Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.

Slides:



Advertisements
Similar presentations
RECORD KEEPING Cooperative Development of Operational
Advertisements

January 28, 2008 ODOT Central Office – Room 1C Post-Construction BMPs Update Meeting.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Supervision and Administration
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Operation & Maintenance Requirements: Tips for Keeping Your Agency in Compliance Kristin Kerr, P.E., QSD EOA, Inc. New Development Workshop May 22, 2013.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Wetlands and Waterways Permits Patti Caswell Statewide Wetlands/Permits Program Coordinator Geo-Environmental, ODOT.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Gwinnett County’s Post Development Stormwater Management Program
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
Article 42. – Emergency Safety Interventions ESI Regulations K.A.R and As Passed by the Kansas State Board of Education 2.
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
Old Policy – which no one ever seem to have heard of.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Construction and Demolition Inert Processing Operations Compliance First: Evaluation of Solid Waste Facilities’ State Standards Training Provided By: California.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
1 Common Issues on Site Re-certification Training For Level IB Advanced Fundamentals Certified Inspector Issued May 2009.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Erosion & Sediment Control. Wind Erosion Water Erosion.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
1 Revised Suggested Modification 3 CO-12 Prevent the disposal of animal waste, wastewater and other byproducts of human, crop-based-agricultural or equestrian.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
1 City of Shelby Environmental Management System -QUALITY ALWAYS- IT’S ABOUT THE PEOPLE Presented by: Cynthia I.Walters Presented by: Cynthia I.Walters.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
GDEM Training June 2009 Emergency Watershed Protection (EWP) Program United States Department of Agriculture Natural Resources Conservation Service.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
1 Los Angeles County Santa Monica Mountains Local Implementation Plan Malibu Santa Monica Mountains Pepperdine Univ. Topanga County Beach Leo Carrillo.
Wetland Restoration Planning considerations New Forest Consultative Panel – 3 Sept 2015.
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Storm Water Pollution Prevention Plan Development
Understanding the Section 504 Process
Acceptance Process for Manufactured Products by Certification:
Stormwater Commitments
INDOT Storm Water Management
MS4 OVERVIEW 2015.
Stream Crossing Replacement Policy
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities May 2014

Office of Environmental Planning (OEP) Water/Noise Compliance Unit Paul Corrente - Transportation Supervising Planner –Telephone No Andrew Piraneo - Transportation Planner 2 (All Districts) –Telephone No Paul Dickey – Transportation Planner 2 –Telephone No Christine Tedford - Transportation Planner –Telephone No Water/Noise Compliance Unit Paul Corrente - Transportation Supervising Planner –Telephone No Andrew Piraneo - Transportation Planner 2 (All Districts) –Telephone No Paul Dickey – Transportation Planner 2 –Telephone No Christine Tedford - Transportation Planner –Telephone No

Office of Environmental Planning (OEP) Water/Natural Resources Unit Andrew Davis - Transportation Supervising Planner –Telephone No Kevin Carifa - Transportation Planner 2 –Telephone No Ryan Apanovitch – Transportation Planner 2 –Telephone No Chris Samorajczyk - Transportation Planner –Telephone No Amanda Saul - Transportation Planner –Telephone No Michael Salter – Transportation Planner –Telephone No Water/Natural Resources Unit Andrew Davis - Transportation Supervising Planner –Telephone No Kevin Carifa - Transportation Planner 2 –Telephone No Ryan Apanovitch – Transportation Planner 2 –Telephone No Chris Samorajczyk - Transportation Planner –Telephone No Amanda Saul - Transportation Planner –Telephone No Michael Salter – Transportation Planner –Telephone No

Environmental Permit Training Environmental Permit Compliance Drainage Maintenance Plan Policy/Procedures Enforcement Inspections Closing, Comments, and Questions Environmental Permit Compliance Drainage Maintenance Plan Policy/Procedures Enforcement Inspections Closing, Comments, and Questions

Environmental Permit Compliance Drainage Maintenance Plan Authorized Activities Regulated activities for Inland wetlands and watercourses only. Not authorized for regulated activities within the Coastal Areas. General Conditions Reporting Coordination Drainage Maintenance Plan Authorized Activities Regulated activities for Inland wetlands and watercourses only. Not authorized for regulated activities within the Coastal Areas. General Conditions Reporting Coordination

Environmental Permit Compliance

Drainage Maintenance Plan Authorized Activities (GPCST ) Towns covered under this authorization: AnsoniaBeacon Falls BethelCromwell DanburyDerby DurhamEast Windsor EnfieldHartford HarwintonKent MiddlefieldMiddletown Naugatuck New Canaan New MilfordNorth Canaan NorwichOrange PortlandRedding RidgefieldRocky Hill SalisburySeymour SharonShelton South WinsorSprague SuffieldThomaston TorringtonWaterbury WethersfieldWilton WindhamWindsor Locks Towns covered under this authorization: AnsoniaBeacon Falls BethelCromwell DanburyDerby DurhamEast Windsor EnfieldHartford HarwintonKent MiddlefieldMiddletown Naugatuck New Canaan New MilfordNorth Canaan NorwichOrange PortlandRedding RidgefieldRocky Hill SalisburySeymour SharonShelton South WinsorSprague SuffieldThomaston TorringtonWaterbury WethersfieldWilton WindhamWindsor Locks

Drainage Maintenance Plan Authorized Activities (GPCST ) 1.Excavation of accumulated sediment or removal of brush or debris from within 50 feet of the inlet and outlet sides of a drainage pipe, culvert or bridge within the DOT Drainage Right-of-Way.  Any sediment, brush, or debris generated by removal activities must be disposed of at a DOT approved upland disposal site.  Low flow channels shall be maintained in existing condition to maintain natural substrate. Only brush and debris impeding flow can be removed.  Beaver Dam removal is included under this activity but must be coordinated with OEP prior to commencing work. 2.Cleaning or Reshaping of man-made drainage way or sediment basin 3.Installation or repair of a culvert or bridge end wall 1.Excavation of accumulated sediment or removal of brush or debris from within 50 feet of the inlet and outlet sides of a drainage pipe, culvert or bridge within the DOT Drainage Right-of-Way.  Any sediment, brush, or debris generated by removal activities must be disposed of at a DOT approved upland disposal site.  Low flow channels shall be maintained in existing condition to maintain natural substrate. Only brush and debris impeding flow can be removed.  Beaver Dam removal is included under this activity but must be coordinated with OEP prior to commencing work. 2.Cleaning or Reshaping of man-made drainage way or sediment basin 3.Installation or repair of a culvert or bridge end wall

Drainage Maintenance Plan Authorized Activities (GPCST ) 4.Repair of erosion damage (repair of riprap areas).  Areas were riprap will be placed shall first be accurately shaped, with bedding material installed where required.  In perennial streams, rounded stone/parent material shall be placed over the riprap to a depth of 6”.  Riprap placement shall be minimized to the greatest extent practicable  Maximum of 50 cubic yards shall be placed within the wetland or watercourse limits. 4.Repair of erosion damage (repair of riprap areas).  Areas were riprap will be placed shall first be accurately shaped, with bedding material installed where required.  In perennial streams, rounded stone/parent material shall be placed over the riprap to a depth of 6”.  Riprap placement shall be minimized to the greatest extent practicable  Maximum of 50 cubic yards shall be placed within the wetland or watercourse limits.

Drainage Maintenance Plan Authorized Activities (GPCST ) 5.Repair of a drainage pipe, culvert, or bridge.  Sleeving is allowed for DRAINAGE only. Not allowed for pipes carrying a watercourse  Temporary placement of fill within the wetland or watercourse limits is authorized for up to 50 cubic yards.  Crane mats may be placed within a wetland for up to 50 feet in length.  Debris shields must be used.  All temporary impacts must be restored to original conditions upon completion of the work. 5.Repair of a drainage pipe, culvert, or bridge.  Sleeving is allowed for DRAINAGE only. Not allowed for pipes carrying a watercourse  Temporary placement of fill within the wetland or watercourse limits is authorized for up to 50 cubic yards.  Crane mats may be placed within a wetland for up to 50 feet in length.  Debris shields must be used.  All temporary impacts must be restored to original conditions upon completion of the work.

Drainage Maintenance Plan Authorized Activities (GPCST ) 6.Replacement of a culvert or bridge which receives drainage from a watershed of one sq. mile or less; provided any such activity is accomplished within 3 days or less and does not involve placement of more than 50 cubic yards of fill into wetlands or watercourses.  Bridge Safety Inspection must indicate replacement is warranted.  In kind replacement with no significant change to size or location of the structure.  Contributing watershed must be less than 1 square mile. 6.Replacement of a culvert or bridge which receives drainage from a watershed of one sq. mile or less; provided any such activity is accomplished within 3 days or less and does not involve placement of more than 50 cubic yards of fill into wetlands or watercourses.  Bridge Safety Inspection must indicate replacement is warranted.  In kind replacement with no significant change to size or location of the structure.  Contributing watershed must be less than 1 square mile.

Drainage Maintenance Plan *Authorized Activities can only occur on DOT facilities or within Rights-of-Way located in the Towns specified in the approved authorization* General Conditions No fill permitted in a FEMA Floodway. Excavated material shall be managed according to the General Permit for Contaminated Soil and/or Sediment Management. Work requirements shall conform with… Form Section CT Erosion and Sediment Control Guidelines 2004 CT Stormwater Quality Manual *Authorized Activities can only occur on DOT facilities or within Rights-of-Way located in the Towns specified in the approved authorization* General Conditions No fill permitted in a FEMA Floodway. Excavated material shall be managed according to the General Permit for Contaminated Soil and/or Sediment Management. Work requirements shall conform with… Form Section CT Erosion and Sediment Control Guidelines 2004 CT Stormwater Quality Manual

Drainage Maintenance Plan Coordination Procedures for Coverage under the Permit:  Designated Rail Engineer (TBD by the Office of Rails) shall submit a PNDF to OEP for each project. Appropriate documentation detailing the scope of work shall accompany the PNDF.  A member of OEP will review the associated documentation and verify that the activity qualifies for the DMP.  OEP shall delineate wetland and watercourse limits prior to beginning work at any location.  Designated Rail Engineer shall collect and record all pertinent information for future submittal to DEEP.  For any upland disposal sites, a request must be submitted to OEP for review and approval prior to use. Procedures for Coverage under the Permit:  Designated Rail Engineer (TBD by the Office of Rails) shall submit a PNDF to OEP for each project. Appropriate documentation detailing the scope of work shall accompany the PNDF.  A member of OEP will review the associated documentation and verify that the activity qualifies for the DMP.  OEP shall delineate wetland and watercourse limits prior to beginning work at any location.  Designated Rail Engineer shall collect and record all pertinent information for future submittal to DEEP.  For any upland disposal sites, a request must be submitted to OEP for review and approval prior to use.

Drainage Maintenance Plan Coordination Record Keeping / Reporting Need to keep track of the following permitted activities… –Date and location where each activity was completed. –Quantities of materials placed or removed as per the authorization. For example, »amount of sediment / debris removed from within 50-feet of a drainage outlet. »50-cubic yards of riprap placed along eroded slope embankment or placed for drainage outlet protection. Information shall be reported to the designated Rail Engineer, then submitted to OEP for review no later than the 15 th of January and OEP forwards to DEEP for processing in order to meet January 30 th deadline. Record Keeping / Reporting Need to keep track of the following permitted activities… –Date and location where each activity was completed. –Quantities of materials placed or removed as per the authorization. For example, »amount of sediment / debris removed from within 50-feet of a drainage outlet. »50-cubic yards of riprap placed along eroded slope embankment or placed for drainage outlet protection. Information shall be reported to the designated Rail Engineer, then submitted to OEP for review no later than the 15 th of January and OEP forwards to DEEP for processing in order to meet January 30 th deadline.

Enforcement Inspections Site Inspections will Occur: OEP site inspection Engineer from the Office of Rails (TBD) site inspection DEEP site inspection (typically unannounced) Inspection consists of: –Site Inspection Report to Office of Rails personnel on status of compliance (BMPs and measurable goals) Office of Rails response to Site Inspection Report Follow up Site Inspection for compliance Site Inspections will Occur: OEP site inspection Engineer from the Office of Rails (TBD) site inspection DEEP site inspection (typically unannounced) Inspection consists of: –Site Inspection Report to Office of Rails personnel on status of compliance (BMPs and measurable goals) Office of Rails response to Site Inspection Report Follow up Site Inspection for compliance

Enforcement Inspections Complaints received from DEEP or by telephone to Department: Investigate and address problem (if applicable). Follow up with DEEP or internally within the Department. Direct follow up with complainant. Department Responsible to Record and Report Permit Violations: Notify DEEP Commissioner in writing within 48 hours. –Provision(s) of general permit violated –Date / time violation discovered and by whom –Cause of violation –Timeline required to correct violation and mitigate results –Steps necessary to prevent reoccurrence of the violation(s) and implementation date Failure to comply: –Notice of Violation (NOV) or Consent Orders (CO) Complaints received from DEEP or by telephone to Department: Investigate and address problem (if applicable). Follow up with DEEP or internally within the Department. Direct follow up with complainant. Department Responsible to Record and Report Permit Violations: Notify DEEP Commissioner in writing within 48 hours. –Provision(s) of general permit violated –Date / time violation discovered and by whom –Cause of violation –Timeline required to correct violation and mitigate results –Steps necessary to prevent reoccurrence of the violation(s) and implementation date Failure to comply: –Notice of Violation (NOV) or Consent Orders (CO)

Closing, Comments, and Questions Comments & Questions

THANK YOU