Survey Management System Phase Two Presentation by Team S1.

Slides:



Advertisements
Similar presentations
Drybridge Consulting Party Identification Directory Installing the Microsoft Research Service IDEAlliance and Drybridge Consulting – collaborating to deliver.
Advertisements

Research and Innovation Participant Portal How to register for an ECAS account NEXT.
EFRONT V4 EXTENSIONS ARCHITECTURE. The goal  To offer more flexibility to 3 rd party users to modify eFront functionality  To further extend eFront.
FP6/FP-7 IT System 1 FORCE: WEB BASED EDITOR OF FORMS C FOR FP-6 AND FP-7.
HCI SEMESTER PROJECT PROJECTS  Project #2 (due 2/20)  Find an interface that can be improved  Interview potential clients  Identify an HCI concept.
On the Home Page, you will always have a complete up-to-date overview of all your RFP Projects and their status.
Two-Factor Authentication & Tools for Password Management August 29, 2014 Pang Chamreth, IT Development Innovations 1.
Online Submission and Management Information -- Authors
Background Current Status Future Plans. Agenda Background First Steps Current Status Future Plans Joomla Basics Questions 2.
Computer Monitoring System for EE Faculty By Yaroslav Ross And Denis Zakrevsky Supervisor: Viktor Kulikov.
Project 2002 A Proposal Application Project 2002 Actions.
IS 421 Information Systems Management James Nowotarski 16 September 2002.
The Best Zoo Web Programming money can't buy. That's right. You can't buy web programming like this. That's why we're giving it away for free!!!
The project plan. December 16, Agenda The project plan –Risks –Language decision –Schedule –Quality plan –Testing –Documentation Program architecture.
Project Centric Solutions Page 1 Swaziland Electricity Board Magsoft e-Tendering Solution Magsoft International LLC
Integrating CRM On Demand with the E-Business Suite to Supercharge your Sales Team Presented by: Tom Connolly, Jason Lieberman Company: BizTech Session.
SDLC Project Brady Goyn, Doug Reeves Planning Analyze Design
8/9/2015 1:47 AM SurveyCentralOverview.ppt CSC ©Copyright 2012 Online Survey Application: CSC Survey Central System Overview November 26, 2012 Supported.
Introduction to Web-Based Repository for Software Testing Tools (WReSTT) 03/16/2009 Florida International University WISTPC 2009 Peter J. Clarke.
Overview SAP Basis Functions. SAP Technical Overview Learning Objectives What the Basis system is How does SAP handle a transaction request Differentiating.
Presented by Lubna Yasmin Pinky Class Roll: 401 Exam Roll: Reg. No. : Session: Mashirah Binte Zaman Class Roll: 1407 Exam Roll:
Evaluations and recommendations for a user support toolkit Christine Cahoon George Munroe.
ONLINE CLAIMS TRACKING
Portal and AQAS-Philadelphia University 21-22/6/2011 AVCI Platform in PU Dr. Abdel-Rahman Al-Qawasmi Philadelphia University Director of Computer Center.
ABSTRACT Zirous Inc. is a growing company and they need a new way to track who their employees working on various different projects. To solve the issue.
Introduction to our On-Line Self Service Center at
LOGO Server. Contents Introduction 1 Problem Definition 2 Proposed Solution 3 Architecture Diagram 4 Server Technology 5 Hardware and Software.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Chapter 6: Systems Development Steps, Tools, and Techniques Management Information Systems for the Information Age.
Relay Online Sign Up! Set Up! Fundraise!. Welcome to Relay Online 2013.
Training Guide for Inzalo SOP Users. This guide has been prepared to demonstrate the use of the Inzalo Intranet based SOP applications. The scope of this.
Drinking Water Infrastructure Needs Survey and Assessment 2007 Website.
Single Sign-On
Online Training Instructions Medicaid Time Study.
Company LOGO Technology Institute: Session 8 Tools for the Visual Learner, Part 1.
1/ 26 JUNE 2009 / Job Request System (JRS) Peggy Maffeo National Production Support Team.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Petals SAP Point Of Sale System Third Project Presentation M.Tech Team SE 15 (Saturday) Team Jan-2009.
Implementing CIITS: Empowering Kentucky’s Teachers and Leaders for Success.
 What are CASE Tools ?  Rational ROSE  Microsoft Project  Rational ROSE VS MS Project  Virtual Communication  The appropriate choice for ALL Projects.
What's New in Kinetic Calendar 2.0 Jack Boespflug Kinetic Data.
Members: Trần Huy Thường Trần Mạnh Cường Đào Anh Thư Nguyễn Duy Tiến.
Online Surveys Jacqui James Malcolm Roberts School of Education.
1 PennDOT ATX Project Summer Semester EOSP Team Stalagmite: Dan Abramovich Jeff Ditillo Oksana Schubert Alexey Stolpovskikh Dehua Zhang.
GLOCO – Integrated Corporate Portal Final Presentation Presented by Team 3 1 Team 3 Members: Joyce Torres Kenneth Kittredge Pamela Fisher Ruzhena Saltisky.
.  A reference model developed for an important use case (Air Job) including UI widgets, controllers, services and DAOs.  After full requirement analysis.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
Agenda  Microsoft Directory Synchronization Tool  Active Directory Federation Server  ADFS Proxy  Hybrid Features – LAB.
Online School Management System Supervisor Name: Ashraful Islam Juwel Lecturer of Asian University of Bangladesh Submitted By: Bikash Chandra SutrodhorID.
Step 1 Lead Notifications Dear Partner, New leads have been assigned to your organization based on customer preference and are available for you.
Microsoft Customer 2 Partner Connector Quick Reference Guide
PROJECT SECME Carthik A. Sharma Juan Carlos Vivanco Majid Khan Santhosh Kumar Grandai. Software Engineering Fall 2002.
AREA MEETING 2016 What is the CLIMATE of your CLUB?
Introduction to Information Systems SSD1: Introduction to Information Systems Unit 1. The World Wide Web Unit 2. Introduction to Java and Object- Oriented.
WEB IVR SMS WAP USSD One Picture to Understand USDP What is USDP … …
REDCap General Overview
“Information Sharing Portal for Indus Sub-System”
TECHLEADS IT Oracle Apps ADF R12
Fundamentals of Information Systems, Sixth Edition
Materials Engineering Product Data Management (ePDM)
More than just File Sync and Share.
Unit4 Customer Portal Submitting & Managing Cases.
Unit4 Partner Portal for Case Creator
Ohio Web Portal Ohio Edison, Illuminating Company, Toledo Edison
Why PTW (SIMOP) monitor?
How to Access and Complete Training
Why Sub-System monitor?
Welcome to your new ticketing system
SysKit Security Manager
Presentation transcript:

Survey Management System Phase Two Presentation by Team S1

Introduction The Survey Management System (SMS) is a java-based web application requested by ST Engineering. Its primary function is to enable users to create online surveys. The links to the surveys will be send via to participants. Participants will respond to the survey. Users will be able to view and analyze the survey results.

Key design considerations Programming language is java. Database is MSSQL. Single-sign-on to Netweaver portal but no interface to SAP R3 systems. Interface with iReports, a free, open source report designer. Part of the system requires a small windows service application to send the survey s.

System Diagram SMS EIP DB Window Service Web Application iReport

Project Schedule (1) Phase One Tasks Completed

Project Schedule (2) Phase Two Tasks Completed

Project Schedule (3) Remaining Tasks

Management Issues ProblemResolution/Migration Busy schedule and demanding time commitment from team members makes it difficult to get everyone to met. Schedule meeting through online conference. Minutes of meetings that contains project decision and task assignment send to all team members. Limited manpower resources with a small 5 man team. Tightly monitor and control task progress. Each critical task has two team members assigned to ensure there is a backup in the event one of the members are unavailable.

Key Use Case Analysis 1: Create Survey (1) Create survey Create set Create question Create answers Is the use case which allows editors to create surveys. Is the primary functionality of the system. Survey Set Question Answer Question Answer Question Answer Set Question Answer Question Answer Question Answer

Key Use Case Analysis 1: Create Survey (2) Home Page Survey Management Page List Surveys Delete Surveys Survey Modification Page / Set Management Page Create Survey Modify Survey List Sets Delete Sets Set Modification Page / Question Management Page Create Set Modify Set List, Delete, Create, Modify Question List, Delete, Create, Modify Answer

Key Use Case Analysis 1: Create Survey (3)

Key Use Case Analysis 1: Create Survey (4)

Key Use Case Analysis 1: Create Survey (5)

Key Use Case Analysis 1: Create Survey (6)

Key Use Case Analysis 2: View Survey Results(1) View survey results Is also one of the essential functionality of the system. Basic tabulated result of all how many participants chose which answer for which question is shown. Has the function to be exported to MS Excel. No.QuestionAnswer 1Answer 2Answer 3Answer 4 1What is your favorite Drink? MiloTeaCoffeeMilk What is your favorite movie? Toy StoryLord of the Rings: Return… 10

Key Use Case Analysis 2: View Survey Results(2)

3 Layered Architecture Presentation Layer Business Layer Data Access Layer

Prototype IReport SSO to Ticket JSF EJB JPA Hibernate

Reason for Prototyping (1) IReport Easy to Design Report. Free tool. Third Party Component.

Reason for Prototyping (2) Single Sign On Requirement to enable Single Sign On for logged in user into Survey Management System.

Reason for Prototyping (3) JSF EJB JPA Hibernate To familiarize the team about the framework. To prove the feasibility of the proposed architecture.

Prototype on JSF EJB JPA Hibernate Company Prototype Create Company Delete Company Update Company View Company List

Prototype on IReport IReport is a Tool from Jaspersoft. SMS uses IReport tool for reporting. Report data is loaded through JNDI Datasource. Company Summary Report Prototype.

Prototype on SSO (1) ST Engineering uses SAP Netweaver as its internet portal. Single-sign-on to SAP Netweaver can be implemented using the SAP Logon Ticket. Reason to prototype is to test all external systems.

Prototype on SSO (2) UserEIP SMS 1. logs on to Logo n Ticke t 2. creates 3. clicks on link to SMS in 4. passes Logon Ticket to 5.decrypts 6. grants rights to