Global Design Effort - CFS 1-19-11 Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.

Slides:



Advertisements
Similar presentations
Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Advertisements

Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
E Huedem, Nov ILC VALUE ENGINEERING SESSION of POWER & COOLING (Focus on Main Shaft 7) November 27, 2007 INFORMATION PHASE Conventional.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Marc Ross Nick Walker Akira Yamamoto XFEL – based HLRF scheme 07 Sept 2010 BAW 1 - Backup HLRF 1.
Cost Impacts of two e- ML cycles at sqrt(s) < 250 GeV purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
KCS and RDR 10 Hz Operation Chris Adolphsen BAW2, SLAC 1/20/2011.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Cost Impacts of Reduced # Bunches per Train purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius, Fermilab.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
CLIC Civil Engineering & Infrastructure
Americas KlyCluster Cost Analysis Overview
Summary of WG2 :CFS for staging
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
ILC CFS AD&I Daresbury Lab Summary
ILC - Global Design Effort
Presentation transcript:

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES AND SITING GROUP Reduced Bunch Number V. Kuchler

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number Basic CFS Assumptions Main Linacs - “Full Power” Main Linacs - “Full Power”  “SB2009 Design” Had to be Updated to Develop “Full Power Design” and Reflect Current Design Development  Main Linac Tunnel Diameter Increases from 4.5 m to 5.0 m Diameter (Waveguide and CTO’s)  Tunnel Length Increases by 4 RF Units (140 m) (Overhead for Undulator)  Total Number of Klystrons Increases from 580 to 714 (Undulator, Spares and Energy Spread)  Klystron Surface Building Increases in Size by 714/580 %  7 kw (of 10 kw) per RF Unit Stays in the Tunnel (Alcove) and Adds to the Cost of Process Cooling  Low Voltage Power Distribution Increases by 714/580 %  “Full Power” is Defined as 250 Gev e- & e+ Main Linacs with 2625 Bunches per Train at 5 Hz  “Reduced Bunch Number” (Low Power) Is Defined as 250 Gev e- & e+ Main Linacs with 1312 Bunches per Train at 5 Hz  This Presentation will Provide CFS Design and Cost Impact for Both KCS and DRFS RF Systems for the Americas Region  KCS Information is More Mature than the DRFS Design at this Time 2

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number Basic CFS Assumptions cont. Damping Ring - “Full Power” Damping Ring - “Full Power”  “SB2009 Design” Had to be Updated to Develop “Full Power Design” and Reflect Current Design Development  “SB2009 Design” Damping Ring Length Taken to be 6.4 km (Reduced from RDR 6.7km)  “Full Power Design” Damping Ring Length is Also 6.4 km  Reduced Bunch Number is Based on a 3.2 km 7.5 m Diameter Damping Ring initially to House 2 Rings (1 e- & 1 e+) But Sized to Allow Upgrade Path to 3 Rings (1 e- & 2 e+)  The Cost Comparison will be Based on “Full Power” 6.4 km 5.0 m Diameter Tunnel to “Reduced Bunch Number” 3.2 km 7.5 m Diameter Tunnel  Unit Cost per m for 3.2 km Tunnel is increased Due to Customization of TBM for Tighter Turning Radius  Damping Ring Power/Heat Loads for 6.4 km are Assumed to be the Same as RDR Damping Ring Loads 3

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number CFS Impacts General Considerations General Considerations  Only the 3 Major CFS Cost Drivers were Reviewed for this Exercise  Civil Construction  Process Cooling and HVAC  Electrical  Civil Construction  Tunnel Diameter  Tunnel Length  Surface Buildings  Utility Alcoves (DRFS Only)  Process Cooling and HVAC (Mechanical)  Surface Cooling Towers  Distribution Pumps  Distribution Piping to Surface Klystrons  Distribution Piping to DRFS Components  Electrical  High Voltage Distribution (69 kv)  Medium Voltage Distribution (34.5 kv)  Low Voltage Distribution (480 v and Below)  Low Voltage Distribution to Surface Klystrons 4

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 5 Diagram Courtesy E. Huedem Information Courtesy of C. Nantista

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 6

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 7

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number “Full Power” to “Reduced Bunch Number” Civil Construction Civil Construction  Klystrons Required at Surface are Reduced from 714 to 499 (ML)  KCS Surface Building Area is Reduced by 30 % (215/714) (ML)  DR Length Reduced to 3.2 km but Tunnel Diameter Increases to 7.5 m Process Cooling and HVAC Process Cooling and HVAC  Reduction in Chilled Water Cooling Requirements for Surface RF Racks (ML)  Reduction in Cooling Towers for Process Water (ML & DR)  Reduction in Cooling Tower Pump and Accessories for Process Water System (ML & DR)  Reduction in RF Surface Water RF Pumping System (ML)  Reduction in RF Surface Water RF Piping System (ML)  Reduction in Chiller Capacity (DR)  Reduction in LCW System (DR) Electrical Electrical  Reduction in Medium Voltage Substations (ML & DR)  Reduction in Medium Voltage Distribution and Transformers (ML & DR)  Reduction Electrical Distribution for Reduced Number of Klystrons (ML) 8

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 9 Initial Surface Building Layout at Major KCS Shafts

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 10 Very Preliminary Cross Section Study for Damping Rings

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 11 Mature Cross Section Study for Main Linac

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 12

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number Upgrade Back to Full Power At this Level of Design Maturity the Upgrade Back to Full Power is Simply the Reverse of the Savings At this Level of Design Maturity the Upgrade Back to Full Power is Simply the Reverse of the Savings There is not Enough Detail in the Design to Identify any Premium for the Upgrade Back to Full Power Operation There is not Enough Detail in the Design to Identify any Premium for the Upgrade Back to Full Power Operation 13

Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number Summary The KCS RF Option is the Most Developed to Respond to the “Reduced Bunch Number “ Proposal The KCS RF Option is the Most Developed to Respond to the “Reduced Bunch Number “ Proposal The DRFS Alternative for the Americas Region is Only in the Preliminary Stages of Development The DRFS Alternative for the Americas Region is Only in the Preliminary Stages of Development The KCS and DRFS Main Linac Costs are Both Lower for the Reduced Bunch Number Option The KCS and DRFS Main Linac Costs are Both Lower for the Reduced Bunch Number Option The Damping Ring Cost is Also Reduced Primarily Due to Reduced Overall Tunnel Length which Offsets the Increased Unit Costs of Larger Tunnel Diameter The Damping Ring Cost is Also Reduced Primarily Due to Reduced Overall Tunnel Length which Offsets the Increased Unit Costs of Larger Tunnel Diameter 14