YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT NETWORK AND BLOCK DIAGRAMS.

Slides:



Advertisements
Similar presentations
Precedence Diagramming
Advertisements

WBS: Lowest level OBS: Lowest level
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
Management & Development of Complex Projects Course Code - 706
Project Management. What is a Project? One Time Effort Identifiable Start/End Points Specific Objectives Multiple Tasks Resources from Across the Organization.
Importance of Project Schedules
Roberta Russell & Bernard W. Taylor, III
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Drawing AOA and AON networks
Chapter 5 Planning. 222 Learning Objectives  Clearly define the project objective  Develop a work breakdown structure  Develop a network diagram 
Workshop-3 Gantt and Pert Chart.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Network Scheduling : Precedence Diagram Method
HIT241 - TIME MANAGEMENT Introduction
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
Edward B. Farkas, Managing Director, Project Management Practice
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 3 Managing the Information Systems Project
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning 1. Statement of work: written description of what is to be done 2. All activities are identified. Activity = job that requires labor,
Chapter 9 Planning. 222 Learning Objectives  clearly defining the project objective  developing a work breakdown structure  developing a network diagram.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Project Management Magister Desain Universitas Komputer Indonesia.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
Project and Project Formulation and Management
6.3 Sequence Activities The process of identifying and documenting relationships between the project activities. Every activity, except the first and last,
PROJECT MANAGEMENT.
Project Management: PERT/CPM
Chapter 5: Project Time Management Doddy Prayogo, Ph.D.
Project Management Techniques
P.I.I.M.T American University of Leadership
Project scheduling Precedence diagram method & Resource scheduling
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Project Scheduling Chapter 14.
Projects: Critical Paths
CHAPTER 6 PROJECT TIME MANAGEMENT
Developing a Project Plan
Chapter 5 Planning
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Critical Path Analysis
Project Scheduling: Lagging, Crashing and Activity Networks
Drawing the AON network
Project Management (lecture)
Drawing AOA and AON networks
Project Management (lecture)
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Drawing AOA and AON networks
LECTURE 3.
Project Management (lecture)
Project Management (lecture)
Importance of Project Schedules
CHAPTER 6 PROJECT TIME MANAGEMENT
Scheduling.
Presentation transcript:

YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT NETWORK AND BLOCK DIAGRAMS

What is Project Network Diagram? A project network diagram is a pictorial representation of the sequence in which the project can be done. Developed in the 1950’ to overcome the shortcoming of the Gantt Chart.

Superiority over Gantt Chart: Displays detailed information on each work unit Clearly reflects the order of tasks in multiple phases Reflects the shortest path to completion Reflects the best usage of resource

Helps of Network Diagrams Network diagrams help us in following way: Finds our critical / non-critical activities. Understand the types of activity dependencies and when they are used.

Ideal Situations of Network Diagrams Network Diagrams are ideal for these situations: Detailed project management Implementation tracking Contingency plans Resource control

Types of Network Diagram Arrow diagram (AOA – Activity on Arrow) Precedence diagram (AON – Activity on Node)

AOA for Computer Institute

AON for Computer Institute

Dependency FS = Finish to Start SS = Start to Start FF = Finish to Finish SF = Start to Finish

ARROW DIAGRAMS The arrow diagram shows the required order of tasks in a project or process The arrow diagram lets you calculate the “critical path” of the project

WHEN TO USE ARROW DIAGRAMS When scheduling and monitoring tasks of a complex project with interrelated tasks and resources. When you know the steps of the project or process When project schedule is critical, with serious results for completing the project late or early

ARROW DIAGRAM PROCEDURE List all the necessary tasks in the project or process Determine the correct sequence of the tasks Diagram the network of tasks Between each two tasks, draw circles for “events.” Look for three common problem situations and redraw them using “dummies” or extra events

DUMMY ACTIVITY? A dummy is an arrow drawn with dotted lines used to separate tasks that would otherwise start and stop with the same events or to show logical sequence Dummy separating simultaneous tasks

BLOCK DIAGRAMS The block diagram is a simple pictorial representation of a system or sub-systems to illustrate the relationships between sub-systems.

IMPORTANCE OF BLOCK DIAGRAMS Identification the system Visualization the system

WHEN TO USE BLOCK DIAGRAMS? Establish the boundaries of a system under consideration Outline the elements contained within the scope of a task Identify inputs and outputs for components within a system Identify relationships between systems or components Establish critical paths through systems

HOW TO USE BLOCK DIAGRAMS? Construct the initial diagram using pencil and paper then transfer to the computer Space blocks far apart, leave enough space to add more blocks when needed Start at the input to the system and follow the path

Requirements System Elements Interfaces – Internal & External Contributors / Other Aspects

Process makes it possible, people make it happen.

REFERENCES Management/172.html Management/172.html rkDiagram.pdf rkDiagram.pdf

THANKS…