ElectroScience Lab Department of Electrical and Computer Engineering ElectroScience Laboratory The Ohio State University *Department of Electrical and.

Slides:



Advertisements
Similar presentations
S o f t w a r e D e f i n e d R a d i o
Advertisements

Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Introduction to Ultra WideBand Systems
Tri-Band RF Transceivers for Dynamic Spectrum Access By Nishant Kumar and Yu-Dong Yao.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
RF Circuit Design Chris Fuller /7/2012.
Ørsted DTU 1 The COSMOS Airborne Campaigns. Status October’06 N. Skou, S. S. Søbjærg, J. Balling, S. S. Kristensen, and S. Misra ØrstedDTU Technical University.
An SDR Riometer Marcus Leech, Keo Scientific (Under contract from Science Radio Laboratories)
ElectroScience Lab Studies of Radio Frequency Interference in SMOS Observations IGARSS 2011 Joel T. Johnson and Mustafa Aksoy Department of Electrical.
1 Fully Digital HF Radios Phil Harman VK6APH Dayton Hamvention – 17 th May 2008.
RFI shielding and mitigation techniques for a sensitive search for the 327 MHz line of Deuterium Alan E.E. Rogers, Joseph C. Carter, Preethi Pratap M.I.T.
DATA TRANSMISSION SYSTEM MIKE REVNELL. OUTLINE Top level specifications Basic architecture Fiber plant DTS module Digitizers Formatter Deformatter Transition.
08/16/01. Link Budgets for Cellular Networks Presented by Eric Johnson.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
08/16/01.
Fiber-Optic Communications
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
Harbin Institute of Technology (Weihai) 1 Chapter 2 Channel Measurement and simulation  2.1 Introduction  Experimental and simulation techniques  The.
NorCal Tech 2005 Technical Conference
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
ElectroScience Lab Department of Electrical Engineering ElectroScience Laboratory The Ohio State University 25th June 2003 Design of an L-Band Microwave.
Ship-Based Observations of Ocean Waves Using Multiple X-Band Radars Christa McKelvey, Shanka Wijesundara, Andrew O’Brien, Graeme Smith, Joel T. Johnson,
6-1 EE/Ge 157b Week 6 EE/Ae 157 a Passive Microwave Sensing.
ElectroScience Lab IGARSS 2011 Vancouver Jul 26th, 2011 Chun-Sik Chae and Joel T. Johnson ElectroScience Laboratory Department of Electrical and Computer.
Patrick Lazar, Tausif Shaikh, Johanna Thomas, Kaleel Mahmood
Department of Electrical and Computer Engineering ElectroScience Laboratory The Ohio State University 10th November 2005 Studies of Radio Frequency Interference.
Technion – Israel Institute of Technology Department of Electrical Engineering Winter 2009 Instructor Amit Berman Students Evgeny Hahamovich Yaakov Aharon.
Analysis of Phase Noise in a fiber-optic link
GBT Spectral Baselines – Tuesday, 11 March 2003 GBT Spectral Baseline Investigation Rick Fisher, Roger Norrod, Dana Balser (G. Watts, M. Stennes)
Student: Vikas Agarwal Guide: Prof H S Jamadagni
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Thaddeus Johnson and Torie Hadel
An RFI Mitigation Strategy for the Allen Telescope Array Geoffrey C. Bower UC Berkeley.
Techniques for interference mitigation on RATAN-600 radio telescope in dm ranges A.B. Berlin, N. A. Nizhel'skij, M. G. Mingaliev, P. G. Tsybulev, D. V.
1 of 22 Glaciers and Ice Sheets Interferometric Radar (GISIR) Center for Remote Sensing of Ice Sheets, University of Kansas, Lawrence, KS
Advances In Millimeter Wave Measurements Banded Differential and Pulse Measurements.
EXPERIMENTAL STUDY OF RADIO FREQUENCY INTERFERENCE DETECTION ALGORITHMS IN MICROWAVE RADIOMETRY José Miguel Tarongí Bauzá Giuseppe Forte Adriano Camps.
Proposed Versatile 1.2 to 14 GHz Radio Telescope Receiver S. Weinreb, JPL/Caltech, Draft July 5, 2005 Contents 1.Introduction and intended applications.
Doc.: IEEE /0013r0 Submission April 2008 Joel Johnson, IEEE GRSSSlide 1 Coexistence Issues for Passive Earth Sensing from GHz Notice: This.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
ECG Monitor Objective o Provide users an economical ECG monitoring device o Raise awareness to the importance of a healthy heart and living o Allow doctors.
Casper 2010Marc Torres Part 2: Building blocks for the next generation.
ElectroScience Lab Department of Electrical Engineering ElectroScience Laboratory The Ohio State University 9th July 2002 Digital Receiver with Interference.
ElectroScience Lab Department of Electrical Engineering ElectroScience Laboratory The Ohio State University *Department of Electrical and Computer Engineering.
1 Detection of Cellular Activity Within A Defined Space Undergraduate Project – Final Presentation Spring 2008 Doron BrotEyal Cimet Supervisor:Yossi Hipsh.
Frank Ludwig, DESY Content : 1 Stability requirements for phase and amplitude for the XFEL 2 Next LLRF system for optimized detector operation 3 Limitations.
Ariadne’s Thread Kristian Zarb Adami. Simulator Aims ۞ Provide the system architect a tool to visualise trade-offs in designs ۞ Provide the scientist.
NASA Instrument Incubator Program Year 3 Interim Review
ECE 4371, Fall, 2015 Introduction to Telecommunication Engineering/Telecommunication Laboratory Zhu Han Department of Electrical and Computer Engineering.
Note: This brochure is designed to be printed. You should test print on regular paper to ensure proper positioning before printing on card stock. You may.
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
Digital Receiver for Interference Suppression in Microwave Radiometry
Philippe Picard 2 nd SKADS Workshop October 2007 Station Processing Philippe Picard Observatoire de Paris Meudon, 11th October 2007.
ElectroScience Lab Department of Electrical Engineering ElectroScience Laboratory The Ohio State University 29th April 2003 Digital Receiver with Interference.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
Cosmic Microwave Technology, Inc.
Digital Light Sources First introduced in 2001.
SE40 Meeting on Pseudolites JRC test results
DUAL POLARIZATION AND ZDR CALIBRATION IMPROVEMENTS 5.2(6)
SCADA for Remote Industrial Plant
BCTW calibration status and future
Data Taking Plans for 32T and 128T
Efficient mitigation of RFI at radio astronomy observatories
May 2003 doc.: IEEE /141r3 May 2003 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Rake Span.
Data Acquisition (DAQ)
EVLA Advisory Panel Mtg. System Overview
Real Time Spectrum Sensing using SDR for RFI Analysis
Presentation transcript:

ElectroScience Lab Department of Electrical and Computer Engineering ElectroScience Laboratory The Ohio State University *Department of Electrical and Computer Engineering Virginia Tech 10 th March 2004 Design and Demonstration of an Interference Suppressing Microwave Radiometer Grant A. Hampson, Steven W. Ellingson*, and Joel T. Johnson 2004 IEEE Aerospace Conference

ElectroScience Lab RFI Issues for Microwave Radiometers l A microwave radiometer is a sensitive receiver measuring naturally emitted thermal noise power within a specified bandwidth l Human transmission in many bands is prohibited by international agreement; these are the “quiet bands” ideal for radiometry l L-band channel quiet band is MHz: larger bandwidth would improve sensitivity if RFI can be addressed. No quiet band available for C-band radiometers l Even within quiet bands, RFI has still been observed - possibly due to filter limitations or intermodulation products l Many interferers are localized either in time or frequency: should be relatively easy to detect and remove with an appropriate system

ElectroScience Lab Outline l Design of an RFI suppressing radiometer l Description of our implementation l Experiment description l Initial results

ElectroScience Lab System Overview l Typical radiometer is a very “slow” instrument: power received is integrated up to msec scales by analog system before being digitized l Typical radiometer has a single, large bandwidth channel: susceptible to narrow band interference l Our design uses a digital receiver to allow much more rapid sampling of incoming data; this rapid sampling improves the ability to mitigate temporally localized RFI l Our design also performs a 1024 point FFT operation; improves ability to mitigate spectrally localized RFI l Processor must operate in real time so that final data rate can be reduced to a manageable level; implement processor in hardware (FPGA’s) Radiometer integration period (~msec) Time Pulsed interferer (~  sec)

ElectroScience Lab System Block Diagram Antenna Data Recording/ Control Low-noise front end Analog Downconverter Digital Downconverter ADC Asynchronous Pulse Blanker 1024 point FFT Frequency domain blanker Integration (not yet implemented)

ElectroScience Lab Example: Time Blanking of an ATC Radar l Time domain results: l Effect of varying APB threshold in frequency domain: Direct pathMulti-path? APB “Blanking” decision “Max held” spectra Averaged spectra

ElectroScience Lab Digital Back-End l System design includes digital IF downconverter (DIF), asynchronous pulse blanker (APB), FFT stage, and SDP operations l Dual channel implementation completed l Most blocks on separate boards to simplify testing and reconfiguration l Microcontroller interface via ethernet for setting on-chip parameters l Second prototype uses Altera "Stratix" FPGA’s: apprx LE, $260 l Designs for all components complete; DIF, APB, FFT, SDP, and capture card initial implementations functioning ADC DIFAPBFFTSDP 200 MSPS 100 MSPS I/Q Analog Devices 9410 ADC

ElectroScience Lab DIF/ APB ADC FFTSDPCapture Current Digital Back-End Implementation l Modular form used for processor boards: note microcontrollers l EEPROM's on each card for autoprogramming of FPGA's on power-up

ElectroScience Lab Experiments at OSU l Experiments designed to demonstrate radiometric accuracy in the presence of interference l Observations of a large water tank; external cal sources are ambient absorbers and a sky reflector l Highly accurate ground-based radiometry is tough due to contributions from objects not under view, including reflections l Keep cal targets exactly the same size as pool to reduce these effects; observations of pool as ambient temp varies also l Initial tests in existing RFI; artificial RFI to be added as tests progress Height (m)

ElectroScience Lab Antenna/Front End Unit l Front end Tsys approx. 200K neglecting antenna Temperature control used to maintain internal standards; rest of system not temperature controlled Terminator total power within 0.01 dB over ~1 hour after noise diode stabilization

ElectroScience Lab Dual Channel Downconverter l One channel is ~ MHz, other is ~ MHz l Downconverter, digital receiver, computer, and thermal control systems in rack inside lab l Working with system gain ~70 dB at present: moves –94 dBm in 100 MHz to –24 dBm; this triggers 4-5 ADC bits

ElectroScience Lab Pool and Cal Targets l Water pool is approximately 16’ x 32’ by 6” deep; use saline water to decrease skin depth and eliminate sub-pool contributions l Absorbers are 12” (a few 18”) to cover the area; mounted on “racks” that can be placed on pool by a team of 2-4 people l Reflectors are foil covered foam l Temperature of pool, absorbers, and ground around pool all recorded; salinity of pool checked for each experiment

ElectroScience Lab Pool and Cal Targets Absorbers: Assume Tb=Tphys Reflectors: Assume Tb=Tref~Tsky? Water: Tb~Twat+QTref Possible background contributions make precise calibration tough; data analysis to sort out these effects currently in progress

ElectroScience Lab Current Experiment Results l Hardware integration period 21 msec, switched every 1.33 secs through front end states, every 5 seconds through receiver mode Horizontally polarized data, absorber observation Radar at 1331 MHz apparent, along with other more CW RFI Blanker reduces radar effects, as well as saturation problems in FFT computation

ElectroScience Lab Initial Calibrated Brightnesses l Water observation using absorber/reflector cal, horizontal pol Blanker dramatically reduces influence of radar at 1331 MHz CW RFI in band not affected by blanker Some spectral features remain in blanker on data; caused by calibration issues Absolute value near expected water brightness Working to improve calibration/accuracy of this experiment

ElectroScience Lab Total Power Measurement Vs. Time l Water observation using absorber/reflector cal, horizontal pol Radar causes periodic huge change in total brightness; also a calibration bias through effect on absorber/reflector Blanker greatly reduces these effects Frequency domain blanker implemented in software; simple threshhold of brightness data Narrowband RFI not a major impact on total power in this experiment

ElectroScience Lab l Digital receivers have the potential to greatly improve radiometer performance in the presence of RFI: essentially a using a more capable receiver l Many options available beyond those chosen in our implementation; our basic algorithms still show reasonable initial performance l Still working to refine demonstration; improve accuracy to be able to demonstrate suppression of smaller RFI effects l We have also operated an L-band RFI monitoring system in aircraft experiments to gather data in a wider range of environments l Our system will be operated in C-band aircraft experiments in 2004 to explore suppression performance and to gather C-band RFI environment data Summary