ACC QLD/NT Property Committee ROAD MAP: A 4-Stage Property Development Process for Churches, Schools and Other Facilities Version 1: August 2013.

Slides:



Advertisements
Similar presentations
Business and Legal Issues in Developing Vacant Land and Underutilized Existing Buildings Jeffrey G. Wright Nixon Peabody LLP June 28, 2007.
Advertisements

Managing the Health and Safety of Contractors
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Large Capital Process – What is it? Archdiocese of Atlanta Office of Planning and Research Archdiocese of Atlanta Large Capital Process – What is it?
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
Contractor Safety Management
Disposing of a Property Asset Russell Martoo Managing Director RCP Project Management – Development Management – Project Programming – Delay Claim Advisory.
Out of school hours care Contract management plan information session.
Helen Glaze Compliance Associate 1. 2  General Compliance – How Do You Rate?  Client Care Letters & Terms of Engagement.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
Protection Against Occupational Exposure
Genesis Solar Module Brochure ™
Structures for Investors Presented by: Kerrie-Anne Bailey KAS Tax & Business Solutions Phone: (07) April.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Introduction Definition Advantages for employees and employers
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
Click on Next to continue Introductio n Inputs Tools and Techniques Outputs Next 12.2 Conduct Procurements: Introduction The process of obtaining seller.
Constructionsite Roles in Construction Ron Gatepain.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
TSUNAMI RELIEF PROGRAM KICK OFF MEETING. INTRODUCTION WHAT IS PROCUREMENT? WHY IS UNDERSTANDING PROCUREMENT SO IMPORTANTS? WHAT ARE THE BASIC PRINCIPLES.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
1 Legal Aspects of Implementing the Crown Land Policy Presentation to the Ministry of Natural Resources, Government of the Turks and Caicos Islands By.
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
This PowerPoint has been produced for the public and is made available for non-commercial use (e.g. toolbox meetings,
Cardiff and Vale UHB Bwrdd lechyd Prifysgol Caerdydd a’r Fro NHS R&D Overview How to avoid the common pitfalls? Thomas Fairman Research Liaison Manager.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Chapter 2 Introduction to Construction Procedures
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Framework for the Closure Process in respect of Thubelisha Homes and Servcon Housing Solutions (PTY) Ltd Presentation to: Portfolio Committee on Housing.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
4 Things to Consider Before Purchasing a Used Car.
Stephanie Norris Partner, Purcell ‘Getting Building Work Done’ HRBA/Purcell event 09 June 2016.
Contract Compliance Training
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
Mike Ellis Executive Director – Property + Projects
The Design Team Carl James.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
APARTMENT BLOCKS – DEALING WITH DEFECTS
RIBA Plan of Work 2013.
(Additional materials)
Contract Compliance Training
Mortgage Broker - The Ultimate Home Buyer's Guide
Temporary Works Co-ordination
Congratulations, your application has been successful… …what next?
Project Development and Managing your Build Agenda
Quality Management Systems – Requirements
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
North of Tyne Community Led Local Development
NORTHERN PRESBYTERY PROPERTY AND FINANCE WORK GROUP PROPERTY WORKSHOPS NOV Nov. Forrest Hill CHURCH 15 Nov St Johns Papatoetoe.
Introduction DEFINATION :-
Environmental Upgrade Finance
Candidate Registration & Induction
Due Diligence In Waste Service Procurement Greg Freeman.
RIBA Plan of Work 2013.
RIBA Plan Tom Robinson sir david Swindells Vii
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

ACC QLD/NT Property Committee ROAD MAP: A 4-Stage Property Development Process for Churches, Schools and Other Facilities Version 1: August 2013

STAGE ONE: FEASIBILITY STUDY STAGE TWO: BUSINESS CASE STAGE THREE: DETAILED DESIGN STAGE FOUR: CONSTRUCTION ACC QLD/NT PROPERTY COMMITTEE: THE 4 STAGE PROCESS FOR PROPERTY DEVELOPMENT AND IMPROVEMENT OF CHURCHES, SCHOOLS AND OTHER FACILITIES APPROVAL REQUIRED TO PROCEED Version 1: August 2013 See Disclaimer

STAGE 1 FEASIBILITY (48 Hours) Get third party advice from ACC Property Committee Explanation: The Feasibility Stage will be encountered many times during the life of the Church as congregations consider the purchase of new property, the leasing of new premises, the renovation and upgrade of existing facilities etc. The Church must clearly identify what the future long-term need requirements are as this will assist in eliminating unsuitable sites and in wasting resource on short-term alterations. The Feasibility Stage can sometimes be time constrained especially when a property is up for sale or lease and the Church needs to act quickly to get a contract on the property. As such the Feasibility Stage has a 48 hour timeframe in which the Church needs to obtain some frank and realistic assessment on the property being considered for purchase or rental prior to entering into a ‘conditional’ contract which must, at the least, contain a ‘due diligence’ clause. The ACC Property Committee has access to a number of property developers who are able to assist the Church with quick and practical advice as to whether a contract should be pursued or not. This advice by nature will be very rough and more of a snapshot of the current situation and data obtained. However it will provide the Church with a frank perspective of whether the property is suitable for their needs. If a contract is to be entered into, it must be ‘conditional’ so that the Church has ample time to engage consultants and to prepare the Business Case. It is strongly recommended that the contract be conditional for at least 30 – 60 days to enable the Church to engage consultants, to get advice, to prepare the Business Case and to get endorsement. The approval to proceed with signing the contract and moving into the Business Case rests with the Church Board and they must have time to weigh up all matters before committing the Church to substantial risk. It must be stressed that the first property a church finds has historically not been the most suitable. It is recommended the procurement of a suitable property not be rushed but systematically researched until the right one is found. Preliminary Legal and Bank advice. Conditional contracts mentioned above need legal advice for cost budgets, realistic time frames and other conditions such transfer duty. Banks/lenders should also be consulted for loan feasibility and their time frames for approvals, etc. Stage 1: FEASIBILITY CHECK CHURCH CONSTITUTION FOR APPROVALS OR VOTING REQUIRED TO PROCEED TO NEXT STAGE See Disclaimer Version 1: August 2013

STAGE 2 BUSINESS CASE (30-60 DAYS) Engage Town Planners to undertake due diligence and prepare DA Engage Architect to prepare and cost preliminary building drawings Shop around Banks to sort out finance Obtain Legal advice on contract Obtain Church Board approval Explanation: Stage 2, the Business Case, involves the church engaging a number of professionals to undertake key investigations to ensure the development is suitable and the contract can go ‘unconditional’. Town Planner: All sites need Local Council Development Approval prior to specific uses of the building or site. The Town Planner will firstly undertake ‘due diligence’ to ascertain if Council would entertain the proposed development / use of the site or building. If there are no great impediments (planning / services) and Council approval seems assured, the Town Planner should continue to be engaged to undertake a planning study and lodge a Development Application for the proposed development / use. Architect: The cost of buildings or renovations, office fitouts and multi-media are often much more than expected, especially as Council charges, external infrastructure works and internal site works such as car parks and landscaping add to the total cost of the project. An architect is engaged to develop concept drawings for the building, fit-out and engineering works and to provide a ‘total’ cost estimate for the site development. Care must be taken to see that this estimated cost includes all costs. Once satisfied all costs are accounted for, it is recommended that a contingency of 10-20% be added to the cost provided by the architect to cover those additional costs that are not yet obvious. Bank/Lender: The financing of the development needs to be carefully thought through by the Church. It is strongly recommended that a number of banks be approached to identify the best financing arrangement. Legal: Detailed advice needs to be sort prior to the contract going ‘unconditional’. It is expected the solicitor will examine and endorse all aspects of the development prior to advising the contract can be executed. The final step is for the Church membership and/or Church Board to approve the Business Case. The Business Case must be carefully considered as this is the last opportunity to withdraw or make changes prior to the Church being exposed to considerable design costs. Stage 2: BUSINESS CASE CHECK CHURCH CONSTITUTION FOR APPROVALS OR VOTING REQUIRED TO PROCEED TO NEXT STAGE See Disclaimer Version 1: August 2013

STAGE 3 DETAILED DESIGN (60-90 DAYS) Engage Architect to prepare and cost detailed building drawings (incl structural and engineering drawings) Engage Mechanical and Electrical engineers to prepare drawings for fire safety, air conditioning, waste, water, lighting, data. Engage Quantity Surveyor to determine a an accurate cost estimate Engage Building Certifier to approve Building Application Check Church Constitution re obtaining Church and/or Board Endorsement to proceed to construction. Explanation: It is essential that Stage 3 – the detailed design phase be undertaken by professional consultants who are familiar with the site location and standard of construction proposed by the Church. The engagement of consultants for Stage 3 is not cheap but every effort must be made by the church to understand and to critique the drawings prior to letting the construction contracts. This time spent thinking about each and every aspect of the construction will save considerable variation claims when the building works begin. Ensure external services upgrades (electricity/communications etc.) are accounted for and timeframes can be met. It is important that an accurate cost estimate is prepared using quantities calculated by a quantity surveyor so that the Church is well aware as to its total liabilities for the development. Once all drawings have been amended to the satisfaction of the Church and the Board endorses the construction to proceed, the Church is then able to engage either a building contractor, or alternatively a project manager to oversee the works. Care must be taken with the later particularly the legal responsibilities of any Church that wants to assume responsibility for the development works rather than engage a builder. The land must be owned by the church before any work is undertaken. Stage 3: DETAILED DESIGN CHECK CHURCH CONSTITUTION FOR APPROVALS OR VOTING REQUIRED TO PROCEED TO NEXT STAGE See disclaimer Version 1: August 2013

STAGE 4 CONSTRUCTION ( DAYS) Engage Builder Engage Architect to oversee the works and ensure compliance Explanation: Stage 4 sees the building works and associated engineering site works undertaken by contractors. Note that the Church must settle on the property before any work commences. It is important that the Church ensure all registrations, insurances and licenses are in place before the contract is signed with the builder. It is strongly recommended that the Church take an active role in ensuring that construction adheres to the approved drawings. The completion of the construction phase will see the builder advise the church of ‘practical completion’. It is recommended that the Church either retain an architect or engage a specialist inspector to regularly inspect the construction works for any defects or omissions and to sign off on the Practical Completion. Stage 4: CONSTRUCTION Disclaimer: This document is intended for information purposes only. Please ensure that you obtain the most current version of this document before proceeding. Version 1: August 2013

ACC QLD/NT Property Committee ROAD MAP: A 4-Stage Property Development Process for Churches For more information please contact: Brett Mullen – Or visit the ACC QLD/NT website Version 1: August 2013