Project Management Concept Selection of Design Team – Step 3 Design Phase – Step 4 June 2015 Final PD Training FMD WUSM 6/15/15 1.

Slides:



Advertisements
Similar presentations
1 Solicitations/Advertisements Solicitations/Advertisements
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Effective Contract Management Planning
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
Roadmap for Sourcing Decision Review Board (DRB)
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Needs Development – Step 1 Scope Development – Step 2
The Camp Audit “Keep your friends close and your auditor closer”
Selection of Contractor – Step 5 June 2015 Final PD Training FMD WUSM 6/15/15 1.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Manage Deliverables - Construction – Step 6
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Project Kick-Off Meeting for with Project Manager Name,
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
PMP® Exam Preparation Course
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
9 Closing the Project Teaching Strategies
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
FIRST 5 LA Baby-Friendly Hospital Project New Contractor Orientation September 20, 2011.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Monitoring & Oversight Adult Education and Literacy (AEL) Programs Brenda B. Williams Project Manager Texas Workforce Commission Regulatory Integrity Division.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project Life Cycle.
Contract Training Class I
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Project Delivery Business Operations Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Implementing Program Management Standards at Duke Energy.
Construction Management At Risk Process
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Contract Compliance Training
Project Management PTM721S
Processes and Procedures for Contracting at UO
CONTRACT ADMINISTRATION
Processes and Procedures for Contracting at UO
Award Management Services
TechStambha PMP Certification Training
Joint Parking Task Force Update Procurement & Strategic Sourcing
Contract Compliance Training
Department of Community Development
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
Request for Proposal and Specifications for
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Request for Proposal and Specifications for
Solicitation Step by Step Process
Controlling Project Cost and Schedule
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Presentation transcript:

Project Management Concept Selection of Design Team – Step 3 Design Phase – Step 4 June 2015 Final PD Training FMD WUSM 6/15/15 1

Planner/Project Management Concept Step 1: Needs Development Step 2: Scope Development Step 3: Selection of Design Team Step 4: Design Phase Step 5: Selection of Contractor Step 6: Construction Phase Step 7: Transition, Activation and Closeout Wrap-Up Summary Q & A Final PD Training FMD WUSM 6/15/15 2

Step 3 and 4: Selection of Design Team and Design Phase Step 3: Selection of Design Team Direct Select Request for Proposal (RFP) Step 4: Design Phase Schematic Design Design Development Construction Documents Final PD Training FMD WUSM 6/15/15 3

Step 3: Selection of Design Team At the beginning of this step, the project already has received all customer endorsements, approvals, and funding authorizations. Choose selection method (direct select or RFP) Follow documented process Selection & award Approval and Reporting Negotiate Contract Complete Contracts Prepare for next phases Final PD Training FMD WUSM 6/15/15 4

Step 3: Selection of Design Team Qualification based process The two primary methods of procuring these services are: –Direct Select –Request for Proposal (RFP) process Commissioning agent selection and other services (as applicable) procurement should occur in parallel Final PD Training FMD WUSM 6/15/15 5

Step 3A: Direct Select Architect/Engineer – Informal Process Washington University has identified candidates for Architects/Engineers (A/E) on a document entitled Architects/Engineers for Project Selection – Danforth and School of Medicine. WUSM has an additional document entitled Architect/Engineer Listing and Evaluations. In the case of large complex or specialized projects, the School of Medicine may do a Request for Qualifications to ensure the proper selection. This should be discussed with the Assistant Vice Chancellor/Assistant Dean of Facilities at the start of the project, as applicable.Architects/Engineers for Project Selection – Danforth and School of MedicineArchitect/Engineer Listing and Evaluations Final PD Training FMD WUSM 6/15/15 6

Step 3A: Direct Select Architect/Engineer – Informal Process Selection and Award ‒ The Planner/PM shall review and evaluate (1) the qualifications of the candidate A/E in the context of the scope of work to be performed, (2) the cumulative dollar value of current projects the candidate for A/E has with the University, and (3) past performance and (4) ability to meet schedule. The Planner/PM should consult with other Planner/SPM/PMs for technical expertise during the evaluation. ‒ The Planner/PM shall rank the A/E and submit the recommendation, inclusive of written justification, to his/her Director for approval or rejection. Approval ‒ The Director shall review and accept or reject the Planner/PMs recommendation. ‒ If accepted, approval is given to the Planner/PM to proceed with obtaining a proposal from the Architect utilizing the University Fee Schedule. ‒ If rejected, the Director shall identify the next best choice recommendation and provide justification to the Planner/PM. ‒ In the event the Planner/PM is unable to obtain a proposal from the selected A/E within the guidelines of the University Fee Schedule or through agreed-upon justifiable fee/scope modifications that may differ from the fee schedule, the Planner/PM shall work with the next identified A/E until a proposal is deemed acceptable. ‒ Following successful receipt of a fee proposal from the A/E, the Planner/PM shall provide Business Operations with the approved proposal and required documents under the Contracts Checklist in order for Business Operations to prepare the appropriate Standard Form of Agreement, which vary by service type but include the following: between Owner and Architect, between Owner and Engineer and between Owner and Consultant.Contracts Checklist Final PD Training FMD WUSM 6/15/15 7

Step 3B: Request for Proposal (RFP) RFP Preparation ‒ The Planner/PM begins by preparing a Request for Proposal (RFP) outlining the project scope, the services needed, and selection criteria.Request for Proposal (RFP) ‒ The RFP is reviewed by the Director of Capital Projects before it is sent to Resource Management. Planner/PM identification and recommendation of the Selection Committee (SC), with a minimum of seven (7) members, is forwarded along with the RFP draft. The Planner/PM incorporates any edits to the RFP. This selection committee is only used for projects over $4 million. ‒ The Planner/PM then works with the Director of Capital Projects to formalize the preliminary list of firms based on a review of the WU Architects/Engineers for Project Selection and the WUSM Architect/Engineer Listing and Evaluations forms.WUSM Architect/Engineer Listing and Evaluations forms Final PD Training FMD WUSM 6/15/15 8

Step 3B: Request for Proposal (RFP) RFP Submission ‒ Planner/PM forwards to Resource Management for final review and then the document is sent out by the Planner/PM to the selected firms. ‒ The Planner/PM conducts a pre-submittal conference and the Planner/PM should utilize a pre- submittal agenda to outline all agenda items and responses to questions, as applicable during the proposal period. The Planner/PM is to perform meeting logistics. After deadline for questions, the Planner/PM issues a final response to incorporate all pre-submittal questions per the time frame noted in the RFP. ‒ After the proposals are received, the Planner/PM will enter the evaluation criteria responses into a matrix for use in evaluating each proposal. ‒ The Planner/PM along with the Director of Capital Projects sends a short list recommendation to Assistant Vice Chancellor/Assistant Dean of Facilities (AVC) who in turn forwards to the Vice Chancellor of Administration and Finance (VC) for approval. A recommendation memo form should be utilized and becomes part of the project record.recommendation memo form ‒ Upon response of approval or recommended action, Planner/PM will perform logistics and create interview schedule, addenda and questions. The Planner/PM will notify shortlisted firms of the interview date, time, and location. Planner/PM and SC develop the interview weighted evaluation criteria. A copy of the questions and interview criteria must be sent to SC and shortlisted firms prior to the interview. Final PD Training FMD WUSM 6/15/15 9

Step 3B: Request for Proposal (RFP) Interview and Selection ‒ After the interview, the SC scores the interviewed firms based on presentation and submits their evaluation to the Planner/PM. The interview scoring and evaluation of short-listed firms are based on information submitted by respondents at interviews in conjunction with the interview selection criteria. The Planner/PM calculates results and presents the scoring matrix to the Director of Capital Projects. The Director and the AVC review the matrix and make award recommendation to the VC for final approval. ‒ The Planner/PM will request a Fee Proposal in accordance with the WUSTL fee schedule from the selected firm (typically no more than 10 days after notification). The proposal and summary will include:WUSTL fee schedule ‒ Statement of their understanding of the project, including their understanding of project budget, school and customer goals, and security requirements and concerns ‒ Detailed description of their project management, control, and delivery approach for the project ‒ List of sub-consultants ‒ Preliminary project schedule ‒ Proposed services (basic and additional), fees requested, and reimbursable expenses based on the WU Definition of Basic Services and Additional Services. ‒ Required forms for the Standard Forms of Agreement contract utilizing the Contracts Checklist from Business Operations (including insurance certificate) if applicableContracts Checklist ‒ Keep in mind the fee schedule is a guideline and should be adjusted accordingly to support the project deliverables, whether that means lower due to not all basic services needed or upward for supplemental services needed. Final PD Training FMD WUSM 6/15/15 10

Step 3B: Request for Proposal (RFP) Complete Contracting ‒ In addition to the contract, the following documents must be submitted by the Planner/PM: Workers Compensation Certificate Employers Liability Professional Liability Insurance Commercial General Liability Comprehensive Auto Insurance Umbrella Coverage Specific coverage amounts can be found in the appropriate contract ‒ Upon receiving all checklist items, Business Operations will prepare the contract for Planner/PM review. After their review and approval, Business Operations will electronically send the contract to the A/E for signature. ‒ Contracts are first signed by the A/E and submitted to Business Operations via , mail or courier. Business Operations prepares contract for WUSM signature process and routes to all applicable internal levels. See Sub- Delegation of Signature Authority for signature authorization levels. If for any reason, contract approvals are not achieved, the contract will be re-routed for modifications or will be canceled and closed as applicable to the situation. If for any reason there are edits to any original documentation, they must be initialed by all parties.Sub- Delegation of Signature Authority Final PD Training FMD WUSM 6/15/15 11

Step 3B: Request for Proposal (RFP) Selection Process – Other Consultants ‒ Similar processes are followed for any other special consultants desired for a project or study. Other special consultants include but are not limited to services for: Commissioning Geotechnical Services Special Testing and Inspection Phase I/II Environmental Assessment Asbestos Consulting Services Programming Testing and Balancing ‒ Please note, University rules also apply to the selection of other consultants. For example if the estimate for the contract amount of these services is over $25,000, three bids must be solicited. Final PD Training FMD WUSM 6/15/15 12

Step 3B: Request for Proposal (RFP) Emergency Services ‒ For emergency services, the University currently is putting a contract in place for full emergency response and restoration services. Once the contract is in place the responding supervisor, planner or PM should follow the FMD emergency protocol and contract directly with the selected contractor to mitigate, assess and restore the damaged facilities. Until the contract is in place we will work to mitigate emergency situations using internal staff and available contractors on an as needed basis. Wherever possible we will follow the Project Delivery process but in cases of extreme emergencies we may be required to sole source response services to ensure business continuity. Final PD Training FMD WUSM 6/15/15 13

Step 3B: Request for Proposal (RFP) Contract Design Service Change Orders – Professional Services ‒ If a change to the signed Standard Form of Agreement is required, the process to prepare a Change Order Request is initiated by the A/E. The A/E submits a request in writing to the Planner/PM outlining the proposed scope of work revisions and applicable adjustments to the fees and/or reimbursables. The Planner/PM should work with the A/E to discuss the scope of work and negotiate the fees for the proposed design change. Upon approval, the Planner/PM directs Business Operations to issue a change order adjusting the scope and contractual fee. ‒ Change orders must be tracked by type (see type memo) and reported at the close of the project. Errors and Omissions that are the responsibility of the AE should not receive supplemental fee or compensation.see type memo Final PD Training FMD WUSM 6/15/15 14

Step 3B: Request for Proposal (RFP) Project Closeout ‒ At the conclusion of a project, the Planner/PM or equivalent shall provide a post-performance evaluation of the A/E’s actual performance as compared to the intent of the project requirements in order to update the A/E Listing and Evaluations document. The evaluation shall also document any significant changes in business profile, status and/or practices.A/E Listing and Evaluations document ‒ On a quarterly basis, the Director of Capital Projects shall evaluate the A/E activity reports, and applicable post- performance evaluations, to determine whether each A/E’s engagement with the School continues to provide the ‘best value’ to the School. Final PD Training FMD WUSM 6/15/15 15

Step 3: Selection of Design Team Questions / Discussion Final PD Training FMD WUSM 6/15/15 16

Step 4: Design Phase At the beginning of this step, the project already has A/E or professional team selected and contracted. Design Kick off & Chartering Program verification Field investigation and environmental SD - DD -CD Prep & Review Validate other design elements Final document review and approval Final PD Training FMD WUSM 6/15/15 17

Step 4: Design Phase Continuously monitoring the scope of work being designed and comparing it to the scope of work planned and budgeted is critical. The Planner/Project Manager proactively ensures that the project meets expectations within the defined constraints, including delivering a project on time and on budget. As a result of managing deliverables, change may be deemed necessary. All designs should adhere to the WUSM Design Guidelines and Standards. Any variance must be presented and approved by the Physical Planning and Capital Projects Team and a signed variance form must become part of the project record.WUSM Design Guidelines and Standards Final PD Training FMD WUSM 6/15/15 18

Step 4: Design Phase Design and Project Kick-off meeting ‒ Defines roles and responsibilities, gain endorsement of work plan, and charter the project team ‒ Agenda should be prepared and distributed in advance. Within 3 days, meeting minutes should be completed with list of attendees, discussion points, conclusions, and action items. These are necessary for proper documentation and communication. ‒ Topics to include scope, schedule, budget, site, reporting, safety, permitting, etc. Charter the team (combined with kick off meeting) ‒ Structured process to guide the project team through defining itself: purpose, critical success factors, goals, roles, responsibilities, operating guidelines, interpersonal behaviors for assuring high quality performance. ‒ Teams involved: Project team, executive team, stake holders team, friends and neighbors, programmatic and technical committees ‒ Chartering addresses procurement, communications, and change management (scope creep, level of effort, quality creep, new technology/tools, and staffing) Final PD Training FMD WUSM 6/15/15 19

Step 4: Design Phase Charter the team Cont. ‒ Budget and variance from the design standards and guidelines should be brought to the attention of the Physical Planning and Capital Projects Team for review and approval. ‒ Charter has to be endorsed (written endorsement) by all the participants of the chartering session (including the customer). Some politically sensitive or highly visible projects may need additional endorsements by key members of University management or stakeholders ‒ It may be necessary to review the charter and revise the work plan as the project progresses Program of Requirements (POR) ‒ POR needs to be up to date in every aspect and continue representing University’s needs ‒ Schematic Design (SD) cannot begin until POR and proposed budget has been verified and approved Final PD Training FMD WUSM 6/15/15 20

Step 4: Design Phase Schematic Design (SD) Phase ‒ SD evaluates several options and determines general scope, preliminary design, scale, relationship among the project components and environment ‒ SD incorporates the master plan, project goals and University goals ‒ In SD expectations are set, project budget, and schedules are established SD deliverables ‒ Includes site drawings, floor plans, elevations, building sections, equipment and furniture layouts, updated project schedule, project cost, life cycle cost analysis and project specifications SD distribution and review ‒ 90%-95% SD deliverables are distributed to the project team ‒ Review meeting is scheduled by the Planner/PM where written comments are reviewed with the A/E ‒ Prior to completion and acceptance of the SD, A/E responds to the comments in writing and submits revised materials Final PD Training FMD WUSM 6/15/15 21

Step 4: Design Phase Design Development (DD) Phase ‒ DD develops the project in a greater details while refining the SD scope previously approved ‒ Building systems, equipment, fire protection, MEP systems, IT/Telecom are designed and coordinated through enlarged scale, drawings, plans, and elevations ‒ In DD A/E graphically demonstrates and communicates the complete project concept. Any change in scope after this phase will incur negative budget and schedule impacts DD deliverables ‒ Includes updated drawings, floor plans, elevations, building sections, equipment and furniture layouts, updated project schedule, updated project cost, final life cycle cost analysis, schedules, and project specifications DD distribution and review ‒ 50% DD deliverables are distributed to the project team ‒ Review meeting is scheduled by the Planner/PM where written comments are reviewed with the A/E. Prior to completion and acceptance of the DD, A/E responds to the comments in writing and submits revised materials Final PD Training FMD WUSM 6/15/15 22

Step 4: Design Phase Construction Documents (CD) Phase ‒ CD is the last stage of design and provides comprehensive and fully developed construction drawings and specifications to be used as bid documents for various trades, to determine final construction cost and to obtain necessary permits fining the SD scope previously approved ‒ Any change in scope in this phase will incur negative budget and schedule impacts CD interim review ‒ 50% interim review and 90%-95% reviews are completed for constructability and for identification of conflicts or issues ‒ Review meeting is scheduled by the Planner/PM where written comments are reviewed with the A/E. Prior to completion and acceptance of the CD, A/E responds to the comments in writing and submits revised materials ‒ When the Planner/PM verifies that all comments are addressed and issues resolved, the Director of Capital Projects or equivalent signs the cover sheet and the project is ready for bidding Final PD Training FMD WUSM 6/15/15 23

Step 4: Design Phase Other design elements required ‒ Plan approval and permits ‒ SDI Final PD Training FMD WUSM 6/15/15 24

Step 4: Design Phase Questions / Discussion Final PD Training FMD WUSM 6/15/15 25