Host SDC/SHA 12-13 May 2005 introduction project focuses on the design and deployment of warm climate emergency shelter for a family of 6 people latest.

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

Dr. Ruth Collins TrinityHaus
Evolution in the ShelterBox Solution Since 2000… Developments in whats in a ShelterBox Developments in individual items in the ShelterBox Improvements.
Portal Framed Construction
FRAMEDSTRUCTURE Members: Soriana Álvarez #C Teresa Tam #C Ainara Ricchiutti #C
16 th -17 th November 2006 | Geneva | co-hosted by UN-Habitat and CARE followed by Shelter updates: Volunteer, Register, Funding, Base Shelter Centre Shelter.
LAYOUT OF STEEL STRUCTURES
MUNCHY THE CATERPILLAR PRODUCT RELEASE DOCUMENT TM.
Timber, a truly sustainable resource, can be used to replace steel and concrete structures in multi-storey building. John Chapman, Senior Lecturer School.
OPERATIONAL SUPPORT EMERGENCY SHELTER SOLUTIONS Corinne Treherne Shelter Department, IFRC.
Bamboo Booklet – a Proposal Guidelines for the use of bamboo in humanitarian relief.
4 - 5 May 2006 | Geneva | hosted by IFRC Shelter Module update Jérôme Michon MSF-B Tom Corsellis Shelter Centre followed by: Guatemala, Bangladesh and.
1 Emergency and Transitional Shelter Concepts. 2 Definition of terms 1.What is “emergency shelter”? 2.What is “transitional shelter”? 3.What are “household.
Shelter response options 1.Emergency Shelter 2.Shelter assistance kits 3.Shelter grants 4.Core Houses )T-Shelter 5.Evacuation camp assistance 6.Permanent.
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
Drainage Products by REIVILO Ltd  Linear Drainage  Point Drainage  Access Covers  Pull Boxes  Other  Contact Details 2 Topics overview.
Reinforced Concrete VS Steel
Introduction to International Business Discussion Section April 6, 2007 Sanny Liao.
INTERIOR WALL FINISHES
COLUMNS.
Topic C1 Superstructures - walls
Designing Products and Processes with a Future. What does it take? Involve the customer Meet with the customer Listen to customer Educate the customer.
Bonding and Riveting By Peter Coffey Bodyshop Solutions Ltd.
Opportunities to Innovate in Aquaculture with Composite Materials Presentation at 1 st Annual Maine Aquaculture R&D Forum January 14, 2015 Stephen Von.
Structural Systems CM 105. Precast Concrete Framing Offer exceptional strength and resistance to seismic stresses and high degree of fire safety Concrete.
Care Home Forum 19 th May 2015 Sarah Chittock – Merton Civil Contingencies Officer Taryn Milton – Emergency Planning Manager – Epsom St. Helier.
Perspectives on Rainwater Harvesting: Past, Present and Future
Portal Frame Design.
Why Use MONAHRQ for Health Care Reporting? May 2014 Note: This is one of seven slide sets outlining MONAHRQ and its value, available at
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
© 2012 Autodesk Autodesk® Revit® Structure: From Design to Detailing and Fabrication to Construction Allen Levy Applications Specialist.
Prefabricated Houses Steel structure prefab house system.
FORMS, SCAFFOLDING and STAGING
Why Use MONAHRQ for Health Care Reporting? March 2015 Note: This is one of eight slide sets outlining MONAHRQ and its value, available at
UNHCR/InterWorks - Emergency Management Training Session 6.4. Assessment 2: Working with Sectoral Indicators - Sites and Shelters Corbis.
Day 1 Shelter Meeting 09a is hosted by Swiss Solidarity 08:30 – 09:00 09:00 – 09:15 09:15 – 09:30 09:30 – 10:30 10:30 – 10:50 10:50 – 11:00 11:00 – 11:30.
Future European issues on off-shore wind power deployment Steffen Nielsen Head of Section Danish Energy Authority Ministry of Transport and Energy European.
Partnering. The West’s response to Japan’s greater efficiency in major manufacturing industries Japan’s approach is based on cooperative, long term relationships.
17th - 18th November 2005 | Geneva | hosted by UN-Habitat Shelter Centre products Tom Corsellis & Antonella Vitale Shelter Centre.
Lecture 15 - Timber Wall Framing Example
FLAT SLAB Flat slab are also known as beamless slab, is a type of slab in which the flooring slab is directly supported on columns without the agency of.
Extrusion Process.
Sprinkler Loads on Trusses
FUNCTIONUSERMANUFACTURINGMARKETINGENVIRONMENTALMATERIALS MUST Aid the stability of the kayak both when moving and when stationary. Prevent roll from movement.
Innovation quality reliability Vikoma Vikoflex Boom System December 2015.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
Developing a session plan S3.1 session day Text Dimension 40 Arial BOLD Position: Horizontal 5.44 Vertical 2.40 Text Dimension 24 Arial BOLD ITALICS Position:
Learning Outcome Lesson Objective
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
土木工程概论 Introduction to Civil Engineering 第四章 建筑工程 Chapter 4 Building Engineering.
5. FERROCEMENT.
Truss Roof By PATEL POOJA D.
Metals Unit 212/255 – Principles of Fabrication and Welding Technology.
South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 WARM, HUMID CLIMATE.
CARE in Emergency Shelter and Reconstruction. 1. What is Our commitment to Shelter? 2. What impact does Shelter have? 3. What are the programming options.
Concrete Repair.
TYPES OF CHASSIS FRAMES
The NxtWall Advantage.
My engineering project tipping swarf bin
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Replacement of Vechicle Bridge over Spring Creek Centre County, PA
Chapter 2 The Process of Design.
Innovative Cable Management System
Product Development Scenario Overview
Shipping and Transport College Rotterdam
Refugee Housing Unit PROJECT PRESENTATION IN SHELTER CENTRE
REFUGEE HOUSING UNIT RESEARCH AND DEVELOPMENT PROJECT
OCP Engineering Workshop Rack & Power, Advanced Cooling Solutions, Data Center Facility
Presentation transcript:

host SDC/SHA May 2005 introduction project focuses on the design and deployment of warm climate emergency shelter for a family of 6 people latest phase of ongoing Shelter Centre exploration of emergency family shelter last meeting, presented a tunnel shelter this presentation on an alternative structural system to the tunnel over this summer, a volunteer project team will develop a covering developing an idea of Wolfgang Neumann, former UNHCR senior physical planner, for a frame tent I would like to thank Allan McRobie, Stephen Pearse, Lizzie Babister, Pete Manfield, Peter Guthrie and Jo Da-Silva for their contributions and advice projects 3G shelter project awarded RIBA / McAslan bursary

host SDC/SHA May 2005 ‘3G shelter’ project aims further the development of emergency family shelter develop a prototype shelter compliant with the OCHA performance standards for emergency family shelter collaborate with manufacturing specialists to streamline the mass production of the design develop a series of procurement options to facilitate flexibility of response investigate the scale and cost of deployment of emergency family shelter projects 3G shelter

host SDC/SHA May 2005 schedule the project has been split into two phases phase 1: University of Cambridge engineering Masters project generation of concept designs fabrication of prototype frame structural testing of prototype phase 2: summer Shelter Centre volunteer team research design of covering solution investigation of modular structures quantification of user adaptation options projects 3G shelter

host SDC/SHA May 2005 concept design a series of concepts were generated building upon the standards presented at he end of the OCHA publication ‘Tents’: social performance buildability repairability adaptability modularity physical performance usable area usable volume durability structural integrity projects 3G shelter

host SDC/SHA May 2005 frame projects 3G shelter

host SDC/SHA May 2005 frame features components: 18 x 1.9 m aluminium square hollow section extrusions 9 x custom extruded aluminium joint shelter width: 3.4 m shelter length: 3.9 m useable internal volume: 35.7 m 3 useable internal area within frame: 13.5 m 2 useable internal area with vestibules: 21 m 2 internal height within frame: 100% greater than 1.8 m weight, frame only: 20 kg estimated cost, frame only: $120 (manufactured in UK) projects 3G shelter

host SDC/SHA May 2005 projects 3G shelter joints joints are custom designed provide rigid connection between structural members manufactured by extruding aluminium component weight: 0.2 kg

host SDC/SHA May 2005 frame materials aluminium is used for both the members and joints easily recyclable material increases economic value to beneficiaries reduces the environmental impact associated with camp closure high strength to weight ratio reduces logistics costs and increases portability does not require corrosion protection ductile material easy to extrude can be replaced by galvanised or stainless steel there is a potential problem of beneficiaries selling their shelter projects 3G shelter

host SDC/SHA May 2005 durability design subject to a durability hierarchy projects 3G shelter increasing importance

host SDC/SHA May 2005 durability robustness: frame designed to withstand winds of 75 km/h frame can be strengthened by the addition of bracing joints designed to carry significantly higher loads than members repairability: testing shows that failure occurs within 100 mm of end of member members can be adjusted in length to repair damage minimum number of components enables interchangability replaceability: straight members can be replaced by locally available materials such as bamboo or sticks projects 3G shelter

host SDC/SHA May 2005 adaptability distributed emergency shelters can often be adapted to: better suit the needs of the beneficiaries allow for cultural differences allow for differences in climatic conditions the frame is designed to facilitate this process vertical walls can support mud brick construction pitched roof can support insulating material or long term improvements such as the addition of tin sheeting height of frame allows roof to be sectioned off to form a ventilated insulation layer common structural form aids user understanding projects 3G shelter photo source: CRS

host SDC/SHA May 2005 modularity tunnel form shelters are modular in one dimension only most recently developed shelters have adopted this shape difficult to use for infrastructure vertical walls enable the frame to be modular in two dimensions modular frames can be used to support large families modular frames can be used to support camp infrastructure projects 3G shelter

host SDC/SHA May 2005 manufacture structural members and joints are aluminium extrusions members are a standard size joints require a custom extrusion die ~$1200 extrusion is a well established manufacturing process low production times minimal machining required good quality control consequently: quick response times low production costs projects 3G shelter

host SDC/SHA May 2005 procurement there are two commonly followed procurement routes: manufactured subject to framework agreements and stockpiled manufactured in situ from locally procured materials there are advantages to both methods: stockpiling allows fast response to emergency situations manufacturing in situ can make use of the available workforce and can reduce logistics costs there are also disadvantages: stockpiling and air freighting are expensive manufacturing in situ requires technical assistance projects 3G shelter

host SDC/SHA May 2005 response options frame design appropriate for both procurement routes can be stockpiled to ensure fast response aluminium industries can be found worldwide allowing local procurement of materials simple nature of frame allows for different response options shelters can be supplied in varying degrees of provision option 1: frame and cover option 2: frame – use plastic sheeting off-the-roll option 3: just joints – locally procure members option 4: locally procure all materials response options may reflect differences in conditions projects 3G shelter

host SDC/SHA May 2005 summer research team of 5 volunteers will work on further development complete cover design fabricate cover prototype quantify customisation options investigate modularity load test joint extrusion projects 3G shelter

host SDC/SHA May 2005 cover covering still in concept generation stage plastic sheeting off-the-roll tailored solution tailored lining design will aim to: prevent ponding minimise stitching on the outer fly avoid use of guy-ropes vestibule spaces will be added at either end of the shelter increases covered floor area to meet Sphere and UNHCR guidelines creates an easily adaptable space projects 3G shelter

host SDC/SHA May 2005 further studies project aim to investigate the scale and cost of deployment require data: estimated operational and logistical costs per shelter number of shelters deployed annually number of displaced people under operational care if anyone would like to follow the project more closely if anyone would like to follow the summer project more closely projects 3G shelter