ARINC PROPRIETARY Long Range Satellite Communications Prepared for SOCM/2 February 8 -10, 2012.

Slides:



Advertisements
Similar presentations
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Advertisements

Federal Aviation Administration Agenda Item 2.2: Post-Implementation Analysis of Data Link Performance Following Release 15 (R15) Ground Earth Station.
Using the Self Service BMC Helpdesk
HP OpenView Network Node Manager
Copyright © 2006 Help Desk Systems, Inc. All rights reserved. Overview of Help Desk Systems Inc. (HDSI) HDSI offers a hosted, web based trouble ticket.
Prepared by the Virginia Department of Criminal Justice Services PTCC …the future of case management DCJS presents:
International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012.
E-Nomination – Electronic procedure for the nomination of exchange students.
Knowledge Pathways in IT
Data-link Elements and Role of Stakeholders – Reflections of an ANSP
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2014.
CCNA – Network Fundamentals
Ensuring the Reliability of Data Delivery © 2004 Cisco Systems, Inc. All rights reserved. Establishing a TCP Connection INTRO v2.0—6-1.
Chapter 7 – Transport Layer Protocols
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy February 2015.
EEC-484/584 Computer Networks Lecture 6 Wenbing Zhao
William Stallings Data and Computer Communications 7 th Edition (Selected slides used for lectures at Bina Nusantara University) Error Control.
Customer Relationship and Contact Management Software Demonstration: Contact Management Process.
1Welcome TNKids Financials TNKids Financial System Changes to Placement Change Notification Computer-Based Training EXIT.
1 Modified_ CIRCUIT PROTECTION SOLUTIONS Confidential and Proprietary to Littelfuse, Inc. ® Littelfuse, Inc All rights reserved. February,
Copyright © Yokogawa Electric Corporation 13 th February Exaquantum R2.70 Enhancements.
NITAAC Customer Support Phone: Website: NITAAC.nih.gov Customer Guide for using the electronic Government.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for Security.
INCIDENT MANAGEMENT (SERVICE REQUESTS) WebDesk Training.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Slide 1 of 19 Welcome to GSA’s Vendor and Customer Self Service (VCSS) course Section 7: Correspondence Navigation This presentation is compliant with.
April 9, No. 5. Agenda Welcome & Purpose Agenda Communications School Websites OneClay Portal Social Media Notification System Applications Focus.
Welcome to the official tour of TrainingEvals.com SM !
Welcome and Orientation Find dates an easy way… Click on one carat-go back one month, click on two carats-go back one year. Hold on box & slide.
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy September 2014.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
Voice Mail Options Unified Messaging Voice Mail Web Browser David Howard Les Cottrell August SCCS Managers’ Meeting.
Welcome to the Winter Training Series Today we will be focusing on Campaign actions – the basics.
EVON TAN KA VUN THECLA JOSEPH NOR FAEEZA ISMALI JESSICCA TOKIROI.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
DCIT / Media Management Session FAA DataComm – OTA FANS Validation Airbus FANS comm media management 17 Nov 2011Airbus FANS comm media management Presented.
GTR Data Inc. Welcome to our EDI Demonstration G.T.R. Data Inc. August 1997.
© 2006 Cisco Systems, Inc. All rights reserved.1 Connection 7.0 Serviceability Reports Todd Blaisdell.
TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto.
Data Link and Flow Control Networks and Protocols Prepared by: TGK First Prepared on: Last Modified on: Quality checked by: Copyright 2009 Asia Pacific.
Jan 2015 iServ OfficeServ Operator Essential for business operators, receptionists, and people who manage high volume on calls, the iServ OfficeServ Operator.
Retail Market Messaging Incident Report 1. Agenda Recap of integrated market messaging system Incident Overview Current Status Incident Observations Next.
Student Experience Survey (SES) 2015 Preparations Quality Indicators for Learning and Teaching.
MyFloridaMarketPlace Vendor Performance Tracking Overview: Vendor Interface February 23, 2006.
WGW update Aug FY-2007 EmpowHR Performance Summary Rating Process.
Your Trusted Adviser Minimizing Risk Maximizing Your Value Quality Management for Procurement with Vendor Evaluation.
Around(J2)ME Juri Strumpflohner Matthias Braunhofer
Access to OASIS Evelyn Pidgeon OASIS Security Administrator.
9/12/2006 TPTF MIS: Messages, Alerts, Notifications Pat Harris & MIS Team A portal is a web site or service that offers a broad array of resources and.
Networks and the Internet Topic 3. Three Important Networking Technologies Networks, Internet, WWW.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Satellite Communications ● Inmarsat ● Iridium ● Globalstar & Spot ● Thuraya ● Orbcomm Images from
ACARS Media Management Prepared for DCIT #23 Systems Integration Working Group.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 A Look at the Application Authorized users can access Communicator! NXT from any Internet-capable computer via the Web.
Lesson 17 Mail Merge. Overview Create a main document. Create a data source. Insert merge fields into a main document. Perform a mail merge. Use data.
Call Center Support Process Web Support & Maintenance for BGC Partners Version 1.1 June 3, 2016 Notice: The enclosed material is proprietary to TRIZE Consulting.
ACAP Online Application Process
Satellite Data-Link Communication Seminar
Chopping and Releasing HAZREPs
SOCM/2 IP/nn Attachment A Bangkok, Thailand 8-10 February 2012
Welcome to the world of CRISIS COMMANDER
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Long Range Satellite Communications
Reliance Supplier Corrective Action Process
Process of cst-registration
OneSupport Help Center (OSHC) Training
14 Bin location management
Presentation transcript:

ARINC PROPRIETARY Long Range Satellite Communications Prepared for SOCM/2 February 8 -10, 2012

Page 2 Agenda 1. Long Range Satellite Communications – Overview 2. Long Range Communications – SATCOM 3. Long Range Communications – SATCOM  Enhancements  Impairments/Outages 4. Long Range Communications Performance  SATCOM ALL (CPDLC)  SATCOM I3 (CPDLC)  SATCOM I4 (CPDLC)  SATCOM ALL (ADS)  SATCOM I3 (ADS)  SATCOM I4 (ADS)  IRIDIUM (CPDLC)  IRIDIUM (ADS) 5. Common Maintenance Reporting Procedure

Page 3 Long Range Satellite Communications - Overview  The following slides consist of performance for ARINC’s Long Range Communications Media.  Included are performance for both CPDLC and ADS from January 15, 2011– January 15,  The following categories are included in this presentation  SATCOM  IRIDIUM

Page 4 Long Range Communications - SATCOM  The following slides show the performance for I3 & I4 SATCOM services as a whole and segregated.  Both CPDLC and ADS performance are included.

Page 5 Long Range Communications – SATCOM Summary  Enhancements  I4 SATCOM fielded 4Q 2009  Several Inmarsat I4 SATCOM Software upgrades fielded in 2010 – 2011  ARINC ACARS system upgrade completed Aug 2011  Vizada I3 Upgrade at Santa Paula Jan 2012  Impairments/Outages  Several Telco hits  POR issue

Page 6 Long Range Communications – SATCOM All (CPDLC)  For both I3 and I4 networks. Delivery time is between the receipt of block and successful aircraft acknowledgement of block; includes time required for re-transmissions.  Performance > Goal of delivering 95% of first block of message within 60secs

Page 7 Long Range Communications – SATCOM I3 (CPDLC)  For I3 network. Delivery time is between the receipt of block and successful aircraft acknowledgement of block; includes time required for re-transmissions.  Performance > Goal of delivering 95% of first block of message within 60secs

Page 8 Long Range Communications – SATCOM I4 (CPDLC)  For I4 network. Delivery time is between the receipt of block and successful aircraft acknowledgement of block; includes time required for re-transmissions.  Performance > Goal of delivering 95% of first block of message within 60secs

Page 9 Long Range Communications – SATCOM All (ADS)  For both I3 and I4 network. Delivery time is between the receipt of block and successful aircraft acknowledgement of block; includes time required for re-transmissions.  Performance > Goal of delivering 95% of first block of message within 60secs

Page 10 Long Range Communications – SATCOM I3 (ADS)  For I3 network. Delivery time is between the receipt of block and successful aircraft acknowledgement of block; includes time required for re-transmissions.

Page 11 Long Range Communications – SATCOM I4 (ADS)  For I4 network. Delivery time is between the receipt of block and successful aircraft acknowledgement of block; includes time required for re-transmissions.

Page 12 Long Range Communications – IRIDIUM (CPDLC)  Compared to the SATCOM services of I3 & I4, the data set is very small for the January 15, January 15, 2012 time period.

Page 13 Long Range Communications – IRIDIUM (ADS)  Compared to the SATCOM services of I3 & I4, the data set is very small for the January 15, January 15, 2012 time period.

Page 14 Common Maintenance Reporting Procedure 1. ARINC receives notification from our vendor that an activity is going to take place or if we are performing an activity 2. ARINC fills out the template as shown below. AAM ARINC Advisory Message We would like to inform you that ARINC maintenance work needs to be carried out according to the following: Service(s): Trouble Ticket/Change Order #: Maintenance Location: Maintenance Window: Expected Outage Duration: Description of Maintenance: ARINC SERVICE DESK US & INT'L ACCESS (Sprint) FAX HDQHDXA

Page 15 Common Maintenance Reporting Procedure – Cont’d 3. ARINC Helpdesk forwards to the appropriate mailing list. 4. In some cases, Helpdesk is notified directly that a maintenance activity or outage is going to occur or is in progress. They will then automatically generate an advisory and send it out to the appropriate mailing lists.

Page 16 Thank You