Electronic and Circuit Card assemblies. Aeroflex fabricates assemblies for aerospace, defense and commercial applications. They are an ISO 9001 (DSCC) certified company, founded in 1990 which merged with UTMC in 1996 A Quality Survey and Process Review was was conducted by SLAC and NASA Product Assurance on January 26, 2005 –Certifications / Qualifications: - ASQ Rocky Mountain Quality award - ISO 9001:2000 certified by the Defense Supply Center, Columbia –Aeroflex performs to the intent of the following documents, assuring Quality and Workmanship Acceptability: MIL-STD-2000A IPC-A-610 CLASS 3 MIL-PRF IPC/EIA J-STD-001C NASA 8739 series NHB 5300 MIL-STD-1686 MIL-HDBK-263 EIA-625 ANSI/ESD S

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 13 Manufacturing Facilites

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 14 Manufacturing Facilites

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 15 Manufacturing Facilites

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 16 Manufacturing Facilites

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 17 Manufacturing Process Flow-Aeroflex

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 18 Manufacturing Process Flow-Aeroflex

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 19 Manufacturing Process Flow-Aeroflex

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 20 Manufacturing Process Flow-Aeroflex A flow similar to PDU for GASU is under construction –All routers will be reviewed and approved by SLAC prior to production start

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 21 Configuration Management Required changes to documentation during the manufacturing phase at Aeroflex will be immediately documented on an NCMR and forwarded to SLAC for disposition All outstanding changes to documents will be incorporated and a new revision released into LAT DOCs prior to final inspection at each manufacturing level (CCA, Module)

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 22 Configuration Management All change notices will include full disposition of hardware Disposition of Hardware

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 23 Thermal Cycle Requirements at CCA Level Figure 1. Vibration Levels, Duration, and Spectra

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 24 PDU/GASU Qualification and Acceptance Test Matrix

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 25 Production Schedule

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 26 Production Schedule

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 27 Production Schedule

GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 28 Production Schedule