Hardware Upgrade Project George Palios. Contents Outlines the activities undertaken to upgrade the hardware for the Revenues, Benefits and NNDR Systems.

Slides:



Advertisements
Similar presentations
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
Advertisements

Corporate Interface Architecture George Palios. Contents Outlines the activities undertaken to enhance the quality of service of the Corporate interfacing.
Housing Trust Migration (including Interfacing) George Palios.
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
How to commence the IT Modernization Process?
Transformational Government George Palios. Contents Transformational Government meant organisation-wide changes had to be made. Enterprise Resource Planning(ERP)
Get in touch with Microsoft Dynamics Sure Step Saied Alhamwi, PMP Business Application Manager ACWA Holding
1 RUP Workshop By George Merguerian Senior Partner Business Management Consultants
Enterprise Architecture for Delivering Spatial and Tabular Data and Associated Documents to Managers and Field Personnel Bill Slocumb GIS Professional.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Oracle Database Administration. Rana Almurshed 2 course objective After completing this course you should be able to: install, create and administrate.
How the Texas Project Delivery Framework Can Chart the Course for All Your Application Development TASSCC 2008 Annual Conference August 11, 2008.
SharePoint Portal Server 2003 JAMES WEIMHOLT WEIDER HAO JUAN TURCIOS BILL HUERTA BRANDON BROWN JAMES WEIMHOLT INTRODUCTION OVERVIEW IMPLEMENTATION CASE.
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
November 2009 Network Disaster Recovery October 2014.
Federation of Tax Administrators Technology Conference Tax Systems Integration Initiatives Federation of Tax Administrators Technology Conference Tax Systems.
Annie Griffith Infrastructure Programme Manager July 2007 UK Link Technology Refresh.
GAIN A COMPETITIVE ADVANTAGE BY SELLING ATLAS
Architecture of the R/3 System Chapter 14 C & L Chapter 8 M & W.
Information Systems Development. Outline  Information System  Systems Development Project  Systems Development Life Cycle.
 Copyright 2001 Perot Systems Europe. All rights reserved Architecture Model Introduction Tim Taylor.
Software Engineering Lecture 20 Software Maintenance.
Module CC3002 Post Implementation Issues Lecture for Week 2 AY 2013 Spring.
Patch Management Only part of the solution….. Bob Isaak Mar 04, 2004.
Lucity GIS and IT Services. Lucity IT Services.
Why does my perfectly working App Crash and Burn in Production? Matt Kramer Project Manager, STL Boeing Scalability Test Lab cell.
Databases March 14, /14/2003Implementation Review2 Goals for Database Architecture Changes Simplify hardware architecture Improve performance Improve.
CS480 Computer Science Seminar Introduction to Microsoft Solutions Framework (MSF)
OSG Area Coordinator’s Report: Workload Management February 9 th, 2011 Maxim Potekhin BNL
Cloud On Your Terms Breakthrough Insight Unlock new insights with pervasive data discovery across the organization Create business solutions fast, on.
Dr. Mohamed Osman Hegazi 1 Database Systems Concepts Database Systems Concepts Course Outlines: Introduction to Databases and DBMS. Database System Concepts.
Chapter 8 Evaluating Alternatives for Requirements, Environment, and Implementation.
Presentation By R.M.Johri Principal Director ( InformationSystems) O/O CAG of India.
CAPI and Tourism statistics: Progress to date Prepared by Mairead Griffin.
The DR Datacentre - is there a more Cost-Effective way? Dennis Adams a s s o c i a t e s UK Oracle User Group Conference 2007 Dennis Adams 3rd December.
EIS Progress Report Steering Committee Meeting December 3, /29/20151.
Rapid data migration to SAP ERP and CRM Solution Summary.
Final Class Diagram for C++ Implementation Clickermatic Software Clicker.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Installation and Maintenance of Health IT Systems Unit 8b Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
CERN-IT/DB After-C5 Presentation EDMS Service Migration Monica Marinucci Lopez October 4th 2002 EDMS Document:
Greenlight Presentation Oracle 11g Upgrade February 16, 2012.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
AD&M Technical Integration AVIVA : Data Management and Optim 17 th September 2009.
Taking control and reducing the cost your data infrastructure Kevin Ashby.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
Tier1 Databases GridPP Review 20 th June 2012 Richard Sinclair Database Services Team Leader.
OSG Area Coordinator’s Report: Workload Management February 9 th, 2011 Maxim Potekhin BNL
Job offer IT System & Software Specialist We are currently looking for an IT database administrator in order to respond to one key-account customer demand.
Accounting systems design & evaluation 9434SB 18 March 2002.
SAP-Financials Data Warehouse Project Update. SLIDE 2 SAP-Financials Data Warehouse Project Update Benefits Provide the SAP reporting functionality the.
I/Watch™ Weekly Sales Conference Call Presentation (See next slide for dial-in details) Andrew May Technical Product Manager Dax French Product Specialist.
Systems Analysis and Design in a Changing World, Fifth Edition
UNIFY Performance - Summary Plans
Oracle Database Administration
Senior Staff Meeting November 12, 2008
SAP Performance Tuning
Windows Azure Jump Start Service
Office 365 Fast Track Migration Service
Company Home Shopping Europe GmbH (HSE24) Headquarters Munich Industry
microsoft dynamics ax training in dubai (msdynamicsaxtraining.com)
UK Link Technology Refresh
Introduction of Week 3 Assignment Discussion
MES Migration HGP Asia Knowledge Day 2017

IBM Storwize V7000F for Electronic Health Records
HCL Application Modernization Services
Managing Global System
E4H Implementation Overview August 2019
Presentation transcript:

Hardware Upgrade Project George Palios

Contents Outlines the activities undertaken to upgrade the hardware for the Revenues, Benefits and NNDR Systems. The existing servers were running slow due to being overloaded with Additional Databases together with a number of test databases. An imminent compulsory Oracle 10g upgrade would not fit onto the existing configuration. My role was to perform an analysis of the current servers and design and Project Manage a migration of the systems to new hardware. This was a particularly exciting (and high pressure) Project as the implementation had to be successful in a very short timescale due to 56,000 Council Tax bills needing to be produced immediately afterwards. An immensely Challenging and rewarding project.

1.Review operational issues 2.Present Upgrade Options 3.New Hardware Architecture 4. Devise Implementation Plan 5.Go Live (Detailed transition) Aims of Project

Existing Operational Issues Database server heavily overloaded as a result processes ran slowly at peak times.

As the servers could not be further upgraded, hardware was required. Option 1 Purchase new Sun Solaris/Oracle platform Current platform was Sun Solaris/Oracle; The Software Supplier had more experience with supporting their product on the Unix platform. Option 2 Purchase new Microsoft SQL platform hardware Halton I.T. had experience of Microsoft platforms and the majority of services were run on Microsoft with SQL Server databases. Cost of servers much cheaper. Provide and recommend options Decision: Although the Microsoft solution was in the region of 24K and the Unix solution was £66K, the Project Team felt that since response times and support was a priority, the Unix solution was chosen.

New Hardware Architecture Maximizing resources: 2 new servers were commissioned; the old DB server was re-used as an archive server for reports and legacy databases. One server was decommissioned.

Due to the short timescale – 5 weeks (starting at Christmas) A simplified Plan was devised: 1.Purchase and order Equipment 2.Commission Equipment 3.Migrate Databases to new hardware 4. Acceptance Test 5.Go Live (by 9 th February) Implementation Plan

Go Live Plan

The suppliers delivered and commissioned the Hardware and performed the Migration of the Live data to the new Live server. The Database Administration Team then performed Technical Acceptance Testing. User clients then had a week of intensive User Acceptance Testing. Simultaneously, the DBA Team migrated the Live data to the new Test server and performed intensive Technical Acceptance Testing and prepared for Year End Billing. Once all testing had been signed off a final migration cut was taken and the databases were migrated across to the new Live server. Interfaces were also switched to point at the new Live server. Contrary to the diagram, a late decision was made to keep the old live server operational for an extended period of parallel running as a contingency. Go Live Plan Details