O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy.

Slides:



Advertisements
Similar presentations
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
Advertisements

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, October 15, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
The High-Energy Frontier Meenakshi Narain For the BU High Energy Experimental Groups: g-2 Super-K Dzero Atlas CMS.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
Pixel Upgrade Plans ROD/BOC PRR July 17, 2013 T. Flick University of Wuppertal.
Roger Rusack – The University of Minnesota 1.
April 21st 2010Jacques Lefrancois1 UPGRADE NEWS Scope of upgrade presented by Andrei in upgrade meeting April 16th Role of trigger presented by Hans in.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
CMS Phase II Trigger and L1 menu Trigger, Online and Offline Computing Workshop Sep 4 and 5 at CERN O. Buchmueller Imperial College London.
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
1 SCA Cell Utilizing Scheme The output of each preamp-shaper channel is sampled continuously at 20 MHz and stored the SCA cells. There are 96 cells for.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
1 Triggering on Diffraction with the CMS Level-1 Trigger Monika Grothe, U Wisconsin HERA-LHC workshop March 2004 Need highest achievable LHC Lumi, L LHC.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
Phase 2 muon plenary, 11-Feb-2015 Jay Hauser  Based on three main arguments:  Age/reliability  Radiation tolerance  Maintainability  Bonus: L1 trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
C. F. Bedoya. C. F. Bedoya April 9th, LS1 projects: * Theta TRB: (talk from Fabio). * SC relocation (next slides) Phase 1 Trigger : * L1 TDR finalized.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
New Trigger Strategies Discussion Perimeter Institute HL-LHC Workshop June 8, 2015 Eva Halkiadakis, Matt Strassler, Gordon Watts.
From the Standard Model to Discoveries - Physics with the CMS Experiment at the Dawn of the LHC Era Dimitri Bourilkov University of Florida CMS Collaboration.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
PCIe based readout for the LHCb upgrade U. Marconi, INFN Bologna On behalf of the LHCb Online Group (Bologna-CERN-Padova) CHEP2013, Amsterdam, 15 th October.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
DT UPGRADE STRATEGY M.Dallavalle for the DT Collaboration 6/26/12 Muon IB1.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
Simulation Plan Discussion What are the priorities? – Higgs Factory? – 3-6 TeV energy frontier machine? What detector variants? – Basic detector would.
GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping 1  Recall descoping scenarios for 235 and 200 MChF:  Tiziano:
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
D. Breton, S. Simion February 2012
TDAQ Phase-II kick-off CERN background information
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Electronics Trigger and DAQ CERN meeting summary.
Phase 2 Muon Electronics
Electronics, Trigger and DAQ for SuperB
Trigger, DAQ, & Online: Perspectives on Electronics
CMS Upgrade Project Office Meeting
CMS SLHC Calorimeter Trigger Upgrade,
CMS Goal of the experiment
SLB Synchronization in H4 Beam (LIP - Lisbon)
LHCb Trigger, Online and related Electronics
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
The CMS Tracking Readout and Front End Driver Testing
SUSY SEARCHES WITH ATLAS
August 19th 2013 Alexandre Camsonne
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy Working Group - 1 Trigger Performance & Strategy Working Group Report Oliver Buchmueller Imperial College Wesley H. Smith U. Wisconsin Upgrade Project Office Meeting August 3, 2012 Outline: Discussion with Physics about Physics Priorities for the Trigger upgrade Results from second meeting on Trigger Architecture Note: next meetings: Discussion on Tracking Trigger during Lisbon Week Follow-up on trigger architecture, Tuesday, Sept PM

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy Working Group - 2 Physics Priorities in Present Understanding Need to study the properties of the new particle in detail to answer important questions about its underlying nature. Mass, Spin, Couplings, Production mechanisms and decays. A 125 GeV Higgs-like particle in expected to be very rich in decay and production. Thus it is mandatory to cover all possibilities. This program of work will require keeping the trigger acceptance for Higgs at least as high as in Doubling the energy to 14 TeV in 2015 will also open the door to a completely new energy regime (i.e. 2 TeV and higher) for our searches. This requires keeping the same sensitivity for SUSY and Exotic searches that we have in SUSY benchmarks are different, and possibly more challenging Will use benchmarks from Physics to L1 Trigger Phase 1 Upgrade

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy Working Group - 3 Required Trigger Menu in Present Understanding The trigger menu for would have similar acceptance to the 2012 menu The starting point for studies is the 2012 menu and its relative allocations of bandwidth modified to fit within the constraints of a L1 trigger rate of 100 kHz and an HLT output rate of 400 Hz at a luminosity of 2E34 and energy of 14 TeV.

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy Working Group - 4 Phase II and Beyond Present Understanding Harder to define a Physics program for this time and a much will depend on the outcome of the run campaign. One option would be to adopt a program similar to the linear collider and try to study with high precision the properties of the Higgs (or whatever it reveals itself to be), with a special focus on self-couplings and precision measurements of couplings. This would require (again) to keep the trigger acceptance for Higgs at least as high as in We also require the same sensitivity for SUSY and Exotic searches that we have in ⇒ Working Hypothesis: use Phase 1 menu as a starting point

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy Working Group - 5 DAQ, Computing, Tracker DAQ assuming 10 MB event size: Readout at 100 kHz, 1 MHz no problem, HLT OK Readout at 40 MHz very difficult, HLT too high cost Output at 10 kHz OK (confirmed w/ F. Meijers) Computing: Assuming factor ×3 in event size & ×3 in reco. time Can accept 10 kHz sustainable data-taking Tracker with 1 MHz L1 and track trigger: Outer architecture doesn’t work New solution needs to be developed e. g. Sparsify L1 data, keeping the same allocated bw Need to check if this would work Not a small change. Implications on FE chip Inner architecture may or may not work L1 bw is larger for same occupancy because of z address, and occupancy is larger in itself Worst case: Shift boundary to higher radius for these modules Need to follow up with tracker on details of above Urgent to have a timely decision on architecture

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy Working Group - 6 Input from Calorimeters ECAL: First look at increasing L1 Latency, Rate > 6.4 usec, 100kHz To meet latency/rate specs, need to change: On ‐ detector ECAL digital electronics (FE + optical links) ECAL off ‐ detector electronics (DCC + TCC + CCS + power supplies) Est. Cost: 12 MCHF Cooling system must remain unchanged and untouched Replacement of EB FE + Links would require: Of the order of 10 ‐ 20 MCHF for hardware alone 10 ‐ 15 engineers/physicists/technicians for 4 ‐ 5 years Some of this work may occur anyway if replace EE+ES system Two years of work during a shutdown 25 FTE for two years Non ‐ negligible risks to the existing detector and personnel Currently examining other means of coping with higher latency/rate HCAL: L1A rate of 250 kHz is achievable with presently planned upgrade L1A rate of 1 MHz requires AMC13 replacement with either more 10 Gbps links (need 8... hard) or future 40 Gbps links. (Estimate ~$400k+engineering for all of HCAL) - with 40 GB QSFP (Quad Small Form-factor Pluggable) → would need different FPGAs

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy Working Group - 7 Input from Muon Systems to enable L1 > 3 usec, 100 kHz RPC: New RMB (Readout Mezzanine Board) mezzanines (84) New RMB → DCC Optical links (presently 84 u. 640 Mbps GOL) New DCC cards (Presently 3 u. ECAL DCC with modified firmware) Total Cost ~ 100 K€ DT: On-detector ROB HPTDCs accept L1A up to 25 µsec Replacing ROB’s major effort Higher L1A rate or latency requires new ROS Readout Server Boards will be in USC, planned redesign once, “Not very expensive” DDU limit is 250 MB/s (1 kB/evt x 250 kHz L1A) Can probably sustain 500 kHz by doubling f FEDs & reducing debugging trigger data ROS wil be redesigned in USC either way, if L1A rate increases, ROS may become DDU ROS to DAQ directly=> review how many extra DAQ connections will be needed: no limit means 36 “Slinks” (10 Gbps) instead of present 5-10 CSC: CFEB SCA bottleneck 3.2 µsec L1A latency + CLCT rate (poisson statistics) 26 µsec digitization + L1A rate (queue statistics) DCFEB not restricted Only planned for ME1/1 – cost for all CSCs = 12 M$ Limited to < 800 kHz L1A unless replace DDU – not planned at moment

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy Working Group - 8 Conclusions on Architecture The option of a L1 Trigger rate of 1 MHz and HLT output rate of 10 kHz is feasible for all subsystems, DAQ and Computing, but has a significant cost and is under serious consideration. We still need to gather further information from Tracker & ECAL Already much useful information provided! Follow-up meeting Tuesday, Sept PM Gather further information, have discussion This option will need much discussion in the UPO and CMS management. This is just a “heads up”