TRW Automotive November, 2004 Visit

Slides:



Advertisements
Similar presentations
How to Use Stowe School District
Advertisements

PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
Polycom Quotes on Demand Tool Partner User Guide Version 1.1
Using Track Changes in Microsoft Word Navigating Directions Click on the arrows or the home button located in the bottom right-hand corner of each.
2 eGrants Coaching Unit 3 create/edit Service Opportunity Listings Grantee Recruiter search for listings, register, & apply to serve Applicants view.
Kabel Nathan Stanwicks, Head Circulation and Media Services Department Electronic Reserves Introductory Tutorial for Faculty.
Procurement Card Training Strategic Account Management (SAM)
1 of 6 Parts of Your Notebook Below is a graphic overview of the different parts of a OneNote 2007 notebook. Microsoft ® OneNote ® 2007 notebooks are digital.
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Enrollment Manager Presented By: Shaun McAnulty. ENROLLMENT MANAGER  Came about as an Enhancement request, users wanted a single location to track and.
Chapter Accreditation Online System Usage Tutorial Department of Member Relations & Grants National Children’s Alliance.
How to Get The Most Out of Outlook 2003 Michele Schwartzman Division of Customer Support Summer 2006.
Outlook Web Access (OWA) is a web mail service of Microsoft Exchange; allow users to connect remotely via a Web browser OWA is used to access ,
Using Microsoft Outlook: Basics. Objectives Guided Tour of Outlook –Identification –Views Basics –Contacts –Folders –Web Access Q&A.
TRW Automotive December 09 Visit
Toll Free: Project Manager Tutorial.
NITAAC Customer Support Phone: Website: NITAAC.nih.gov Customer Guide for using the electronic Government.
Lawson System Foundation 9.0
SATERN for Supervisors May Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.  Log.
Lesson 4: Using the Calendar
Welcome to the Southeastern Louisiana University’s Online Employment Site Applicant Tutorial!
Novus HR Application Review Process Human Resources Qualifying Applications HR Sending Applications to Department/Search CommitteeHR Sending Applications.
Welcome to the University of West Florida Online Employment System Applicant Tutorial.
SMART Agency Tipsheet Staff List This document focuses on setting up and maintaining program staff. Total Pages: 14 Staff Profile Staff Address Staff Assignment.
Getting started on informaworld™ How do I register my institution with informaworld™? How is my institution’s online access activated? What do I do if.
Classroom User Training June 29, 2005 Presented by:
TRW Code Updates Planned for ERD Activity in Windchill CRS User Help Guide for New System Changes October, 2005 TRW Automotive September, 2005 TRW Automotive.
LBTO IssueTrak User’s Manual Norm Cushing version 1.3 August 8th, 2007.
Career Services Center Employer Training. This is the main login page. The link can be found at Employers.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
1 OPOL Training (OrderPro Online) Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
VistA Imaging Capture via Scanning. October VistA Imaging Capture via Scanning The information in this documentation includes only new and updated.
SATERN for Supervisors Updated: January Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Training Guide for Inzalo SOP Users. This guide has been prepared to demonstrate the use of the Inzalo Intranet based SOP applications. The scope of this.
0 eCPIC User Training: Resource Library These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
Key Applications Module Lesson 21 — Access Essentials
XP New Perspectives on Microsoft Access 2002 Tutorial 1 1 Microsoft Access 2002 Tutorial 1 – Introduction To Microsoft Access 2002.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Users December 2009.
TRW Code Updates for WCRS Document Activity ERD, EAR and Part Generator Changes August, 2006 TRW Automotive August, 2006 TRW Automotive August, 2006.
TRW Engineering Change Request System {CRS} Released in the Windchill Environment Getting Started in WCRS TRW Automotive December, 2004 TRW Automotive.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto.
© 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice SISP 6.1 Delta Training Documentation.
SATERN for Supervisors Updated: December Session Objectives At the end of the session, participants will be able to:  Describe SATERN  Log in.
Confidential Web Ordering Overview. Confidential LOG ON:   Enter your login name &
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Hubnet Training One Health Network South East Asia Network Overview | Public and Members-only Pages; Communicating and Publishing using Blogs and News.
PestPac Software. Leads The Leads Module allows you to track all of your pending sales for your company from the first contact to the close. By the end.
Reliance PPAP Application. Reliance - PPAP The PPAP application is designed to generate and track the entire Purchase Part Approval Process. Reliance.
Document Module Features Streamlines the control, routing and revision process for critical documents and records Controls documents in any format (Excel,
Customize Your View of Data Training Presentation for Supply Chain Platform: BAE Systems May 2015.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
1 Logging into the new PCard (PaymentNet) System: PAYMENTNET * Introduction * May use IE 8.0 or greater or Firefox * Do not.
Orders – View and Print Boeing Supply Chain Platform (BSCP) Detailed Training January 2015.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
SCC P2P – Collaboration Made Easy Contract Management training
DSQR Training Reliance System
Helping Yourself in PD2 SPS Spotlight Series July 2015.
Microsoft Outlook By: Phuong Nguyen.
Materials Engineering Product Data Management (ePDM)
Boeing Supply Chain Platform (BSCP) Detailed Training
Active Orders Supplier Administrator Training Getting Started Activities This training presentation describes the Getting Started activities that will.
To the ETS – Encumbrance Online Training Course
Introduction to Database Programs
To the ETS – Encumbrance Online Training Course
Introduction to Database Programs
Using Microsoft Outlook: Outlook Support Number
Presentation transcript:

TRW Automotive November, 2004 Visit www.ptc.com 19-Apr-17 Engineering Change Request System {CRS} Released in the Windchill Environment User Training Manual Windchill 6.0 provides additional reporting capabilities associated with the new product centered approach to configuration management. TRW Automotive November, 2004 © Copyright 2000 Parametric Technology Corporation Visit www.ptc.com

Training Topics Introduction & Overview / Task Driven System CRS Access, Navigation, Setting User Profile Worklist, Search, Personal Calendars, Reassign, BOM View Part Master / Summary of all Part Data Review and Approve Change Issues Document Creation Part Generator / Clipboard Deviation, P&R & GI IPD (Internal Plant Document) Engineering Request Documents Value Additions & Technical Support

Engineering and Design Influence 19-Apr-17 About CRS - Global Overview/Impact - Design Release/Update Shared Drawing Use, Notifications, Approvals, BOM Control and Access, Multiple Manufacturing Centers, Customers, Suppliers Drawing Formats Drawing Formats Drawing Formats Drawing Formats Drawing Formats Drawing Formats Drawing Formats Alfdorf Engineering Center Washington/Mesa Engineering Centers Supply Base Supply Base Production Production Supply Base Production Supply Base Production Engineering and Design Influence Global Manufacturint Plants Supply Base Production Production Customer Assembly Plants Production Production Production Production Production Production Supply Base Supply Base Aschau Engineering Center Aschaffenburg Engineering Center Drawing Formats Drawing Formats Drawing Formats Drawing Formats © Copyright 2000 Parametric Technology Corporation Visit www.ptc.com

Our Global electronic system is called CRS (Change Request System), within the system we process various documents that are used to summarize all information that pertains to that document type ERD - Engineering Request Document authorizes the release of procedures, production and prototype drawings. Gathers customer, functional group and plant approvals. Identifies all impacted facilities and authorizes BOM activity. Requires addressing service, engineering tests, DFMEA, global and other issues. DEV - Deviations provide authorization for variances from the acceptable production intent on design, testing, shipments, bill of material (part replacement to prevent obsolescence or support availability), rework, part traceability, PPAP, recall and other conditions that do not meet production standards P&R – Process and Routing documents are used for supplier tool moves, line moves, tool refurbishment and component PPAPs. They describe and authorize a permanent change to a process and facilitate PFMEA and Control Plan document updates due to design change. GI - General Information notices are used for documentation, notification and confirmation of various engineering activity. CI – Change Issues are new documents used for information gathering and soliciting responses from selected individuals where posted and response dates are tracked. Responses can be used to support engineering decisions or represent concurrence from a supplier that drawings and PO’s have been received. IPD – Internal Plant Documents are new routings to be used for the notification and releasing of plant specific documentation. Very automated and simple to use

Engineering Part Release Process Improvements Note: A Change Issue can be used to gather and assemble engineering information prior to the initiation of an ERD. Essential Steps: All Parts Released in ERD and Notification made ERD Approval of Proposed Changes Drawings Completed and Registered (ERD Release) Part Utilization in Affected Mfg plants Global access to BOM information Continued

Engineering Part Release Process Improvements Continued

CRS Access & Navigation Internet Browser Internet Explorer 5.5 or higher URL: Training: http://wctrn4.washmi.trw.com/Windchill/wtcore/jsp/wt/portal/index.jsp Production: http://connect.trw.com/Windchill/wtcore/jsp/wt/portal/index.jsp Login Dialog Box: Enter User ID, & Password People Soft ID, if available, or, use your Email Address If you are new to Windchill (do not have a current ID and password) you will be sent an email prior to Launch Password can be Customized

How To Request a Userid How to Change a password if you have forgotten This must be completed prior to using the system If you do not have a user ID you can request one online. If you have forgotten your password you can request a reset.

CRS Access & Navigation Winchill Homepage CRS Main Menu Toolbar The remainder of these icons are used for administrative purposes. Access Worklist Setup Page Visualization Library Personal Cabinet Search Meeting Center

Setting User Profile From the Home Page, select My Profile Select Change User Preference *YOU MUST ENTER USER FACILITY AND FUNCTION to use the system.

Setting User Profile Select Facility from Change Facility Drop Down List (i.e. Plant) Select Function from Drop Down List (i.e. Job title) Change Password Utility (People Soft ID Or Email Address)

Worklist, Search, Personal Calendars, Reassign, BOM View, ENG Part List

Accessing the Worklist The Worklist supplies each user with “tasks” that allows the user to complete the activity indicated (varies with each document). Manage Layouts allows user to customize worklist, see next slide.

Accessing the Worklist Changing worklist layout The Manage Layouts feature allows the user to change the way tasks are displayed in their worklist. Each column can be sorted or grouped. *Note: the recommended Default for CRS users is as Shown above and results shown below.

Personal Calendar Delegate Task – used with a know time of absence The calendar allows the user to delegate tasks on indicated days. Look up another users calendar. Calendar will show users working days & If tasks will be assigned to a different user. Select days to delegate tasks, click delegate. Select User from list and click OK button. All tasks assigned on that calendar day will be reassigned to the indicated user. (New users name will now be written on that calendar day.

Reassigning Task If you received a task meant for someone else you can forward to the correct individual Check the “Work Item Selector” box and select the Reassign button. Select User to reassign to, and click Submit, task will delete out of worklist. The approval page of the document will show user 1 reassigned to user 2.

GroupWise Task Notification To access the worklist from your email notification select the “HERE” link

Example Task A Task is sent to a users worklist upon their role in the Work flow. For example, when a user creates any type of CRS document, a task will enter that users worklist. The Instructions indicate their next actions. The CRS document “ERD”, is accessed through a Link in the Task You may enter Comments that will appear in the Task that is sent to the next user in the workflow. An ‘OkToTool’ selection will need a Checker and a Release Analyst. Just the Release Analyst for a ‘Standard Release’ selection Selecting Task Complete continues the workflow for a newly created document.

Search options Windchill allows the user to search specifically for certain documents, reports, parts, etc. By entering a key word, Windchill will search for all documents including that word.

Example Search Results Example search results for all Released ERDs originating in Aschau.

Example Search Results Search on Part will give you results like below: Links to PartMaster Links to Spicer Links to Eng Part List

Example from Search Results - Eng Part List 19-Apr-17 Example from Search Results - Eng Part List Assemblies should have a link to launch their Eng Part List The First 4 Items in Yellow will come from the ERP systems and should be editable. The Revision Index should always correspond to the Part number and Revision . © Copyright 2000 Parametric Technology Corporation Visit www.ptc.com

View BOM from SAP From the WCRS homepage, select WCRS, View BOMs from SAP. Type the part number, select plant, effectivity dates and click single level or multiple level query.

Example of Single Level BOM Query from SAP Note: View BOM from Maxcim is used the same.

Part Master

Part Master Link to all drawings registered (markups, released, etc.) 6L3435611B08AAW 000395, 000398 ENG Part List 6L3435611B08AAW B 6L3435611B08ABW Link to all drawings registered (markups, released, etc.) Continued

Part Master, cont. Part Master includes all platforms affected, and all related parts (service numbers, customer numbers, colors, SAP numbers) if applicable.

19-Apr-17 Change Issue © Copyright 2000 Parametric Technology Corporation Visit www.ptc.com

System Overview Informal information gathering tool – CI workflow Many uses exist for this tool. The routing, sharing, concurrence, gathering of information can easily be acquired through this workflow and available for decision making or use as an attachment to an ERD. When reviewers have responded or a Maximum of 5 working days, the Change Owner will receive another task summarizing the reviewer responses.

Creating a Change Issue 19-Apr-17 Creating a Change Issue A Change Issue is an informal document, that can be used for: Gathering ideas Obtaining, Attaching or Sending files Attaching to a CRS Document when beneficial Select WCRS from the menu bar. Select Create CI – Change Issue. © Copyright 2000 Parametric Technology Corporation Visit www.ptc.com

Creating Change Issue, cont. Complete all fields on Request screen. Fields flagged with “*” are required. When attachments are completed select WorkList link. Click Save For attachments select Browse to locate file, when finished adding files, select Complete. Link to add attachments Continued

Creating Change Issue, cont. By selecting Worklist from Change Issue you would view as below Select link to launch into task. OR: Task can be accessed via Groupwise notification Select link.

Creating Change Issue, cont. This is the Change Issue Task Link to view Change Issue To add Program Manager or Reviewers, select Add Users button. Search for users, select and click Add. Multiple users may be selected from this window. Once finished, select OK. Select from available options. Perform Review (send to Reviewers) or to Program Manager. Select Task Complete

Completing a Change Issue Once the Change Owner accepts the final task, the Change Issue will move to ‘Completed’ State. Once a Change Issue is complete, it may be attached to an ERD for supporting documentation if needed. A Change Issue may only be attached to one ERD.

19-Apr-17 Part Generator The HTML based product structure viewer has been enhanced in Windchill 6.0. The new viewer has more user friendly functions, has been enhanced to accommodate new functional areas and allows users to trace more links to related information. © Copyright 2000 Parametric Technology Corporation Visit www.ptc.com

Part Generator From the Windchill home page, select WCRS from the menu bar on the left. Select Part Generator. You have the option to create TRW Part Numbers, Non-TRW Part Numbers (admin only), TRW Chart Part Numbers or Engineering Document numbers i.e. specs, procedures.

Part Generator Select from pop-up window Part Description & Commodity Code. All fields except for Part Ref. Desc are req’d. All Part or Document Types Can be Selected from this field * Buyer Mary Jane - Plastic The Clipboard will store all parts that you have previously created. Select Number of Parts to Generate and select Create Part(s).

Updating/Viewing Parts Created Parts – The Clipboard Part Generator will automatically pull a CV & DV part. Select the links to view the part master. The update link will allow you to change any information if needed. Example clipboard.

Engineering Request Documents, Creation and MU Example

Engineering Request Document Create From the Windchill main menu select Create ERD.

Engineering Request Document Request Page Documents/Drawings for Release: Any document to be released within the ERD. User Reference Documents: Attachment added for supporting documentation. Change Issue: Attach from within WCRS for link to files/approvals, etc. Windchill System Documents: Any document attached from within Windchill (i.e. Procedures, IP Documents, CAD files, etc.) Complete all required fields and click Save. WCRS will do three things: assign an ERD number add the attachment bars send a task to the creators worklist. Go to Part Submissions to complete ERD

Creating an Electronic Markup in Spicer Create new layer. Mark up drawing using tools on left side of screen. New Layer Line Arrow Circle Text **Include ERD#, revision, your name, and date in revision column Mark-up note. If ERD is Advanced Release or OK to Tool, also note on drawing.** Highlight Dimension Select Move/Resize

6. File type should be Spicer Document (.smf) Saving an Electronic Markup 1. File 2. Save As 4. Choose file location. This can be a folder created on your computer 5. Type file name (followed by .smf), use this format 3. Browse 33045678_A01.smf 6. File type should be Spicer Document (.smf) 7. Save

Engineering Request Document Part Submissions Once the Request page is complete, click Part Submissions to add parts to be released. Click here to add Parts. A Part Submission Wizard will pop up similar to that of a Deviation.

Engineering Request Document Part Submission Wizard Change Item Type: TRW Part Non-TRW Part Document Source Selection: Select from WCRS Copy from Submissions Already Defined Generate New Number (Links to Part Master) Current Part Number: Can be manually entered, or searched in WCRS Change Type: Initial Release Major Revision Minor Revision No Drawing Impact Obsolete Program Add 000553 Complete required fields and click Next. Step 2 will display the current status of the part in Part Master. Status on Pending ERDs will display all ERDs that that part is listed on and not yet released. Select revision that the new ERD will be superceding.

Engineering Request Document Part Submission Wizard Complete required fields in Step 3. and click Finish. WCRS will then ask if you want to add more Parts. Yes will direct you back to Step 1. of the Part Submission. No will close the window and exit the wizard.

Engineering Request Document Select PRA Task After completing Request Page & Part Submissions page, go to your worklist to access Task. Always review Instructions for each task. They are different for each step in the workflow. Enter comments if desired. A comment is required if user is canceling, or placing a document on hold. Select Standard Release or Ok to Tool/Advanced Release. This selection must match field selected on Request page. Select Design Checker (if Ok to Tool / Advanced Release), PRA, and select Task Complete.

Engineering Request Document Approval Team Review/Approval After PRA completes document, approval members can access task through their worklist. Link to view document. Recommendation: right click and select Open in New Window. This allows user to view document and close window vs. clicking back button to task page. Enter comments if desired. Required if placing on hold. Click Task Complete.

Engineering Request Document Part Detail page Update Print Print option allows user to select specific pages or all information to print. Document will be formatted and opened in new window. Select File, Print in browser. This link is available from all screens within the document. Click on part number to view drawings. Links will appear below.

Engineering Request Document Platform Page Select links to display platforms associated to that part number. Active part number will be highlighted.

Engineering Request Document Approval Page Approval page will display pending & completed approvals. Plant Facilitator may add approvers as required. Everyone has the ability to extend an FYI in any state of the document. WCRS will record and display sent to, sent from, date & comment.

Engineering Request Document Tracking Design approval by engineer. This box will auto fill via task. Approvals prior to submitting OTT/Adv. Release to PRA. Must be checked in Create State Approval by PRA after design has completed drawing(s). To be completed by plant personnel.

Deviation, GI & P&R

Creating a Deviation From the WCRS homepage, select WCRS from the menu bar. Select Create DEV - Deviation

Creating a Deviation

Creating a Deviation (Part Details) User must be in Update mode to add/update the part details page. To add parts, click the Add New Details button.

Takes you to Part Detail Wizard Complete the required fields using the Part Details Wizard. Select Finish when complete, the Part Details page will auto fill.

Creating a Deviation Active Part number will be Red Deselect the Unaffected Platforms in relation to this part number. Note: After you Save, now you have completed user input for the Deviation Now you can go to the Worklist and send to PRA for processing

Approval Page System will display all pending approvals. Hold comments will also appear under Pending Approvals Approvals with comments will appear under Approvals. Click Create FYI to extend FYI.

Creating a Deviation Once the deviation is complete, access task via worklist. Choose PRA Product Release Analyst, Add comments if desired and select Task Complete. This sends your newly created Deviation out for processing

Review and Approve Access Task via worklist or GroupWise notification. Review document by selecting link (right click and open in new window) After review of document enter comments if desired, select Approve or On Hold (comments required if placing the document on Hold) and click Task Complete.

Creating a GI

Creating a GI Enter Part Number and select Check. The system will auto fill all fields except for Part Summary. **Be sure to select Add button before switching screens or part will not be saved.**

Creating a GI Deselect the Unaffected Platforms in relation to this part number.

Creating a P&R Complete required fields, add attachments if desired and select Save

Creating a P&R Enter Part Number and click Check. Fields will auto fill, complete Part Summary and click Save.

Internal Plant Documents

Internal Plant Documents Create An IPD is used within Windchill to create documents used strictly for the originating facility. IPD’s may be used for: Manufacturing Instructions Plant documents Plant drawings Plant procedures QC documents Routing instructions Service documents From the Windchill main menu select Create IP document

Internal Plant Documents Create Document Categories include OPS Doc, Alert Doc, & CAD Doc. Your Primary content file will be your main document, any attachments may be added as necessary. Click on the appropriate link to browse files and add to IPD. Number may be assigned by originator, or if left blank, be a system assigned number (ex. IP000001 A team can be assigned as default according to user needs / document types. “*” indicates required field

Internal Plant Documents Properties Page Click on the Update link to make changes, add attachments, add carlines, etc.

Internal Plant Document Platforms Page In the Update mode, carlines may be added by clicking the Select Platform box, and removed by the remove link. Platforms may be searched by Customer, Platform ID, or Platform. Select the Platform by checking the box, and selecting OK. Upon completion of your Platform Page you go to your worklist and select reviewers to send out document for release into system

Value Additions - Incorporated into the New WCRS Web Based Secure System – Access through browser able to link pertinent information to parts. The system offers ‘Full Text Search Capability’ to retrieve registered documents Engineering Change Documents are - Easily understood containing all pertinent information Performance Improvements – The system speed will be greatly improved for Europe System Response Reminders – Example system will send a reminder to take action 7 Days after the posted date into a users In-Box through an email reminder System Referencing – Reference documents to parts in Part Master i.e. Specifications to Drawing # Improved Reporting – User selected reports and ad hoc tool for customized needs Proxy Delegation – A User can redirect their approval notifications if unavailable e.g.. Holiday Standardized Part Usage – All facilities using same part generator – part numbers and specs Change Issue – The informal information sharing and gathering tool Task Driven Responses – Workflow notifications communicate response through a task File Submissions - Improvements for drawing mark–ups, documents and attachments Service Improvements – Capture service impact for part interchangeability at time of design change. Customer production and service numbers captured in a system table Color Information – Colored parts will be captured on a table, very useful for part extensions

Value Additions - Incorporated into the New WCRS – Continued Improved commodity and buyer identification - Resulting in fewer change notification issues Simple, efficient CRS Document creation - To begin the routing and approval process Automated Final Drawing registration - upon engineers approval task Engineering Part List - Would supplement our global drawings and provide complete component part numbers and suffix levels (a complete BOM) for assembly and subassemblies. All Drawings Contained - In a single system and database (legacy - DMS and EIS systems) One CRS System - All product line information in a single database (legacy – 2 databases) Single System Access - View BOM’s contained in various manufacturing systems New Document Type IPD – This is a simple notification and document release workflow for plants ELV – Link in Part Master to Centor software where material and recycle information is viewed External Document Access – Connect WCRS on the road, at supplier, or customer with just an ID Drawing Distribution – Utility to provide electronic drawing distribution for purchasing, internal TRW and external users Standard Part Identifiers – Query attributes maintained for standard parts {based upon part description} – enhancement started, to be completed after launch Ease of ERD completion for charted parts – Indicate chart number, Parts display and are auto updated

Helpful Hints Saving your Userid and Password: When entering your USERID and PASSWORD, check the box “save this password in your password list”. Creating a Shortcut to Windchill: To add an icon to your desktop, log into the application. Once in Windchill, RIGHT CLICK anywhere on the page. Choose the “Create Shortcut” option. The system will tell you “a shortcut to the current page will be placed on your desktop”. Choose “OK”. To Open Documents in Windchill within the Application the Document was Authored in: Sometimes browsers are configured to open all documents within the browser application. To correct this, your browser must be configured correctly. Double click on the My Computer icon on your desktop Choose the “Tools” option (at top of page) Select “Folder Options” Select the “File Types” tab (at top of page) For each document type you access via Windchill: Scroll to the correct document type (e.g. Microsoft Word Document {doc}) Highlight the document type (e.g. Microsoft Word Document {doc}) Select the “Advanced” option (bottom of page) De-Select (remove checkmark from) the “Browse in Same Window” option. Press OK to save.

Technical Assistance To receive assistance with the use of WCRS Contact your Local Engineering Administrator, WCRS Plant Facilitator or IS Person Or Contact Your Local help desk (24 x 7) Please inform the helpdesk of your issue and the Document number if Applicable of which you are having the Issue with.

Training Manual Development Updates Updated OCT 12 2004 (Items 1-14) Slide 26 – Described by document link updates, ENG Part List, Pending ERD’s Slide 30 - Updated text at top of slide Slide 7 – User name text Slide 23 – Updated view to include Maxcim Slide 33 – References reviewers selections (was PM) Slide 13 – Updated text to say “see next slide” Slide 37 – Updated CC to Buyer Slide 40 – Updated view from WCRS menu Slide 41 – Updated text in lower text boxes Slide 44 – Added up-assembly impact to the part submission Slide 49 – Updated view includes Eng Pts List & update field Slide 60 – Added arrows Slide 64 – Updated deselect text for platform Slide 73 – Text added - Ease of ERD completion for charted parts