Devizes RFC Floodlights and Grounds Improvement Project Summer 2013.

Slides:



Advertisements
Similar presentations
29/05/ Floodlights on Over Recreation Ground Floodlight Project Team.
Advertisements

1 Beachcomber Bay Sewer Lift Station Homeowners believe a better solution is available for both the City and the Homeowners.
Architecture CAD living sleeping service SPACE PLANNING
Needs Assessment & Master Plan. Needs Assessment & Master Plan Results Proposed Plan Costs Needs Safety Issues About Savage Field Environmental Impact.
NatWest CricketForce 2008 Projects Workington Cricket Club 4 th, 5 th and 6 th April 2008.
Installation of new drainage systems and reshaping of “splitter” island Rushden Redevelopment 2014.
Designing the Landscape Rainier High School Landscape Design Class.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Horticulture CD Unit C: Nursery, Landscape, and Gardening.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
1 Community Facilities Unit The Future Management of 5 Leisure Facilities Welcome and introductions Facilities within scope Context Community protections.
Agenda Background to the project What’s been achieved so far The new clubhouse How you can help Future phases.
Installing Fences and Walls Ms. Gripshover Landscaping Unit 19.
Ms. Gripshover Landscaping Unit 18 INSTALLING PATIOS, WALKS, AND DECKS.
Panther Pride Association Softball Field Planning School Board Meeting 9/10/2012.
Staff Budget Projections 2014 and Beyond. What to expect from today’s presentation: How did we get here? Budget, Capital & Staffing Requests.
CITY OF JAMAICA BEACH BEACH MAINTENANCE REIMBURSEMENT AND BEACH USER FEE.
Kirkhill MUGA project Sandra Hogg Kirkhill District Amenities Association.
Riccall Pavilion Initial Concept Presentation 24 January 2012 Under the umbrella of the Riccall Sportsfield Association and collaborating with all existing.
2460 Sweet Gum / Chuck & Carol Clouser’s Home The volume of water is too much for the gutter. It is recommended that a separate leader be installed to.
PREPARING THE LANDSCAPE SITE Ms. Gripshover Landscaping Unit 14.
Greening Affordable Housing on a Budget or Where There's a Will, There's a Way.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Hunslet Nelson CC 1 st Xl 2012 – CYCL Premier Division Gipsy Lane Beeston Leeds LS11 5TT © Hunslet Nelson Cricket Club 2011.
 Preparing the Landscape Site. NEXT GENERATION SCIENCE / COMMON CORE STANDARDS ADDRESSED!  HSS ‐ IC.B.7 Evaluate reports based on data. (HS ‐ LS2 ‐
Faculty Meeting Monday, April 4, Deferred Maintenance.
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
Grant Application Guidelines Club Voice Day INEC Killarney
New Community Athletic Stadium Opening at Heslington West September 2014.
Swindon RFC Club Communication 23 rd Feb. Agenda 1.Club Discipline 2.Whole Club Seal of Approval activity and new accreditation 3.Club development plans,
Facilities Update Capri Paul Ecke Central Ocean Knoll Olivenhain Pioneer La Costa Heights Park Dale Lane Encinitas Union School District October 12, 2004.
Grant Application Guidelines Munster GAA Physical Development Grants 2012.
Annual Meeting February 04, HOA Board of Directors  Chairman – Cliff Howard  President – Ilze Robinson  Director – Tom Ball (outgoing member)
Site Layout constructionsite.
SPORTS POLICY AND THE SPORTS ENVIRONMENT. SAFE GROUNDS, EQUIPMENT AND FACILITIES Grounds and facilities should be designed and maintained to provide a.
Unit 2 – Health, safety and injury in sport
About Morgan Sindall Morgan Sindall is a leading UK construction and regeneration group operating through five divisions of construction and infrastructure,
South Greenville Recreation Center and Park Master Plan.
Prudhoe Youth Club F.C. Town Council Presentation 24 th September 2014.
2014 Budget Expenditures City of Knoxville, Iowa Presentation by Harold Stewart, City Manager Monday, February 11, 2013.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
Capital Improvement Recommendations October 27, 2016.
Bond Project Update September 2017
Site Planning & Power Supply
City of Des Peres, Missouri
Inspection Davenport IA
Highveld Industrial Park Office Block – ‘’F’’ Information Memorandum
Highveld Industrial Park Office Block ‘’E’’ Information Memorandum
Highveld Industrial Park Workshop No. 21 Information Memorandum
Highveld Industrial Park Workshop No. 1 Information Memorandum
Drawing Objects to Scale
Facility No.41 at Highveld Steel
Highveld Industrial Park Workshop No. 5 Information Memorandum
Site Planning & Power Supply
Sonia Falaschi-Ray - Barkway Parish Council Chair
Amazing Natural Light & Great Outdoor Living
Oakman Park Ground Set Ups
Highveld Industrial Park Workshop No. 17 Information Memorandum
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
Warm-up Solve for x. Solve for Ө..
Presentation cover; need to take off boarder on PPLM photo
Fairlington Green Association
Police HQ, Aykley Heads, Durham, DH1 5TT
Water Runoff and its Effects at Holy Cross
Council Agenda Item #5 February 4, 2019
WSUP The Club at ArrowCreek Grading
November Bond Election
Life Cycle Costing.
Presentation transcript:

Devizes RFC Floodlights and Grounds Improvement Project Summer 2013

Contents Pictures to demonstrate our plans – Permanent Floodlights – Car Park Upgrade – General Pitch Maintenance – Pitch-side Drainage and Walkway – Pitch-side Safety Fencing – Pitch-side Dug Outs – Enhanced Spectator Viewing Facilities – Upgrade Training Area Lights

Permanent Floodlights – Top Pitch 8 permanent floodlights will be installed on this pitch fully funded by a Wiltshire County Council Section 106 grant

Car Park Improvements – Funded by DRFC Our car park on a typical match day Our Current car park. The area marked in red will be replaced by hard standing and the remainder of the area re-dressed all using 100% recycled material from a local (less than a mile away) project.

General Pitch Maintenance We will Shockwave Aerate, de- compact, re-seed, weed supress and Hollow Bore treat our 2 pitches and training area. DRFC will pick up the full cost of this work.

Pitch-side Drainage and Walkway This area directly adjacent to our Club house has serious drainage issues (the red line shows where the touchline should be!) This will be dug out, proper drainage installed and an artificial 3G grass walkway installed.

Pitch-side Safety Fencing We plan to install a safety fence along the red line to encompass the entire pitch (see Ground Plan Drawing for more detail) to match the fence already in place on the far side of the pitch.

Pitch-side Dug Outs Two Dug-Outs on hard standing concrete to be installed on the far touchline.

Enhanced Spectator Viewing Facilities The top will be removed from the retaining wall and a split level patio installed to give additional standing room for spectators. This will be bounded along the red line by the pitch-side safety fence described above.

Upgrade Training Area Lights Heads to be upgraded to brighter lights We currently have 8 permanent ‘training’ lights situated on our training area, the light is of poor quality (very yellow) we plan to upgrade these running a power spur from the new electric supply that is already being installed for the main floodlights

Summary – DRFC Lights and Grounds Improvement Plan Cricket Pitch Tennis Courts Club House New Flood Lights New Fence Existing Fence Spectator Area 2 Dug Outs New Car Park Resurface existing Car Park Walkway Upgrade Existing Training Lights Wiltshire Police HQ