SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux.

Slides:



Advertisements
Similar presentations
Microsoft® Word 2010 Training
Advertisements

Lesson 9: Looking at the Windows Desktop
T-Mon SERVER CONNECTOR
Windows - Desktop Whats on the selected background My Computer My Documents Recycle Bin Application shortcuts Files and Folders (creates clutter) Task.
MHSL - Dolphin Training Class
Introduction to Operation of the XL-30 Scanning Electron Microscope Tutorial # 1 Overview of XL-30 Microscope Control Program.
KompoZer. This is what KompoZer will look like with a blank document open. As you can see, there are a lot of icons for beginning users. But don't be.
X-Media V2.0 Healthcare Training Jayex Technology Limited X-Media V2.0 March 2010 v
Using Telemedicine Equipment. Overview The ‘Big’ Picture The ‘Bigger’ Picture Equipment Setting Up A Video Conference Conducting A Video Conference Common.
Enlighten V2.2 Manual – User Level Access
Postsecondary Education Participants System Training Guide September 2013 Volume V (Visit our www2.ed.gov/offices/OSFAP/PEPS)
 The easiest way to put Ubuntu onto your stick is to use the USB installer provided at pendrivelinux.com.pendrivelinux.com  You’ll need to download.
Microsoft Windows Vista Chapter 5 Personalize Your Work Environment.
SPS Secondary Beam Experimental Areas Access System 7 September 2012.
S2 – COMMUNICATIONS UNIT
Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
Create your first document
Introduction to Operation of the XL- 30 Scanning Electron Microscope Tutorial # 2 Introduction to Operation and Imaging.
1. 2 LXU800 User’s Manual 1.Installation – Windows XP UI Features Introduction Data Connection & Disconnection.
Lawson System Foundation 9.0
Downloading and Installing PAF Insight PAF Insight can be easily downloaded Or can be installed from a CD A license is needed t0 activate the program.
Getting Started with Expression Web 3
TWU Student Union Online Reservation System Training Session.
© Ms. Masihi.  The Dreamweaver Welcome Screen first opens when you start Dreamweaver.  This screen gives you quick access to previously opened files,
Excel Worksheet Basics Terminology Navigation The Ribbon 1 Nolan Tomboulian Tomboulian.wikispaces.com.
Basic Administration.  Familiarize support staff with basic DSX administrative tasks  Provide expedited service to customers  Minimize the involvement.
Teach Yourself Windows 98 Module 2: Working with Files, Folders, and the Desktop.
Microsoft ® Office Word 2007 Training Create Your First Document ICT Staff Development presents:
Using FrontPage Express. Slide 1 Standard toolbars and menus Time indicator: gives an approximation of download time of the page.
Exploring Your Desktop To run presentation, please click on bottom arrow to right to change to next frame.
Parent Guide for staying connected. To Begin using Skyward Family Access you will need:  A computer connected to the internet  A web browser (Windows.
Unit 7- Essential Windows Skills.  Log on & off, shut down, and restart the computer  Identify elements of the OS desktop  Identify the icons used.
East Area Secondary Beam Control User Guide L.Gatignon / AB-ATB 12 June 2008.
East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.
Windows Tutorial Common Objects ACOS: 1, 4. Using the Taskbar 1. Using the taskbar, you can switch between open programs and between open documents within.
Unit 6- Essential Windows Skills.  Log on & off, shut down, and restart the computer  Identify elements of the OS desktop  Identify the icons used.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
MODULE 2 Microsoft® Windows 7 Chapter 1: Navigating around Windows Chapter 2: Managing Files and Folders Chapter 3: Working with Windows Settings, Gadgets,
By Felixberto Dominic B. Eruela.  Using a computer to create, edit, and print documents. Of all computer applications, word processing is the most common.
Microsoft ® Word 2010 Training Create your first Word document I.
Photoshop CC Workspace
Introduction to FrontPage and Web Page Design. Topics Logging in to your site Creating a webpage Text formatting Page backgrounds Linking webpages Links.
Computing Fundamentals Module Lesson 7 — The Windows Operating System Computer Literacy BASICS.
Introduction to KE EMu Unit objectives: Introduction to Windows Use the keyboard and mouse Use the desktop Open, move and resize a.
PART 2 INTRODUCTION TO DYNAMIC WEB CONTENT AND PHP.
Adobe Photoshop CS5 Chapter 1 Editing a Photo. Start Photoshop and customize the Photoshop workspace Open a photo Identify parts of the Photoshop workspace.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Staff Module and Summary of Changes 1. Icon Changes: Page 3 Signing In and Password/Pin Changes: Page 4 Logging Out: Page 8 Staff Module Changes: Page.
Version 1.0 3/23/2007 © 2007 ANSYS, Inc. All rights reserved. Inventory # W6-1 BladeModeler 11.0 ANSYS, Inc. Proprietary BladeModeler 11.0 Practical.
Folio3 IPhone Training Session 2 Testing App on device Presenter: Imam Raza.
CHANGING THE VOLUME Click the volume icon in the bottom right hand corner of the screen.
T29 Upgrade changes. WebEx is changing in the latest release. From 19 th February WebEx will be upgraded to the latest version. Cisco introduces several.
Login Screen Step 1: Please Enter your individual Login Id and Password Step 2: Click on Submit Button.
Section 4 The Basics of Windows 7. Windows 7 Versions  Home Premium  Professional  Specialized.
SNG via Webinar. Where’s Webinar??  Double click Aflac 2000 folder  Highlight “SNGWebCommunicator”  Right Click and “Send To - Desktop”
SIGMA Requestor Training In this presentation we will cover : How to log a Sigma ticket How to update a ticket via the notification function How.
Orders – View and Print Boeing Supply Chain Platform (BSCP) Detailed Training January 2015.
UNIT 1: Introduction To The AutoCAD Interface Objectives: Be able to identify, describe and/or apply… The key components of AutoCAD interface The AutoCAD.
FrontPage & Web Page Design. Starting FrontPage Click on the FrontPage icon in the task bar at the bottom of the screen or Locate it from the programs.
Version 1.0 3/23/2007 © 2007 ANSYS, Inc. All rights reserved. Inventory # W4-1 BladeModeler 11.0 ANSYS, Inc. Proprietary ANSYS BladeModeler 11.0.
User guide for Direct Observations equipment use
Trackpad. Trackpad The Start menu The Start menu provides quick and easy access to the applications available on your computer. Within the.
Access to the experiment
Arab Open University (AOU)
My Learning Plan End User training
Manual Water Ski Directory
FCL – Administration Tool
Presentation transcript:

SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux computers in that same room. Details are described in the green folder on the table in the EBCR Generalities on beam control Further help can be obtained 24 hours per day from the CCC: Call Booting the computer The computers auto-boot: please do not type a user name or password, but wait 30 seconds for the computer to start up The Cesar control system Cesar can be started by right-clicking on the desktop. Task icons allow to perform specific tasks. The menu bar and ‘physicst tree’ are more for experts. Workspace tabs Magnet status Rectifier status Physicist tree Beam stopper status EXPT status Scintillator status XDWC profiles XDWC status Scans Beam file browser

Switching off and on the beam Access to the beam zone is only possible when the beam is safely stopped. The beam is stopped by one (T10, T11) or two (T9) beam stoppers. The Beam Stopper Status allows to put them IN (beam stopped) or OUT. Select the beam stopper(s) and click Move in or Move out. In case of Cesar problems In case Cesar blocks or does not behave correctly, you may stop it by closing the Cesar window. It can be restarted by a right-click in the desktop and selecting CESAR. In the EBCR, please click in the tab of the work space for your beam line! In case you do not manage to solve the problem, please call the CCC (76677). Only when the beam stopper(s) is (are) IN the beam, you may control the state of the access door via the touchscreen next to the door. The only state of the door allowing beam is CLOSED. The LOCKED state does not allow beam. In KEY ACCESS, every person entering the zone must take a key. When all keys are back, anyone can close the zone again. FREE ACCESS allows to enter the zone without a key. However, going back to CLOSED requires a full search (patrol) by a trained and authorised person from your team! Finally, only use the Emergency Passage button in the door for real emergencies! The beam stoppers will only move out when the zone is CLOSED !

Magnet Control Click on the Magnet status icon The Read column shows the actual value, the BeamRef the last requested value. You may change the value by selecting a magnet and clicking on Set. BeamRef and setting can also be modified by loading a beam file. A ‘F’ in the 7 th column indicates that the BeamRef is different from the current in the active beam file (e.g. by tuning its value). You may also select settings according to the reference (plastified) sheets in the control rooms, also available on the East Area web page. However, all horizontal bends except the last must always be on nominal! Positive currents for positive beams, negative currents for negative beams (except for the CLOUD big beam). In case there is a problem (shown in red), i.e. Read and BeamRef stay different, you may use the Rectifier status to cure it: Please select the magnet/rectifier affected and try Reset, Standby, On and Set current (or Set to BeamRef in the magnet status) until it works. In case you don’t manage, call the PS operators in the CCC. BHZ and BVT stand for Bend HoriZontal and Bend VerTical, respectively. QDE and QFO for Quad DEfocusing or Quad FOcusing (in the horizontal plane)

Collimator control Collimators can only be controlled locally from the racks in the EBCR. If you want to select ±X mm for the gap of the collimator, dial 50+X/2 on each of the two thumbweels of the colllimator in question and then push on the red strobe buttons. The collimator jaws will slowly move to the required positions, as indicated (in mm) on the LCD screens. Normally the horizontal collimator controls the momentum spread and the vertical one the vertical acceptance. Target control The choice of target heat (4 or 6: electron enriched, 11 : hadrons) is made by the CCC, following discussion at the schedule meeting. Beam Files Some pre-defined beam settings are available from the Beam File Browser: A Beam File is a list of currents. You may select a file and Load it (i.e. activate it). After beam tuning you may ksave the settings by ‘BeamRefs -> Selected File’. You may also create a new file at a different energy by the Extrapolate button.

MONITORING YOUR BEAM IN THE EAST AREA The beam intensity The primary beam, as well as the primary production target are controlled by the CCC operators (tel ). You may check the quality of the incident proton beam via the Scintillator status: The TELEscope reading is an indication of how much beam hits the primary target properly. A good reading is above ppp. The SCINT1 reading gives the intensity of the beam at the end of the line. The EXPT scaler status shows the reading of the experimental scalers. You may provide NIM signals from your own detectors to the beam control system via patch panels in your control room. The beam profile The Delay Wire Chamber Profile knob shows the horizontal and vertical beam profiles at the end of the beam line. The scale is in millimeters. Eg. in T9. The steering can be adjusted with the last BHZ and with BVT1. If you move the focus far downstream (with the last two quadrupoles, see the listings in the control room)), the profile in the XDWC will quickly get very wide! The DWC status panel shows the status, but adjustments are reserved to the experts.

The VISTAR pages A VISTAR pages is available from the Web or on the TV screen in the control rooms: The curve shows the time distribution of the incident protons over the 400 msec spill. The green dots show the recent history of TELEscope readings. Above the dots the primary target head number is shown. Head 0 indicates a problem. On the right hand side the status of the beam stoppers is shown. Another page shows the overall PS status: