The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

CP Chapter 4 Schedule Planning.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
MANAJEMEN PROYEK PERANGKAT LUNAK Program Pendidikan Vokasi Universitas Brawijaya Tahun 2011.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
إدارة المشروعات Projects Management
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Tutorial 2 Project Management Activity Charts (PERT Charts)
Creating the Project Plan
Eleanor Roosevelt High School
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
MGMT 483 Week 8 Scheduling.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
5/18/2015 L. K. Gaafar PROJECT MANAGEMENT Time Management* Dr. L. K. Gaafar The American University in Cairo * This Presentation is Based on information.
Project Management. What is a Project? One Time Effort Identifiable Start/End Points Specific Objectives Multiple Tasks Resources from Across the Organization.
Importance of Project Schedules
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Project Time Management
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Project Management © Wiley 2007.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
PROJECT MANAGEMENT Approaches
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Dependencies and Network Diagrams. Agenda Dependencies Milestones The Network Early/Late Start/End dates Slack/Float Critical Path.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Project Management MGT 30725
Project Management: PERT/CPM
Chapter 5: Project Time Management Doddy Prayogo, Ph.D.
Project Management for Business
Project Time Management.
Chapter 6: Project Time Management
Projects: Critical Paths
Critical Path Method (CPM). Background & History Developed in the 1950s by the US Navy & Du Pont. Originally, the critical path method considered only.
Project Management Planning Models
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Time Planning and Control Precedence Diagram
Project Management CPM Method Tutorial-p1
תזמון פרויקטים.
Project Time Management
BEST VIEWED IN SLIDE SHOW MODE
Project Time Management
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
Project Time Management
Project Time Management
Exercise – A small building.
Project Time Management
Time Planning and Control Precedence Diagram
Presentation transcript:

The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr

Critical Path Method (CPM) Project planning technique Important tool for project management For any project with interdependent activities

CPM helps you figure out: how long a complex project will take to complete which activities are critical ◦ those needed to be done in time in order to follow the schedule

The model of CPM 1. A list of all activities required to complete a project 2. The duration of each activity has to be known 3. Analyze the dependencies between the activities

The model of CPM CPM calculates the longest path of planned activities to the end Earliest and latest date that each activity can start and finish Avoiding extension of the project Determining the ‚critical‘ activities Activities which have ‚total float‘ (delayed without making the project longer)

Critical path Series of project network activities which lead to the longest overall duration Shortest time to complete a project Delay of critical activity has an impact on the completion date Shorten the planned critical path by ‚fast tracking‘ (more activities parallel) or ‚crashing the critical path‘ (shortening activities by adding resources)

Precendence diagram method (PDM) Network diagram uses boxes to represent activities Connection with arrows to show the dependencies Early / late start date Early / late finish date Duration

Advantages of PDM Finding the critical path Defining the amount of time required Usage to crash projects To reduce resources Defining dependencies Identifying lead and lag times

Design I Operation Description ES (Earliest Start) EF (Earliest Finish) Float LF (Latest Finish) LS (Latest Start) Ref. No.Duration if the float equals zero it‘s considered critical

Design II ES LF EF LS Float Duration Operation Description if the float equals zero it‘s considered critical

Example

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E 01

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E

Example 1 2 A B 4 C 2 F 1 D 1 E