An Update on the Clean Development Mechanism National Workshop on Baseline Methodologies CD4CDM Project (Phase II) Sami Kamel, Ph.D. UNEP RISOE Center,

Slides:



Advertisements
Similar presentations
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Advertisements

Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
Implementation of Capacity Development for CDM Project in Viet Nam Nguyen Khac Hieu Climate Change Coordinator Vietnam National Office for Climate Change.
UNFCCC Secretariat SDM programme CDM‘s contribution to global climate action; its sucesses and further contribution Fatima-Zahra Taibi, UNFCCC secretariat.
Capacity Development for CDM - National Workshop on PDD, Cairo, June Capacity Development for CDM Fourth National Workshop Cairo, June.
KYOTO PROTOCOL MECHANISMS EURASIA 歐亞 Solicitors and Advocates.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
UNEP Collaborating Centre on Energy and Environment Capacity Development for the Clean Development Mechanism Myung-Kyoon Lee
1 Capacity Development for the Clean Development Mechanism CD/CDM Project Morocco Ali Agoumi National coordinator Bonn - SB18-June 2003 KINGDOM OF MOROCCO.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
Compilation and analysis of available information on ways and means to enhance equitable regional and subregional distribution of projects under the clean.
Climate Change and the Clean Development Mechanism
CDM National Authorities : an Example Prepared for the National Workshop on Capacity Development for Clean Development Mechanism (CD4CDM) March 2003,
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
GERMAN SUPPORT for CDM CAPACITY BUILDING Marrakesh, Morocco 22. April 2004 Holger Liptow Climate Protection Programme (CaPP) CaPP.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
Institutional Arrangement for CDM: Case of Peru Case of Peru Regional Meeting for DNAs CD4CDM Project Marrakech, Morocco 23 April 2004 Sami Kamel UNEP.
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
Proposed plan to implement Capacity Development for CDM project in the forthcoming period Dr. DAO DUC TUAN Eng. NGUYEN KHAC HIEU National Office for Climate.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Prasetyadi Utomo Ministry of Environment of Indonesia CD4CDM Workshop Pathumthani, Thailand 19 – 21 October, 2005 Indonesia’s Policy on CDM Implementation.
" Current status and perspectives of Clean Development Mechanisms Buenos Aires, September 2003 Content of the presentation: The cdm.unfccc.int homepage.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Overview of Capacity Development for CDM Project (CD4CDM) Jerba CDM Investment Forum, September 2004 Sami Kamel UNEP RISOE Center, Denmark.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
Canada’s CDM & JI Office Project Facilitation Support Through Canada’s CDM and JI Office.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Summary National Workshop Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December Capacity Development for.
Overview on CDM By Ann Gordon Ministry of Natural Resources and the Environment 14 th July 2011.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Structure of the presentation The origins of CDM What is the CDM? Players of CDM.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First Regional Workshop, Tunis January Cross-cutting issues to.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
Barriers to the Successful Implementation of Kyoto Mechanisms (JI/CDM) in CEE and CIS Countries Marina Shvangiradze Ministry of Environment Protection.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 REVIEW AND FUTURE PLAN OF TASK.
UNEP Collaborating Centre on Energy and Environment Latest Development Influencing the Project CD4CDM January 2003 Phuket, Thailand.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December Capacity Development for.
UNEP RISØ Centre on Energy, Climate and SD Capacity Development for the CDM A National Workshop Hanoi, Viet Nam September 11, 2003 Myung-Kyoon Lee
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
Sustainable Development: Cooperation in FEALAC Sustainable Development: Cooperation in FEALAC October ,200 7 Economy and Society WG Delegation of Japan.
1 Introduction to UNEP/ UCCEE Project on Capacity Development for CDM Asian Institute of Technology, Thailand 10 December 2002 Manila, Philippines.
BACKGROUND TO THE CDM By Philip M. Gwage. Structure of Presentation Background  Climate Change Convention  Kyoto Protocol The Clean Development Mechanism.
Introduction to UNEP/ UCCEE Project on Capacity Development for CDM Asian Institute of Technology, Thailand 27 Nov Hanoi, Viet Nam.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Second SSA Regional Workshop on “Capacity Development for the Clean Development Mechanism” Organized by: Energy Research Centre (ERC), South Africa and.
Clean Technology (PB386) Click to edit Master title style Numfon Eaktasang, Ph.D.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Cambodia National Work Plan
Capacity Development for the CDM
Presentation transcript:

An Update on the Clean Development Mechanism National Workshop on Baseline Methodologies CD4CDM Project (Phase II) Sami Kamel, Ph.D. UNEP RISOE Center, DenmarkCasablanca 28 January 2004

2 Capacity Development for CDM (CD4CDM) Project Background   CD4CDM is a U$10 million project funded by the Netherlands Ministry of Foreign Affairs.   Project is being implemented in 12 developing countries by the United Nations Environment Programme (UNEP) through its UNEP RISØ Centre (URC) in Denmark.   Three countries each from four regions:   Asia: Cambodia, the Philippines, Viet Nam.   Latin America: Bolivia, Ecuador, Guatemala.   Middle East & North Africa: Egypt, Jordan, Morocco.   Sub-Saharan Africa: Côte d’Ivoire, Mozambique, Uganda.

3 Project’s Development Objectives Create an enabling business and regulatory environment for CDM investments in the target countries through: Developing institutional capability and human capacity among public and private institutions in order to fully participate as equal partners with developed countries in the formulation and implementation of CDM projects. Support the establishment of Designated National Authorities (DNAs). Establish national investment strategies, regulatory framework and procedures for CDM investments. Create a pipeline of CDM projects.

4 Kyoto Protocol: Ratification and Entry-into-force Entry into force requires 55 Parties to the Convention + Annex I Parties accounting for 55% of 1990 CO2 emissions from that group to ratify. Possible combinations for entry into force: US + EU-15 US + Russian Federation + one other major emitter EU + Russian Federation + Japan + Canada + Poland or Australia Already Ratified: European Union, Japan, & Canada (total less than 55%). Already Rejected: United States (36% of Annex I emissions) & Australia (2.2 % of Annex I emissions). Undecided: Russia (17.4% of Annex I emissions). Non-Annex I countries (Developing countries): Many already ratified although GHG reduction is voluntary.

5 The Future of Kyoto Protocol: Possible Scenarios Status Quo: KP is not ratified but neither abandoned by any country. Parties stay in the current uncertain state waiting for further signals from Russia. Could mean continuation of CDM activity though at a slower pace. Abandon KP: More countries join US and Australia in rejecting KP on the grounds that it is unlikely to come into force. Negotiation of a new instrument with the intention of bringing US on board. New instrument could focus on clean energy technology transfer, renewable energy targets, and bilateral agreements focusing on, for example, sinks. Re-Open KP: EU fed up of waiting for Russia to ratify and re-opens KP to change most controversial sections and bring the others back to the table.

6 Comparison between Total vs. Per Capita emissions: US & China

7 CDM Concept CDM is to allow Annex I countries meet part of their emission reduction requirements for first commitment period at lower costs in non-Annex I countries than could be done domestically. Annex I countries are allowed to acquire Certified Emission Reductions (CERs) by implementing GHG mitigating projects in non-Annex I countries. ODA (Official Development Assistance) funds can not be used in CDM investments.

8 There is no white list for technology used in CDM projects (only a negative list). CDM sectoral examples: End-use energy efficiency improvement. Supply-side energy efficiency improvement. Renewable energy. Fuel switching. Industrial processes. Waste management/biomass. Negative List: Sinks (only afforestation and reforestation – No forest management). No nuclear projects.

9 Key Players in the CDM Process CDM Executive Board (EB). Designated Operational Entities (DOE). Designated National Authorities (DNA). CDM Project Developers/Investors.

10 CDM Executive Board (EB) Ten members (fixed) and ten alternating all with specialized technical expertise. Responsibilities include: Review & approve new methodologies related to baseline and monitoring plans. (Note: methodologies approved by EB could be used for other future projects). Provision of simplified procedures for small scale CDM. Accreditation of Designated Operational Entities (DOEs). Develop and maintain a CDM Project Registry. Establish Panels (Accreditation Panel and Methodologies Panel). Issue CERs. EB have held 11 meetings and Meth Panel 8 meetings (meetings documentation is available on UNFCCC’s CDM web site).

11 Registration of CDM Projects   The CDM registry is being constructed and expected to be ready by first quarter of It will contain public information on all CDM projects: issuance, holdings, transfer and acquisition of CERs.   At the EB6, the following fees were decided for the registration of a CDM project. The fee for small-scale CDM projects has been reduced to U$5,000:

12 Designated Operational Entities (DOE) Independent third party assigned by EB to conduct auditing of CDM project activities in host countries. Project developers choose the DOE they wish to deal with. Key responsibilities: Validate proposed CDM projects on basis of set criteria. Verify and certify reduction in GHG from CDM projects through monitoring of project management and transparency. Maintain publicly available list of all approved and on-going CDM projects and the amount of CERs approved for each project. Will post the PDD for 30 days for comment before final approval.

13 Update on DOEs 19 entities have applied for accreditation (Applicant Entities – AE): 10 Western Europe, 1 US (Nexant), 6 from Japan, 1 South Korea, and 1 Malaysia. No AEs from Africa, MENA, or South America. EB7 approved “Procedures for Accreditation of Operational Entities for CDM.” Procedure consists of: Desk review by an Accreditation Team (AT) (completed for 13 AEs). On-site assessment by AT (completed for 6 AEs). Witnessing activity by AT (completed for 4 AEs). Four AEs received “Indicative Letter” and therefore will be ready to become Designated Operational Entities early next year.

14 Applicant Entities

15 Designated National Authority (DNA) A country-level focal point for CDM, to be based in Ministry of Environment, Energy, or other relevant institution. DNA responsibilities include: Responsible for issuing Letter of Approval confirming the CDM project contributes to sustainable development in the host country. DNA of investor’s country will send similar letter to DOE in support of the project. Link between international CDM investors and potential projects in the country. May be involved in marketing of CDM project pipeline. Will establish national CDM regulations, strategy, and criteria for sustainability and approval. Monitor CDM sector in the country. To date, 34 countries have informed the UNFCCC of their establishment of DNAs (5 of which are Arab countries).

16 Emerging DNA Strategies DNAs to be active in global marketing of local CDM projects: Philippines plan to use their DNA to globally market CDM projects in the country. DNAs offering incentives (reducing transaction costs) to attract CDM investors: Peru DNA promises to complete the whole project approval process in 45 days at no charge!

17 CDM Investor Key responsibilities: Prepare Project Design Document (PDD). Propose baseline methodology and ensure additionality criteria. Calculate expected GHG reductions and CERs. Obtain all permits and approvals from DNA. Secure project financing.

18 PDD Content and Update Note 1: PDD for Small scale CDM contains same sections but only annexes 1 and 2 are required. Note 2: Annexes 3 & 4 have been removed and will be done separately by project developer only in case of a new methodology is being proposed. EB has just released new guidelines on how to propose a new methodology.

19 DNA DOE 1 DNA DOE 2 EB

20 CDM Status Summary Approved baseline methodologies: 6 (could be used by other projects). Pending baseline methodologies: 16. Of which the first is Zafarana 120 MW Wind Farm submitted by the Japan Bank for International Cooperation. Baseline methodologies recommended for approval: 3. Project Registry will be ready by first quarter of Details for Sinks (Aforestation and Reforestation) CDM projects were approved. At EB12 it was decided to develop a Frequently Asked Question section on the UNFCCC CDM web site.

21 Continue: CDM Status Summary Accredited DOEs: None. Registered Projects: None. Host countries: None. Buyer countries: None. Issued CERs: None. Carbon price estimate in end-2012 by poll at Annual General Meeting of International Emissions Trading Association in later October: 12 Euro/t CO2.

22

23 For More information on CDM