Presentation is loading. Please wait.

Presentation is loading. Please wait.

AD&M Technical Integration AVIVA : Data Management and Optim 17 th September 2009.

Similar presentations


Presentation on theme: "AD&M Technical Integration AVIVA : Data Management and Optim 17 th September 2009."— Presentation transcript:

1 AD&M Technical Integration AVIVA : Data Management and Optim 17 th September 2009

2 AD&M Technical Integration Optim at Aviva Introduction Andrew Crouch Team Leader and lead analyst/developer on the project which evaluated, selected and then designed, built and implemented the archiving solution using the IBM Optim tool at Aviva (formally Norwich Union).

3 AD&M Technical Integration Optim at Aviva What issues were the Business facing? The non direct Claims and Workflow systems had been running on the current platform for 7 years, Policy systems for 2 years. The package had no archiving function. Data is being migrated/converted from old decommissioned systems. Capacity Planning were worried about the rate of data growth and associated costs and feel urgent action is required. Outage costs dramatically increasing. Feb 2000: NU – CGU Merger is announced. Data Protection Act Compliance. System Performance, Resilience, Recovery and Availability.

4 AD&M Technical Integration Optim at Aviva The approach taken to resolving the problems. Identified the need for a data archiving solution. Project started to select and implement an archiving solution. Group wide DPA compliance project started. Good service every day project started to look at Performance, Resilience, Recovery and system availability times.

5 AD&M Technical Integration Optim at Aviva What issues and challenges did the project face? Build vs Buy. Complicated requirements and rules. Tracking down all the data users. Getting sign offs from over 50 interested parties. We had the ERD’s available which made the Optim build simple.

6 AD&M Technical Integration Optim at Aviva Policy Client Claim Workflow The Data to be archived and its inter-relationships. Archiving a logical set of data.

7 AD&M Technical Integration System user Front end DB2 Tables Optim Archive Files New Archive Index The Solution design and where Optim fits. Archive Index Refresh Optim at Aviva

8 AD&M Technical Integration Optim at Aviva Breakdown of The Archiving project tasks.

9 AD&M Technical Integration Optim at Aviva Summary. Stats. At peak running we are removing 2 million database rows a day. Total number of database rows archived: 525 million Claims 206 million 19% of total Claims archived Policy 46 million 8% of total Policies archived Client 25 million 7% of total Clients archived Workflow 244 million With the continuing migration of data onto our strategic platforms either through the decommissioning of old systems or from mergers and acquisitions, managing archiving is an ongoing iterative process.

10 AD&M Technical Integration Optim at Aviva A selection of typical Questions and Answers. Q: Can data be restored? A: Yes, either selected data or a whole file can be restored. Q: Do you have to delete data? A: No, data can be archived without being deleted and in one case that was a necessary part of one of our solutions. Q: What financial benefits have you seen? A: Difficult to quantify because of the amount of changes that were implemented at the same time but 100’s of 1000’s of £ saved in reducing system recovery times. How much is brand image worth? Q: Are there performance benefits? A: Yes, where archiving is not implemented we have performance issues.


Download ppt "AD&M Technical Integration AVIVA : Data Management and Optim 17 th September 2009."

Similar presentations


Ads by Google