DIPAC07 Quick Report Ivan Andrian Sincrotrone Trieste S.C.p.A. JACoW Team Meeting Knoxville, TN 9 October 2007.

Slides:



Advertisements
Similar presentations
L/O/G/O CONFERENCE SERVICE PLATFORM: ARCHITECTURE AND IMPLEMENTATION Guangyuan Liu, CNIC March 2011, Hong Kong.
Advertisements

France Section C. NORA, France Section July, POCO 2008, page 1 IEEE France Section Pr. Christine Nora, Treasurer, Chair Organization.
17-20 November, JACoW Team Meeting JACoW 2008 Team Meeting November, 2008 KEK, Tsukuba.
JACoW Team Meeting JACoW Database Scientific Program Management System (SPMS) Registration Module Matt Arena, Fermi National Accelerator Laboratory.
JACoW Abstract What’s New JACoW Database Scientific Program Management System (SPMS) Matt Arena, Fermi National Accelerator Laboratory.
Kultur und Kongresszentrum Luzern (*) Full version appended to: C. Petit-Jean-Genaz Report on EPAC04 J.Poole, Post Mortem of The Electronic Publication.
11 May 2005 SPMS Database meeting SPMS Database Meeting 11 May 2005.
JACoW Team Meeting Knoxville, TN 7 to 9 November 2004 Review of EPAC’04 Experience with the SPMS from the position of Conference Administrator Christine.
Home and Learn How Setup a Wireless Internet Connection.
EPAC 2008: LOC2 EPAC08 Eleventh European Particle Accelerator Conference Magazzini del Cotone, Genova, Italy June, 2008 Status of preparation of.
Sue Waller. Organisation Host and main sponsor will be Daresbury Laboratory (ASTeC & Cockcroft Institute) Conference Co-Chairs: Mike Poole & Jim Clarke.
SPMS : What’s next Thoughts on the SPMS, with a view to the future, development of project management, a budget tool, accounting, etc
11 May 2005 JACoW Database Meeting SPMS Database Meeting 11 May 2005.
Report doc.: IEEE 802 EC r0 October 2014 Slide 1Jon Rosdahl, CSRSlide 1 Exec Sec October Interim Meeting Slides Date: Authors:
Industrial Registration at EPAC06 Dan Faircloth. Dan Faircloth EPAC08 Team Meeting 2 nd March 2007 Talk Overview The Online Registration Process What.
Global Conference Portfolio Management (or How the NPSS Manages its Conference Portfolio) William W. Moses Past President, IEEE Nuclear & Plasma Sciences.
Modems and Cables Track 1-2 : Joint Session. Objective Internet connection types, Dial-up networking details &Troubleshooting Tips.
JACoW Team Meeting Knoxville, TN 7 to 9 November 2004 JACoW and the SPMS: Modus Operandi Theory vs. Practice … Christine Petit-Jean-Genaz, CERN.
9-11 October 2007 JACoW 2007 Knoxville Team Meeting JACoW 2007 Team meeting Knoxville, Tennessee 9-11 October 2007.
Energy Recovery Linac (ERL) Conference June 8–12, 2009 Cornell University, Ithaca New York JACoW Team Meeting Hamburg ICFA ABDW #45 ERL 09 Karl.
26 June JACoW Steering Committee JACoW 2008 Steering Committee 26 June 2008 Genoa, Italy EPAC’08 Conference Report Christine Petit-Jean-Genaz,
SPMS and Project Management Move further with respect for proposals made at the 2008 TM JACoW Team Meeting 09 Leandro AC.
1 JACoW Joint Accelerator Conferences Website Presented by J. Vigen on behalf of John Poole, JACoW.
EPAC 2008: LOC2 EPAC08 Eleventh European Particle Accelerator Conference Magazzini del Cotone, Genova, Italy June, 2008 Report on EPAC08 Paolo Pierini.
PAC05 JACoW Team Meeting, Frascati November 2005 Charlie Horak, ORNL/SNS.
Retrieving and Processing Transparencies during a Conference Michaela Marx, DESY JACoW Team Meeting, November 2009, Hamburg, Germany.
JACoW Team Meeting Summary of Meeting Hywel Owen, Daresbury Laboratory.
Matt Arena, Fermilab.  The Scientific Program Management System is a (GPL) tool for event management  Scientific Program Module  Scientific program.
JACoW Team Meeting May 11, 2005 JACoW Database SPMS Registration Module --PAC05 Experience Charlie Horak, ORNL/SNS.
JACoW Status Report, Team Meeting, Oak Ridge, November 2004, J. Poole 1 JACoWJACoW.
Fusion Technology Summary Report Mark Tillack For: Jean Paul Allain IEEE-NPSS AdCom Meeting July 13, 2013, San Francisco, California.
Processing of Transparencies Michaela Marx, DESY JACoW Team Meeting October 2007, Knoxville, USA.
13 th International Conference on Accelerator and Large Experimental Physics Control Systems 10 th – 15 th October 2011 hosted by the European Synchrotron.
1 Spring Team Meeting Summary Updated 28 March 2007.
1 Organisational Changes following TM Trieste Decisions J. Poole.
1 Linac 2010 Status Sep 12-17, 2010, Tsukuba Hiroyuki Sako Japan Atomic Energy Agency JACoW Steering Committee Kyoto 27 May 2010.
1 Spring Team Meeting Summary. TM Trieste Summary, March 2007, J. Poole 2 Organisational Issues Agreed to new terms of reference – needs rewrite Send.
1 Israel Mardor, LINAC12 Chair IOC Meeting, IPAC13, Shanghai, 15 May 2013 Final Report to IOC 26 th Linear Accelerator Conference Sep , 2012, Tel.
JACoW Registration Module JACoW Database Scientific Program Management System (SPMS) Matt Arena, Fermi National Accelerator Laboratory.
PRESENTATION Open an account in a bank. What is Debit and Credit card? Debit card You’ll be issued with a “ Debit card “ when you open an account Debit.
Michael Abo-Bakr, JACoW TM’07, , Trieste Experiences, Problems & Solutions using SPMS for fel 06  Database  Registration  General aspects.
1 EPAC’06 Post Mortem J. Poole. EPAC06 Post Mortem, TM Trieste, March 2007, J. Poole 2 EPAC2006 – The Results 1188 papers published (from ~1550 abstracts.
ECRIS 0 8 Conference Report Maria A. Power, ANL ECRIS 0 8 Proceedings Editor JACoW 2008 Team Meeting November, 2008 KEK, Tsukuba.
17-20 November, JACoW Team Meeting JACoW 2008 Team Meeting November, 2008 KEK, Tsukuba EPAC’08 Partial Conference Report Christine Petit-Jean-Genaz,
1 Chairman’s Report Volker RW Schaa June 2007.
Michael Abo-Bakr, JACoW, , Trieste Free Electron Laser Conference Series  Overview of FEL Conference Series  Organization & Particularities.
LIAISON OFFICER CONFERENCE 21 st November 2015 The Association of Residents of Queensland Retirement Villages Inc. ARQRV WEBSITE – JOINING ( MEMBERSHIP.
1 Chairman’s Report 2011 Volker RW Schaa 08 September 2011.
Doc.: IEEE /1468r0 Submission November November 2015 WG Motions regarding attendance and voting rights Date: Authors: Knut.
SPMS Registration Module Ivan Andrian Sincrotrone Trieste S.C.p.A. JACoW Team Meeting Knoxville, TN 9 October 2007.
9-11 October 2007 JACoW 2007 Knoxville Team Meeting JACoW 2007 Team Meeting Knoxville, Tennessee 9-11 October 2007.
1 Organisational Issues Steering Committee changes Regional Support Centres.
14 November, 2008 IPAC’10 OC/1 Brief Report on EPAC’08 Organization Caterina Biscari, LNF-INFN EPAC 08 Chair Christine Petit-Jean-Genaz, CERN AB Conferences.
1 March 2008AdCom Santa Fe RITC Report Richard Lanza.
7 May JACoW Steering Committee JACoW 2009 Steering Committee Brief reports on EPAC’08 and IPAC’11 Christine Petit-Jean-Genaz, CERN Conferences.
7 May 2009 JACoW Steering Committee Chairman’s Report JACoW Steering Committee 27 May 2010 Volker R. Schaa, GSI Christine Petit-Jean-Genaz, CERN.
JACoW / SPMS Joint Accelerator Conference Web (JACoW) Site Scientific Program Management System (SPMS) Conference Database Management Software Matt Arena,
SMART CARD ONLINE REGISTRATION PROCESS
Step for Paper Registration and Payment, Copyright
Overview of the Proceedings Office Setup at EPAC'08 Ivan Andrian
SPMS Registration Module
Information & Communication Processing Center (ICPC) Services
DIPAC07 Quick Report Ivan Andrian Sincrotrone Trieste S.C.p.A.
Report to TAB Finance Committee May 12, 2005
Distilling server Ivan Andrian Sincrotrone Trieste S.C.p.A.
NOW YOU CAN MANAGE YOUR NETGEAR ROUTER SIMPLY FROM YOUR COMPUTER…!!! NETGEAR ROUTER SUPPORT AUSTRALIA NETGEAR ROUTER SUPPORT
LINKSYS SUPPORT NUMBER. Linksys Support Number for upgrading firewall, Installation and Repair and Connecting Device and Fix Error Messages by Linksys.
 Printer not found  Unable to find the printer  No devices found  Your printer could not be found on your wireless network.
Revision of 2016 Meeting Information & Notes for this Years JACoW Team Meeting David Button JACoW BoD Australian Nuclear Science & Technology Organisation.
JACoW Steering Committee
Presentation transcript:

DIPAC07 Quick Report Ivan Andrian Sincrotrone Trieste S.C.p.A. JACoW Team Meeting Knoxville, TN 9 October 2007

Ivan Andrian - ELETTRA JACoW Team Meeting, Knoxville Second edition in JACoW 189 registrants 126 'final' abstracts 82.54% Europe 12.70% N. America 4.76% Asia 12 exhibitors 2.5 editors

Ivan Andrian - ELETTRA JACoW Team Meeting, Knoxville Companion visit to Murano and Venice Visit to ELETTRA Banquet at Villa Manin 69% of papers publishable by the end of conf. 79% of papers published 5 days after the conf. 90.5% published at beginning of June 90.5% published now (waiting for some Big Names)‏ e.g.: The Chairman & his staff shall we think of money penalties?

Ivan Andrian - ELETTRA JACoW Team Meeting, Knoxville Network details SPMS / Elettra (GARR)‏ Internet connectivity by NH Hotel Cost ~10K€ (incl. VAT) for DSL connection 27 wired devices HDSL 4Mb/s dedicated ADSL 2Mb/s as backup 50 Concurrent Wireless devices throughout the whole hotel

Ivan Andrian - ELETTRA JACoW Team Meeting, Knoxville Conclusions Conference went smooth First to use direct credit card payment IT/Editing/Logistic OK Post-conference practically ignored by the Chair Always the same motivations excuses No editor power Writing a wish letter to Santa Claus...