ANGEN Alabama Next Generation Emergency Network Roger D. Wilson Chairman, Wireless 9-1-1 Board Alabama Next Generation Emergency Network.

Slides:



Advertisements
Similar presentations
The current System Landline caller The emergency call process starts with a caller dialing (highly simplified) © 2011 Colorado Resource.
Advertisements

Network Access Alternatives How getting from point A to point B is overly complicated… or if you back up far enough everything begins to look the same!
Next Generation Emergency Services Christian Militeau Intrado,Inc. March 21, 2006.
ISO 9001:2000 Certified Your partner in critical communication SolaCom Public Safety Solutions December, 2007.
What’s Going on Behind Wireless Public Safety Solutions WELCOME!
Preparing for the Future.  Emergency calls today are primarily voice.  People expect to reach PSAP when dials 911.  People have multiple ways and devices.
LNG for NG 9-1-1/ NG Realization of IETF Standards for the operational use in a Legacy Network Gateway for Next Generation Emergency Communication.
Confidential and proprietary material for authorized Verizon Wireless personnel only. Use, disclosure or distribution of this material is not permitted.
The Ultimate Redundancy System for Voice and Data Communications Land and Air ™
Brian Rosen Chair, Long Term Definition WG.  i1 = document older strategies for VoIP into  i2 = standard way to support VoIP on current E9-1-1.
Broadband and Wide Area Network Services Carrier Gigabit Ethernet Multi Protocol Label Switching Vs. IP VPNs T-1 & T-3 SIP Trunks Security Network Topology.
Confidential1 1 FCC Text to Gulf Coast NENA October 15, 16.
Information Technology Development Center FLAGLER COUNTY FLORIDA ENGAGING IN THE WORLD WIDE ECONOMY.
Confidential1 1 Introduction to inetwork and the ANGEN NG9-1-1 dashboard Training Module 1 Gulf Coast NENA October 15, 16.
ANGEN UPDATE ANGEN Gulf Coast Conference1.
Georgia Interoperability Network
ANGEN Update 2013 Gulf Coast Conference John R. Ellison - ANGEN Consultant Alabama Board.
Radio Interoperability Initiative. Problems Facing Public Safety Communications Technology  Higher Frequencies  Lower Power  Trunking  User Expectations.
ANGEN UPDATE GC911 Conference - October John Ellison, Contractor – Alabama Board.
Alabama Next Generation Emergency Network
Module CSY3021 Network Planning and Programming RD-CSY /09 1.
NENA’s 11 th Annual Technical Development Conference A proposal to support E911 calls on Voice over IP Networks Martin Dawson – Nortel Networks.
North American Emergency Services Brian Rosen Emergicom.
IN911 RFS for Wireless E911 and i3 Network Services Pre-bid Meeting August 13, 2014 Joel McCamley, ENP Jim Lockard, PMP, ENP.
Router Architectures An overview of router architectures.
Case Study: The ROI of SIP Trunking Date:Tuesday 2/3, 8:30-10:00am Track: SIP-05 –SIP Trunking Room: B114 / B115.
Jason Horning, ENP NDACo 6/3/2015 Next Generation Update.
National Finance Center (NFC) Dual Data Center Jerry Lohfink Director, National Finance Center.
NETWORKING COMPONENTS Zach Avis. Hub A hub is a low cost way to connect two computers. A hub can also act as a repeater. When a signal comes from one.
Sarkis Mkoyan *Yerevan Physics Institute. 2 Alikhanyan Brothers St., YerPhI Network Overview.
Alabama Next Generation Emergency Network 2012 Alabama Gulf Coast Conference John Ellison, Contractor, CAT - AUM.
California SMS Text-to SMS Text-to Pilots Pilots in four locations in California Began testing in November 2013 All pilots tested by end.
MAEDS 45 th Annual Conference October , 2009.
U.S. Department of Agriculture eGovernment Program August 14, 2003 eAuthentication Agency Application Pre-Design Meeting eGovernment Program.
GIS and Indiana’s Next Generation 911 WTH Technology, Inc.
State Of California E911 Next Generation Update 2009 Andy Nielsen State of California E9-1-1 Office
Statewide Level Rate Study Thomas A. Petee, Ph.D. Auburn University at Montgomery Center for Government & Public Affairs.
Next Gen Funding Dick Dickinson Senior Director, Public Safety TCS Inc October 13, 2009.
Alabama Next Generation Emergency Network AAND Meeting – December 10, 2009 John Ellison, Executive Director, Shelby County
1 Proprietary & Confidential December 9, 2008 Bandwidth.com Saving You Money Through Voice & Data.
Internet Telephony (VoIP) Henning Schulzrinne Dept. of Computer Science Columbia University Fall 2003.
Draft-rosen-ecrit-emergency- framework-00 Brian Rosen NeuStar CPa
Professional Project Management Service “Bringing It All Together”  The Project Manager is responsible for the overall planning and installation of Qwest.
IP TELEPHONY AT THE AUSTRALIAN CATHOLIC UNIVERSITY A CASE STUDY WIL DANIELS MANAGER, INFORMATION TECHNOLOGY SERVICES.
Alabama Next Generation Emergency Network Alabama Chapter of NENA – April 22, 2010.
State Of California E911 Next Generation Project CalNENA CalNENA March 2, 2010.
William Anderson, Interim Branch Manager California Emergency Communications Branch September 5, Next Generation (NG9-1-1) In California.
JASON HORNING, ENP NDACO NG9-1-1 & TEXT-TO-911 UPDATE (MARCH 2015)
1 E-911 Services Board General Business Meeting November 12,
Network Components Basics!. Network HUB  Used to connect multiple Ethernet devices together  Layer 1 of the OSI model  Not used much today.
ND 911 Association Preparing for NG /24/2010.
1 Presented by Jim Nixon, Breakout Session Moderator December 15, 2005 Report from Breakout Session #2 Individuals/Organizations to Government.
JASON HORNING NDACO 3/6/2013 NG9-1-1 PROGRAM UPDATE.
Computer Networks Chapter 8 – Circuit Switching versus Packet Switching.
IETF 77 Ahaheim, California NOC Report Eric Thompson & Ray Irwin Swisscom Event Services.
MUHAMAD SHAZNI BIN MOHAMMAD SHAH. Gateway Using different protocols for interfacing network by network nodes Contain device such as protocol translator,
Elko County E9-1-1 Project Visual Presentation - Final February 1, 2016 Elko Central Dispatch Administrative Authority Project Mission: To provide the.
Quality of (Mobile & Fixed) Network & Services reporting for Quarter
Renjith V Ravi Assistant Professor(ECE) M.E.A Engg. College Perinthalmanna, Kerala,India Routing in Telephone Networks.
Next Generation Legislative/Activity Briefing
Internet Telephony (VoIP)
New York: Evolution of an ESInet
Understanding the System of Systems
Preparing for the Future
Text-to-911 in ND Joint 911 Assoc. / APCO Meeting March 1, 2016
Luca dell’Agnello Daniele Cesini GDB - 13/12/2017
Thoughts on VoIP and Emergency Calling
PSAP Radio Communications Today and Tomorrow
Contingency & Overflow on ESInet
Introduction & Contact Information Leah Missildine Executive Director for the Alabama Board Office: Mobile:
Presentation transcript:

ANGEN Alabama Next Generation Emergency Network Roger D. Wilson Chairman, Wireless Board Alabama Next Generation Emergency Network

 ECDs  Alabama Wireless Board  Carriers  inetwork, a division of bandwidth.com  Alabama Supercomputer Authority (ASA)  Center for Advanced Technologies – Auburn University Montgomery Alabama Next Generation Emergency Network ANGEN Partners

 One-time Costs  DOT Grant + ECD Match = $1.9M  On-going costs – AWB Cost Recovery Fund  IP Network – ASA  Core Call Handling Components – inetwork  See later discussion of Phase III Costs ANGEN Cost Structure Alabama Next Generation Emergency Network

 inetwork connects to tandems  Wireless Carriers connect to inetwork  Huntsville & Montgomery for redundancy  Testing – will involve all PSAPs  Live calls route via ANGEN – November 1, 2012  Carrier -> inetwork -> LEC SR -> PSAP still routed to PSAP via existing cama trunks  Allows Carriers to drop connections to SR / Tandems Alabama Next Generation Emergency Network ANGEN Phase I

 ASA begins connecting PSAPs to Core via IP  2MB Ethernet in most locations  May be a few exceptions with T1 due to cost  Calls begin to route via ANGEN rather than LEC SR  Carrier -> inetwork -> PSAP via IP  Back-up = inetwork -> Selective Router -> PSAP  Expected to take several months to convert 82 ECDs  6 not participating at this time Alabama Next Generation Emergency Network ANGEN Phase II

 1 st – PSAPs that can accept a direct IP connection  2 nd – PSAPs that need a Legacy Network Gateway  IF a PSAP will get IP capable equipment soon…  Wait to install ANGEN rather than spend $ on LNG  Also saves labor to install and then convert Alabama Next Generation Emergency Network ANGEN – IP Installation

 Wired & VoIP Carriers connect to ANGEN Core  Calls delivered to PSAPs via IP  Once all carriers convert – disconnect cama circuits  Many ECDs will want a backup IP connection  This will not occur before 2014 ~ mid year at earliest… Alabama Next Generation Emergency Network ANGEN Phase III

 Cost Structure – next Board’s Decision  “Probably” – based on percentage of wired / wireless Alabama Next Generation Emergency Network ANGEN PHASE III – Cost Structure? ITEMCost Estimate ASA – Network$1,200,000 Inetwork – core components$828,000 TOTAL$2,028,000 70% Wireless – Cost Recovery$1,419,600 30% Wired – By ECDs$608,400 (divided by population)

 Now – Installing circuits to Selective Routers  Now – Installing and testing Core Components  Now – Meeting with Carriers  November 1, 2012 – Phase I / Live Calls  Will not be all carriers  1 st Quarter 2013 – Start Phase II installed IP to PSAPs  3 rd Quarter 2013 – Finish installing IP to PSAPs  2014 – Start Phase III Alabama Next Generation Emergency Network ANGEN – Timetable

 John Ellison –  Jim Fleming -  Roger Wilson –  Alabama Next Generation Emergency Network Questions