LAr20 Goals & Plans Integrated R&D Plan Development Bruce Baller November 23, 2009.

Slides:



Advertisements
Similar presentations
S4 Proposal for a Liquid Argon Detector at DUSEL Marvin L. Marshak/University of Minnesota Thanks to Bonnie Fleming for multiple slides. 1.
Advertisements

J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
K.T. McDonald DUSEL Workshop (BNL) Oct. 16, What Do We (I?) Know About Efficiency And Backgrounds in e Appearance Studies with a Large Liquid Argon.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
Data Acquisition WBS Jon Urheim – LAr20 Review- WBS – Data Acquisition System Outline Scope & Requirements Overview ES&H and QA Organization/Contributors.
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
Status of LBNE LAr and LAr1 at FNAL Bruce Baller - Fermilab.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
CERN LBNE Test Experiment. Plan view of Bat
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
David Finley / Liquid Argon TPC Workshop / July 11, Yale University Slide 1 The Ultimate Step The Penultimate Step Costs and NuSAG Some On-Going.
David Finley / LongBaseLine Study / June 27, Fermilab Slide 1 The Next Significant Steps LArTPC Costing Methodology Ongoing R&D Summary LArTPC Design.
Greetings to Veljko from Fermilab December 9, 2010.
Liquid Argon is a bright Scintillator (40,000 photons/MeV) and allows free electrons to drift meters under electric fields of 0.5 kV/cm. Liquid Argon presents.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
Liquid Argon Time Projection Chamber: Purity and Purity Monitoring DAVID GERSTLE – LArTPC – YALE UNIVERSITY/FNAL 31 May 2006 – FNAL Users’ Meeting Materials.
Work on Liquid Argon at Fermilab Stephen Pordes Fermilab Institutional Review June 6-9, 2011.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Logistics Workshop Summary Mike Headley August 19, 2015.
Long Baseline Experiments at Fermilab Maury Goodman.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
LAr R&D review; Nov 2009Slide 1 Closeout LAr20 R&D plan review General findings Thank you for an impressive set of presentations on the LAr R&D program.
TPC Design Concept: From MicroBooNE to LAr20
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon R & D work at Fermilab neutrinos WIMPS.
Questions and challenges of an underground multi-kton LAr TPC detector Outline Introductory Remarks Detector Optimization Vessel construction and integration.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Grounding Guidelines Developed for LBNE
David Finley / LongBaseLine Study / June 27, Fermilab Slide 1 Ultimate Step and Penultimate Step LArTPC Costing Methodology Ongoing LArTPC R&D Summary.
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
David Finley, Fermilab / October 3, 2005 on LArTPC Slide 1 LArTPC: Large Liquid Argon TPC for the NuMI Off-axis Beam First Point: Try to recognize intellectually,
3D Event reconstruction in ArgoNeuT Maddalena Antonello and Ornella Palamara 11 gennaio 20161M.Antonello - INFN, LNGS.
Work on Liquid Argon at Fermilab Stephen Pordes Fermilab Institutional Review June 6-9, 2011.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
Homestake DUSEL Project Management and Systems Engineering Richard DiGennaro LBNL April 20, 2007.
Progress Report on GEANT Study of Containerized Detectors R. Ray 7/11/03 What’s New Since Last Time?  More detailed container description in GEANT o Slightly.
Concept Design for LBNF Far detector (LAr single phase)
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
35ton and LAPD cryostats and future DUNE detector development.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
Laser Calibration of a Liquid Argon TPC G. Sinnis J. Danielson W. Sondheim.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
MicroBooNE Experiment Cat James – MicroBooNE Project Manager DOE Managers Site Visit August 23, 2010.
Value Engineering proposal: Putting APA’s on outside or put short drift cell on outside April 21, 2014, Post meeting rev. April 25, 2014 Russ Rucinski.
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
LBNE Reconfiguration Engineering/Cost Working Group Report Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group Fermilab.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
Long-Baseline Neutrino Facility LBNF LBNC: Far Site Update and Planning Mike Headley LBNF Far Site Facilities Project Manager January 11, 2016.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
MicroBooNE Experiment Gina Rameika Fermilab DOE Annual Science & Review July 12-14, 2010.
IEFIG update Joe Lykken | iEFIG Chair ELBNF IB phone meeting | 6 March 2015.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Experimental Hall in Mountain Regions
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Jim Fast Pacific Northwest National Laboratory
EURONu Collaboration Board,
WBS 1.03 Readout Systems Scope, Cost and Schedule
Americas KlyCluster Cost Analysis Overview
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Cryogenic cavern in Asian site
DS20k Integration Workshop
Presentation transcript:

LAr20 Goals & Plans Integrated R&D Plan Development Bruce Baller November 23, 2009

Outline LAr20 – TPC basics – Participants – LAr20 reference design parameters – Detector concepts & short term plans R&D Plan Development – The historical plan – Risk analysis – Additions to the historical plan 2 Director's Review of LAr Integrated Plan, Nov 23, 2009

3

Active LAr20 Institutions BNL – Cryogenics, TPC, cold electronics Indiana – Cryostat, cryogenics FNAL – Cryostat, cryogenics, cavern & infrastructure, installation planning, warm electronics, physics R&D Michigan State – Cold electronics Minnesota – Installation planning Tufts – Physics R&D UCLA – TPC, HV feedthrough Yale – TPC, Physics R&D 4 Director's Review of LAr Integrated Plan, Nov 23, 2009 ~30 active participants

LAr20 Conceptual Design Options – Membrane cryostat is attractive if evacuation is not required Effective use of the excavated cavern volume Design used in LNG tankers of volume ~10x LAr20 Over 200 tankers in service since 1970 ~CD2 level costing information received from mfg 5 Director's Review of LAr Integrated Plan, Nov 23, 2009

6 1m of foam glass instead of foam panels

Alternatives for CD1 Modular Soup Can  Cryostat configuration  Modular cryostat is our backup if evacuation IS required  Less effective use of excavated volume than membrane  Soup Can configuration – Not considered for CD1  Standard tank construction for above-ground application  Non-standard cavern excavation 7 Director's Review of LAr Integrated Plan, Nov 23, 2009

Cryostat Options Costing Director's Review of LAr Integrated Plan, Nov 23,  Excavation & outfitting cost ~$800/m 3  LAr cost ~$1k/kton  Membrane cryostat cost ~$2k/m 2  TPC, electronics, etc cost not included

Membrane Cryostat Cross Section 9 Director's Review of LAr Integrated Plan, Nov 23, 2009

Cryostat “Kit” Components Director's Review of LAr Integrated Plan, Nov 23,

Labor Estimates Director's Review of LAr Integrated Plan, Nov 23,

Tools for Installation Director's Review of LAr Integrated Plan, Nov 23, Automatic welding machine Resin mixing machine Gluing machines

Proposal Cost Estimate Director's Review of LAr Integrated Plan, Nov 23, Proposal cost estimate is proprietary Cost ~$2k/m 2 w 30% UG labor premium, FNAL technicians

GEOSTOCK Pilot Plant South Korea 14 Director's Review of LAr Integrated Plan, Nov 23, 2009 “Underground Storage of LNG in Mined Rock Cavern”, Nicolas Gatelier, IGRC, Paris 2008 Membrane cryostat Constructed & operated in 2003 – 2005 Proposing a 200 kton LNG storage plant

LAr20 Reference Design #1 Fiducial mass = 1/6 of 100kt Water Cherenkov  16.7kt (LAr20) – Size ~20m x ~20m x ~40m Drift distance 2.5m 2 or 3 wire planes, wire spacing = mm – Cost-benefit decision ( e ID efficiency, NC  o rejection) – ~500k channels for 2 wire planes with 5mm spacing Director's Review of LAr Integrated Plan, Nov 23,

Reference Design #1 TPC Concept Director's Review of LAr Integrated Plan, Nov 23, m Cathode Plane Wire Planes Start with the design and cost estimate of the MicroBooNE TPC module (~10m long). Increase the width of the wire planes to 4m Add mirror module 4m 11m Pre-assembled wire planes 4m x 10m x ?cm Shipping box fits in Yates supercage

Depth Options for CD1 300 level – oscillation physics, pdk?, SN ’s? – Drive in access 4850 level - oscillation physics, pdk, SN ’s – Shaft access Director's Review of LAr Integrated Plan, Nov 23,

Cavern Cost Study The LAr20 cavern concept has a 20m deep pit – Not the “standard” DUSEL lab module DUSEL has dropped development of the 300 level We are conducting a cost study to address these uncertainties – Managed by Chris Laughton (FNAL mining engineer & LAr20 system manager) – Request for Proposal issued in October to mine engineering consultants – Currently reviewing 4 proposals Director's Review of LAr Integrated Plan, Nov 23,

Cryo Engineering Consultants Contract with Arup for – Conceptual design of membrane cryostat – Conceptual design of modular cryostat – Conceptual design of cryogenics plant Arup capabilities (w Linde sub-contract) – Conceptual design of >20 LNG cryogenic & cavern storage facilities – He and H2 liquefier systems – Under contract with DUSEL 19 Director's Review of LAr Integrated Plan, Nov 23, 2009

Cryo Plant Concepts LN2 cooling system – Surface or UG – Re-liquefy N2 – LN2 tracer in cryostat(?) Heat load – 20kw cryostat + 20kw electronics – ~400kw power consumption Director's Review of LAr Integrated Plan, Nov 23, Note: This layout inaccurate to meet purity requirements

Cold (87K) Electronics Concept Director's Review of LAr Integrated Plan, Nov 23,  Cosmic Ray Test Stand CMOS tests  Edwards (Michigan State)  CMOS ASIC Development & testing  Radeka, Rescia (BNL)  Yarema (FNAL)  Cressler (Georgia Tech)  Integration, grounding  Marvin Johnson (FNAL)

LAr20 Readout Scheme Director's Review of LAr Integrated Plan, Nov 23, Event Filter Raw Data Rate: ~200 GB/s (384 Mbps X 5.5k) Event Filter will receive optical signals, de-multiplex, decompress and find useful events, then send to Event Builder/DAQ Farm Data Rate to Event Builder: ~200 MB/s (200GB/s X 10 X ) H. Chen - BNL

LAr20 Short Term Plan The first cost estimate for the LAr20 Reference Design #1 should be available in Feb – Arup conceptual designs of the cryostat options & cryogenics plant complete – LAr20 team goal: Complete the cost estimate for the Reference Design #1 – Cavern cost study completed(?) – FNAL does first pass estimate of ODH mitigation Calculation of the fiducial volume for Reference Design #1 can feasibly be available in Feb We will have a CD-1 level estimate of cost per kton of fiducial volume Director's Review of LAr Integrated Plan, Nov 23,

R&D Plan Development “Historical” (ca 2005) plan – Test stands & experiments (next 2 slides) Development of the proposed plan – Methodology Risk identification  risks that are not being addressed by the historical plan Risk classification  level of importance Risk mitigation  Propose new R&D activities /experiments – Analysis done by the Integrated Plan development group over an intense 3 month period – This Director’s Review is the first external airing of the plan Director's Review of LAr Integrated Plan, Nov 23,

Director's Review of LAr Integrated Plan, Nov 23, The Historical Plan

Director's Review of LAr Integrated Plan, Nov 23, The Historical Plan

Integrated Plan Development Group Flavio Cavanna (L’Aquila) Ornella Palamara (Gran Sasso) Bruce Baller (FNAL) Bonnie Fleming (Yale) Cat James (FNAL) Rob Plunkett (FNAL) Stephen Pordes (FNAL) Gina Rameika (FNAL) Brian Rebel (FNAL) Jon Urheim (Indiana) Director's Review of LAr Integrated Plan, Nov 23, Un ringraziamento speciale

Risk Identification Assume that all R&D activities in the Historical Plan are successful – ArgoNeuT is taking data, ~10k neutrino interactions, will publish QE cross sections – Analysis code developed for 3D reconstruction of tracks and showers – LAPD demonstrates long electron lifetime without first evacuating the cryostat – MicroBooNE publishes results from 100k sample of neutrino interactions, demonstrates long electron lifetime without first evacuating the cryostat What risks remain that might prevent successful operation of LAr20? Director's Review of LAr Integrated Plan, Nov 23,

Risk Classification Director's Review of LAr Integrated Plan, Nov 23,

Director's Review of LAr Integrated Plan, Nov 23, Mitigation Notes

Director's Review of LAr Integrated Plan, Nov 23, Mitigation Notes

Director's Review of LAr Integrated Plan, Nov 23, Calibration test Cryostat prototype Installation/Integration prototype Electronics stress test HV feedthrough prototype Review of FNAL cryo safety std Proposed new R&D Activities

Final Comments The proposed set – Reduces risks to an acceptable level – Is cost effective – Takes into consideration our understanding of schedule and resource constraints Subsequent talks will detail the risks in each category and the mitigation plan Director's Review of LAr Integrated Plan, Nov 23,